Open Pit Mining Commences at Pearse North
Released
Released
Announcement PDF
ASX/Media Announcement
18 June 2024
Open pit mining commences at Pearse North
Highlights:
•
Open pit drilling and blasting underway: Safe reintroduction of drill and blast operations to Mineral
Hill with the first blast fired at Pearse North.
•
Open pit mining underway: Digging and haulage operations have commenced at Pearse North.
•
First oxide ore delivered to the ROM pad: The recommencement of open pit mining is expected to
lift gold and silver feed grades materially.
Kingston Resources Limited (ASX:KSN) (‘Kingston’, or ‘The Company’) is pleased to announce the
commencement of open pit mining at the Pearse North open pit, with the initial blast occurring on 11 June
and first oxide ore immediately delivered to the ROM pad.
The commencement of open pit mining comes three weeks after the successful completion of the tailings
retreatment project. Hard rock mining operations ceased at Mineral Hill in 2016, under the previous owners.
The safe restart at Pearse North is a major step towards Kingston’s objective to become a regionally
significant producer.
Plant Refurbishment Program on Track
The Plant refurbishment program is well advanced, and Kingston expects to be treating open pit oxide ore in
July, with ore already being stockpiled on the ROM pad.
Local Hiring Initiative and Training
Kingston continues to focus on employing and purchasing local, ensuring the benefits of Mineral Hill's success
stay within the region.
Over the past three weeks, the Company has welcomed 15 new employees to the Mineral Hill team within
mining, processing and geology sections. The majority of these new employees are local residents of the
Lachlan Shire. The recruitment process is going well with an additional 13 people expected to commence
with Kingston during June and July.
During the transition from tailings to open pit mining, Kingston took the opportunity to expand training for staff,
with its operators undertaking registered training in Certificate III in Resource Processing or Surface
Extraction.
Kingston remains committed to strengthening its owner-operator mentality and building a mining team that is
multi-skilled and flexible, powering its growth as the Company continues to expand mineral resources and
increase the production potential at Mineral Hill.
ASX: KSN
Shares on Issue: 707M
Market Cap: A$54M
Cash: (8 April 2024) A$10.7m
202/201 Miller Street,
North Sydney, NSW 2060
+61 2 8021 7492
info@kingstonresources.com.au
www.kingstonresources.com.au
@KSNResources
Figure 1: Pearse North – surface cleared, and first pattern drilled out, Pearse South open pit shown in the background. Mining initially
commences in Pearse North and a cut back will commence on Pearse South.
Kingston Resources Managing Director & CEO, Andrew Corbett, comments:
"We are delighted to announce the commencement of open pit mining at Pearse North, which signifies a
major step forward for the Mineral Hill project. The safe reintroduction of drilling and blasting operations, and
commencement of mining activities are a testament to the hard work and dedication of our team.
"The Pearse North and Pearse South open pits will be the initial stages of our return to hard rock mining at
Mineral Hill, and we look forward to continuing to develop this project and delivering value to our
shareholders."
Figure 2: First oxide ore delivered to the ROM pad.
2
www.kingstonresources.com.au
Figure 3: Open pit blast.
Figure 4: Open pit excavation and haulage.
3
www.kingstonresources.com.au
ABOUT KINGSTON RESOURCES
Kingston Resources is currently producing gold from its Mineral Hill gold and copper mine in NSW and is
developing the 3.8Moz Misima Gold Project in PNG. The Company’s objective is to establish itself as a midtier gold and base metals company with multiple producing assets.
Mineral Hill Mine, NSW (100%)
•
•
•
•
•
Mine plan out to the end of 2027: Open pit and underground mining.
Significant upside: Current life of mine only utilises 22% of the current 8.9Mt of Mineral
Resources.
Infrastructure excellence: Extensive existing infrastructure with all permits and approvals
in place.
Exploration potential: Exceptional upside within current Mining Leases (ML) and
Exploration Licenses (EL).
Current Focus: Open pit mining at Pearse and finalisation of the Plant refurbishment for
gold/silver dore and concentrate production.
Misima Gold Project, PNG (100%)
•
•
•
•
•
DFS Validation: potential for a robust, scalable, and low-cost open pit operation.
Production Potential: Anticipated gold production of ~2.4Moz over a 20-Year Mine Life
(Avg. 128kozpa).
Strong Financial Viability: Pre-Tax Net Present Value (NPV) of A$956 Million (based on
a US$1,800/oz Gold Price).
Gold Price Upside: Highly leveraged to the upside of the gold price, amplifying potential
returns.
Current Focus: Prioritising ESIA reports, strategic funding & development strategies.
