Long-term, Diversified GoldCopper Producer
Australian Gold Conference
August 2023
Andrew Corbett, Managing Director
✓ Mineral Hill delivering growth in gold and copper production
✓ 3.8Moz Misima Gold Project Definitive Feasibility Study complete
ASX: KSN
Important Notices and Disclaimer
Forward looking statements: Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects, are forward
looking statements. Such forward looking statements:
include, among other things, statements regarding incomplete and uncertain proposals or targets, production and prices, operating costs and results, capital expenditures, and are or may be
based on assumptions and estimates related to future technical, economic, market, political, social and other conditions;
are necessarily based upon a number of estimates and assumptions that, while considered reasonable by KSN, are inherently subject to significant technical, business, economic,
competitive, political and social uncertainties and contingencies; and
involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward
looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise. The words “believe”,
“expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward
looking statements. All forward looking statements made in this presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements
are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty therein.
Disclaimer: No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other person accepts any liability, including, without limitation, any
liability arising out of fault of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or implied is
given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation
assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products. The
information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has
been prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. Before making an investment decision, you should
consider, with or without the assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances. Past
performance is no guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral
Hill Production Expansion.
Exploration by Other Explorers
This presentation contains information sourced from the reports of Other Explorers. References to the original reports are provided as footnotes where the information is cited in this
presentation. KSN does not vouch for the accuracy of these reports. KSN has taken the decision to include this information as it is in the public domain and as we assess it to be of
relevance to shareholders and investors.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
2
Important Notices and Disclaimer
Underground Production Target
The LOM plan includes Mineral Resource Estimates from the Southern Ore Zone (SOZ) and Jack’s Hut to estimate the Production Target. All Ore Reserves and Mineral Resources
underpinning this LOM plan have been prepared by Competent Persons in accordance with the 2012 JORC reporting guidelines. Probable Ore Reserve provides 46% of the total LOM
processing plant feed tonnage. The Underground production target is based on Mineral Resource estimates and comprises Measured (7%), Indicated (31%), Inferred (56%) and unclassified
(6%) material.
There is a low level of confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of future results or events and should not be solely relied upon by investors when making investment decisions.
Further evaluation work and appropriate studies are required to establish sufficient confidence that this target will be met. The Company notes that the Project forecasts a positive financial
performance and is therefore satisfied that the use of Inferred resources in production target reporting and forecast financial information is not the determining factor in overall Project
viability and that it is reasonable to report the LOM plan with Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the forward-looking statements included in this announcement. The detailed reasons for that conclusion are
outline throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
3
Company vision
Becoming a leading ASX-listed mid-tier gold and copper producer, pioneering excellence and delivering
sustainable value to stakeholders
Producing gold & silver at Mineral Hill, generating excellent cash flows
Management team; jurisdictional experience and a track record of
success
Strategic asset location in NSW, with an operating mill and all
MLs/permits.
Exceptional growth opportunity; exploration upside & regional
acquisition
Extensive infrastructure and ability to extend the mine plan beyond 10
years
AU$18+ million cash and strong operating cashflow to drive expansion
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
4
High experienced and well regarded Executive Team
We have an excellent skill set within our team
Mick Wilkes
Andrew Corbett
Tony Wehby
Stuart Rechner
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Mick is a seasoned mining
professional with 35 years’
experience in the industry, primarily
in gold and base metals. He has
specialised in sustainable project
development, construction, and
operations throughout his career.
Andrew is a highly experienced
mining engineer with over 25 years
in mine management and financial
markets. He has an in-depth
understanding of mining, equity
markets, business development
and corporate strategy.
Tony is a highly experienced board
member and chairman, previously
Non-Executive Chairman of Tellus
Resources Limited and Aurelia
Metals Limited, and a Director of
Harmony Gold (Aust) Pty Ltd.
