Mineral Hill’s largest annual drilling program since 1999.25,000 metres planned for FY27.

Mineral Hill · Condobolin, New South Wales

Five orebodies. Established infrastructure. 100%-owned.

Mineral Hill is an established gold and copper mine and processing complex in the Southern Cobar Basin of New South Wales. It has a long underground mining history and hosts five defined Mineral Resource areas, two existing declines, underground development and established processing infrastructure. Kingston owns 100% of the Mineral Hill operation.

12.1Mt
Current Mineral Resource
884koz
Contained gold equivalent
2.3g/t
Gold equivalent grade
100%
Ownership of the Mineral Hill mine and processing complex

Mineral Hill under Kingston

ASX:KSN

January 2022

Acquisition of Mineral Hill

Kingston acquired Mineral Hill, including the mine and processing plant.

2022 to May 2024

Tailings retreatment

Tailings retreatment operations.

June 2024 to May 2026

Open-pit mining

Open-pit mining and concentrate production.

June 2026

Care and maintenance

Pearse South open-pit production ended. Mining and underground development were paused and Mineral Hill moved to care and maintenance.

FY27

Drilling and technical program

25,000m drilling and technical program focused on building Resource scale and confidence.

Mineral Hill

Southern Ore Zone · Underground

Southern Ore Zone Resource increased by 50%.Further growth potential remains.

The Southern Ore Zone is Mineral Hill’s largest Mineral Resource and the source of its current underground Ore Reserve. It is a polymetallic system containing gold, copper, lead, zinc and silver, with existing underground access and a history of mining from the mid-levels.

The June 2026 Mineral Resource update increased the Southern Ore Zone Resource by 50% to 6.54Mt and increased Measured and Indicated Resources by 38% to 3.05Mt. The FY27 program combines infill and underground extension drilling to improve geological confidence, test extensions to the north and nearby mineralised zones, and support future Ore Reserve conversion and mine planning.

6.54Mt
Southern Ore Zone Mineral Resource
3.05Mt
Measured and Indicated Resources
700kt
Current Probable Ore Reserve

Selected Southern Ore Zone drilling results

  • KSNDDH08522.10m @ 1.62g/t Au, 1.47% Cu, 8.98% Pb, 3.13% Zn and 132g/t Ag from 209.0m (7.6% CuEq). Reported 9 July 2026
  • KSNDDH06422.3m @ 0.87g/t Au, 0.74% Cu, 1.34% Pb, 0.81% Zn and 33g/t Ag from 33.7m (2.7% CuEq). Reported 31 July 2026
  • KSNDDH06221.4m @ 0.46g/t Au, 1.22% Cu, 2.70% Pb, 1.96% Zn and 43g/t Ag from 38.6m (3.3% CuEq), including 7.5m @ 1.20g/t Au, 3.31% Cu, 5.67% Pb, 1.96% Zn and 76g/t Ag from 38.6m (7.3% CuEq). Reported 31 July 2026

Intercepts are downhole lengths, not true widths. Copper equivalent (CuEq) grades are as reported in the source announcements linked above, which set out the metal prices, recoveries and equivalence formula used. Exploration results are not Mineral Resources or Ore Reserves.

Core photographs from Jack’s Hut hole KSNDDH093, 179m to 192.15m, showing chalcopyrite, galena and sphalerite mineralisation

Core from KSNDDH093, 179m to 192.15m. Figure 5, Jack’s Hut Resource Drilling Results, 8 September 2026.

Mineral Hill

Jack’s Hut · Underground

Jack’s Hut: a potential additional underground ore source.

  • 1.64MtMineral Resource
  • 140kozContained AuEq
  • Own declineSeparate underground portal and decline

Jack’s Hut is located immediately south of existing underground development and has its own portal and decline, separate from the Southern Ore Zone. Its 1.64Mt Mineral Resource contains copper-gold and polymetallic mineralisation.

Recent infill drilling supported the existing geological interpretation and increased confidence in the location, continuity and grade of mineralisation around conceptual stope areas. The results will inform an updated geological model and mine-planning work, with an updated Jack’s Hut Mineral Resource estimate targeted for the March quarter of 2027.

Selected Jack’s Hut results, 8 September 2026

  • KSNDDH09113.00m @ 2.80% Pb, 2.48% Zn, 0.76% Cu, 0.88g/t Au and 16g/t Ag from 165.0m (2.9% CuEq)
  • KSNDDH09229.10m @ 1.16% Pb, 0.49% Zn, 0.43% Cu and 0.70g/t Au from 142.8m (1.6% CuEq), including 4.85m @ 4.59% Pb, 1.90% Zn, 1.51% Cu, 1.07g/t Au and 23g/t Ag from 167.0m (4.2% CuEq)
  • KSNDDH09413.00m @ 0.91% Cu, 1.04g/t Au and 4g/t Ag from 106.0m (2.2% CuEq), including 2.05m @ 2.39% Cu, 5.44g/t Au and 8g/t Ag from 113.0m (8.7% CuEq)

Source: Jack’s Hut Resource Drilling Results, ASX announcement of 8 September 2026. Intercepts are downhole lengths, not true widths. Copper equivalent (CuEq) grades are calculated as set out in that announcement. Exploration results are not Mineral Resources or Ore Reserves.

Other orebodies and targets

Other Mineral Hill Resource areas and growth targets

Red Terror and Parker’s Hill add to Mineral Hill’s defined Resource base, while Iodide, Bogong and other priority targets provide further opportunities for testing across the broader system.

214kt Mineral Resource

Red Terror

Red Terror hosts a 214kt Mineral Resource containing 16koz AuEq. FY27 underground drilling is planned to test potential northern and down-dip extensions of the high-grade mineralisation identified in recent drilling.

Underground extension target

3.57Mt Mineral Resource

Parker’s Hill

Parker’s Hill hosts a 3.57Mt Mineral Resource. Planned surface drilling at Parker’s Hill East will test for primary sulphide mineralisation beneath a historical supergene zinc intersection.

Surface discovery target

Iodide and Bogong

Near-mine targets

Planned drilling at Iodide will test whether polymetallic mineralisation continues at depth. Diamond drilling at Bogong will test a target approximately two kilometres from the processing plant. These form part of the eight priority target areas within the FY27 program.

Planned target testing

Processing and infrastructure

One of two polymetallic processing plantsin the Cobar region.

Mineral Hill includes an established 350ktpa processing plant with flotation and carbon-in-leach circuits. The plant is capable of producing copper, lead and zinc concentrates as well as precious-metal doré.

The plant and associated mine infrastructure are being maintained on care and maintenance while Kingston advances drilling, Mineral Resource updates, Ore Reserve conversion work and mine planning. Existing underground access, grid power, sealed road access and processing infrastructure provide an established operating footprint for assessing a potential future restart.

350ktpa
Fully permitted processing capacity
Two circuits
Flotation and carbon-in-leach
Multi-metal capability
Concentrates and precious-metal doré
Care and maintenance
Maintained while Kingston advances the Mineral Hill program

Follow Mineral Hill’s next phase

View Kingston’s ASX announcements, drilling results, Mineral Resource updates and corporate presentations, and subscribe to receive notifications when new company updates are released.