Mineral Hill is a gold and copper mine located in the Cobar Basin of NSW. In June 2023, the Company
updated its life of mine plan, including both open pit and underground mining until 2027. The processing plant
currently operates a CIL, and work is well advanced to recommission the existing crushing, grinding and
flotation circuits for gold, copper, lead and zinc concentrate production. The Company is focused on meeting
near mine production targets located on the existing MLs. The aim is to extend the mine’s life through organic
growth and consider regional deposits that could be processed at Mineral Hill’s processing plant.
Misima hosts a JORC Resource of 3.8Moz Au and an Ore Reserve of 1.73Moz. Placer Pacific operated
Misima as a profitable open pit mine between 1989 and 2001, producing over 3.7Moz before it was closed
when the gold price was below US$300/oz. The Misima Project also offers great potential for additional
resource growth through exploration success targeting extensions and additions to the current Resource
base.
For further information regarding the Misima Mineral Resource and Ore Reserve estimate, see ASX
announcements on 24 November 2020 and 15 September 2021 and 6 June 2022. Further information is
included within the original announcements.
The Mineral Hill Mineral Resource estimate outlined below was released in ASX announcements on 18
November 2021 (TSF), 15 March 2023 (Pearse South), 14 May 2024 (Pearse North), 24 November 2022
(Southern Ore Zone), 21 March 2023 (Jack’s Hut) and 13 September 2011 (Parkers Hill by KBL). The Ore
Reserve estimate outlined below was released in ASX announcements on 18 November 2021 (TSF), 15
March 2023 (Pearse South and Pearse North). Further information is included within the original
announcements.
Kingston is not aware of any new information or data that materially affects the information included in this
announcement. All material assumptions and technical parameters underpinning the Mineral Resources and
Ore Reserve estimates continue to apply and have not materially changed.
www.kingstonresources.com.au
4
This release has been authorised by the Kingston Resources Limited Board. For all enquiries, please contact Managing Director,
Andrew Corbett, on +61 2 8021 7492.
MINERAL RESOURCES AND ORE RESERVES
Misima JORC 2012 Mineral Resource & Ore Reserve summary table
Resource Category
Cut-off (g/t Au)
Tonnes (Mt)
Gold Grade (g/t Au)
Silver Grade (g/t Ag)
Au (Moz)
Ag (Moz)
Indicated
0.3
97.7
0.79
4.3
2.5
13.4
Inferred
0.3
71.3
0.59
3.8
1.4
8.7
Total
0.3
169
0.71
4.1
3.8
22.1
Reserve
Cut-off (g/t Au)
Tonnes (Mt)
Gold Grade (g/t Au)
Silver Grade (g/t Ag)
Au (Moz)
Ag (Moz)
Probable
0.3
75.6
0.79
4.2
1.73
4.1
Mineral Hill JORC 2012 & JORC 2004 Mineral Resource & Ore Reserve summary table
Resource
Category
Measured
Tonnes
(kt)
228
Gold
Grade
(g/t)
2.11
Silver
Grade
(g/t)
11
Cu %
1.3%
Pb %
0.5%
Zn %
0.3%
Au (koz)
15
Ag (koz)
80
Cu (kt)
3
Pb (kt)
1.2
Zn (kt)
0.7
Indicated
4,893
1.08
28
1.2%
1.7%
1.1%
169
4,361
47
70
42
Inferred
3,098
1.17
23
0.7%
1.4%
1.2%
117
2,253
22
42
38
Total
8,220
1.14
27
1.0%
1.6%
1.1%
302
6,693
72
113
81
Reserve
Category
Proved
Tonnes
(kt)
-
Gold
Grade
(g/t)
0.00
Silver
Grade
(g/t)
0
Cu %
Pb %
Zn %
Au (koz)
-
Ag (koz)
0
Cu (kt)
Pb (kt)
Zn (kt)
Probable
697
1.95
57
44
470
Total
697
1.95
57
44
470
1.
2.
3.
4.
5.
Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
Probable Ore Reserves are derived from Indicated Mineral Resources.
The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
The Ore Reserves form part of the Mineral Resources.
Total Mineral Resources account for mining depletion of the Tailings Project as at 23 April 2024
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr.
Stuart Hayward BAppSc (Geology) MAIG, a Competent Person who is a member of the Australian Institute of Geoscientists. Mr.
Hayward is an employee of the Company. Mr. Hayward has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Hayward confirms
that the information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form and context
in which it appears.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian Mine
Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has sufficient
relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the inclusion in this report
of the information pertaining to the Misima Ore Reserve in the form and context in which it appears.
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the inclusion in
this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and context in which it appears.
www.kingstonresources.com.au
5
Share your feedback
Discover