Stuart is an experienced company
director and geologist with a
background in project generation
and acquisition in Australia and
overseas. Mr Rechner holds
degrees in both geology and law.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
5
Kingston: delivering on our strategy
Mineral Hill (100%)
✓ Mineral Hill acquisition
✓ Gold production +256% YOY to
16,520oz in FY23
✓ Monthly gold sales increased,
AISC/oz reduced.
✓ Extended LOM schedule to
2027
✓ Mineral Resources updated
✓ Recommenced exploration
drilling on MLs and ELs.
Misima (100%)
✓ Mineral Resource to 3.8moz, Ore Reserve to 1.7moz
✓ Successful DFS with 20 year mineral inventory.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
6
Corporate snapshot
12 month Share Price Performance
Share price
$0.08
Market capitalisation
$38.8m
28 August 2023
Shares on issue
Market Volume('000) RHS
Close Price (A$) (LHS)
0.15
8000
6000
0.1
4000
0.05
Warrants & Options2
497.9m 98.7m
0
Aug 22
2000
0
Oct 22
Dec 22
Feb 23
Apr 23
Jun 23
Shareholder Structure
exercise price $0.14 & $0.20
Cash
Debt
$18.2m $10m
30 June 20231
1.
2.
● Quintana
● Delphi
● Winchester Investments
● Farjoy
● Other shareholders
13.4%
12.7%
7.1%
6.4%
60.5%
Estimated Cash balance, as at 30 June 2023, excludes $7.27m cash backed environmental bond
38m unlisted options @ $0.14, exp 31/7/25, 25m unlisted warrants @ $0.20, exp 07/07/2027, 35.7m unlisted warrants @ $0.14 exp 29/6/2028
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
7
Mineral Hill
Overview
Corporate Presentation August 2023
8
Mineral Hill – strategic location
Significant organic and regional resource growth opportunities
Abundance of gold-silver and polymetallic Cobar-style
deposits within approved ML’s and within trucking distance
of Mineral Hill processing plant
Wonawinta
Federation
Manuka
Aurelia
Location
516km W of Sydney NSW in Cobar Basin
Ownership
100%: 20 ML’s (4.85km2) and 2 EL’s (335km2)
Reserves (recovered)1,2
53,000 AuEq oz
Resources (recovered)1,2 795,000 AuEq oz (40% Cu, 30% Au)
Orebody
Structure controlled polymetallic vein and
epithermal Au
Mining Methods
Open pit and underground long-hole stoping
Water
Supplied from underground and site storage
Power
Mains with grid upgrade
Historical Production
396koz Au, 33kt Cu (plus Pb, Zn concentrate)
1. Gold equivalent ounces calculated based on consensus commodity prices with adjustments based on company
expectations. See Appendix for equivalency calculations
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for
additional Mineral Hill Resource and Reserve information.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
9
Mineral Hill – Evolution and Growth Phases
Long life, strategic asset in the southern Cobar region
Phase 3
Phase 2
Grow and Expand
Phase 1
Open-pit and Underground Mining
•
Targeting 30 - 35kozpa+ AuEq.
Tailings Project Cash Flow
•
•
Gold production from the Tailings
Project.
Multiple products for sale; gold & base
metals
•
•
Processing plant refurbishment.
Current LOM out to 2027+, potential to
significantly extend.
•
Underground re-entry.
•
Build out the Resources/Reserves
and refine mine planning.
www.kingstonresources.com.au I ASX: KSN
•
Target plant expansion from
350ktpa to 500ktpa (c45% uplift).
•
Target of 50kozpa+ AuEq.
•
Grow through regional acquisition,
leverage our strategic mill location.
Corporate Presentation August 2023
10
Mineral Hill – mining lease and infrastructure
Extensive existing infrastructure base
EL1999
Pearse Nth
• Numerous Cobar style mineral deposits all within approved mining
leases.
Mineral Resources
Additional Deposits
• Current cash flow from reprocessing historical tailings, owner miner.
• Full mine approvals, environmental permits & biodiversity offset
Pearse Sth
Hut
• Tailings facilities, water and power all in place
Parker’s Hill
East
GD140
• Residential workforce
• Owner mining focus
Parker’s Hill
TSF
• CIL with 700ktpa capacity.
SOZ
• Flotation plant capacity of 350ktpa.
EL1999
• Plant is in good condition, with thorough refurbishment underway.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
11
Mineral Hill – Initial LOM to 2027
Key stages in implementing transformational growth at Mineral Hill
Calendar Year
2023
2024
2025
2026
2027
Cash flow from Tailings Project
Processing plant refurbishment
Underground re-access works
Underground resource drilling
Open pit mining
Underground mining
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
12
Mineral Hill – production outlook
Zinc
Transitioning to open pit and underground mining
Lead
• Current cash flow from gold.
• Open pit production in April 2024.
FY261
• LOM production target at least out to 2027.
Copper
Silver
• High grade gold and silver from open pit mining.
Silver
• First copper concentrate in CY2025 from
underground mining.
Lead
Gold
Zinc
• Strong exploration potential within the current
mining leases.
FY251
Copper
Gold
Gold
FY241
Silver
1. Pie sectors based on proportion of payable metal.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
13
Mineral Hill – leveraging existing gold production from the Tailings Project
Tailings processing with CIL capacity up to 700ktpa
• Optimising current production; increased
throughput rates and increased recovery.
Quarterly Gold Production
• Gold production increased significantly, leading to
reduced unit costs since the start of the project.
Gold Sold (oz)
6,000
• Owner mining focus to drive down costs, use of
contractors minimised
5,000
5,000
4,500
Gold Sales (oz) and AISC (A$/oz)
• Allows TSF to be reused for future tailings storage.
AISC (A$/oz)
4,777
4,431
4,000
3,500
3,705
3,000
3,153
3,000
2,000
1,000
4,000
2,500
2,000
2,079
1,770
1,500
1,543
1,494
1,000
500
-
-
Figure: Tailings Mining Project – current high margin gold production
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
14
Open Pit Mining: Pearse South and Pearse North
High-grade gold and silver open pit mines providing strong cashflow potential
• New pit at Pearse North and deepening/cutback of Pearse
South.
• All permits and approvals in place.
• High-grade gold/silver ore
• Significant high-grade gold results from Pearse North1
• 39m @ 4.2g/t Au and 37g/t Ag from 37m, including
▪ 3m @ 26.7g/t Au, 27g/t Ag from 38m
• 10m @ 6.0g/t Au, 33g/t Ag from 72m
• 3m @ 5.5g/t Au, 6g/t Ag from 31m
• 11m @ 1.4g/t Au, 8g/t Ag from 136m including:
▪ 4.3m @ 2.4g/t Au, 16g/t Ag from 142m
• Pearse North and Pearse South mining to commence in Q1
2024
Figure: Recent and historical gold-silver intercepts at Pearse North relative to USD$1300 Au Ore Reserve pit shell
1. See KSN ASX announcements on 8 April 2022, 14 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
15
Underground Mining : Southern Ore Zone (Cu-Au-Zn-Pb-Ag)
Significant growth opportunity with outstanding copper and gold drilling results
• New MRE has increases of 114% in tonnage, 54% in gold
and 64% in copper. Contained silver, lead and zinc have all
more than doubled.
Tonnes (Mt)
3.80
Au g/t
1.29g/t
Ag g/t
19 g/t
Cu %
0.9%
Pb %
1.6%
Zn %
1.4%
• Low capital intensity with extensive development in place at
SOZ underground – significantly reducing development
costs
• Drilling highlights1:
• 39m @ 1.1% Cu, 0.7% Pb, 0.8% Zn, 0.93g/t Au, 12g/t Ag
from 161m
• 9.8m @ 4.22g/t Au, 0.7% Cu, 3.2% Pb, 3.2% Zn, 30g/t Ag
from 166m
• 2023 underground drilling program to commence next
quarter focusing on resource infill and extension
Figure: SOZ- long section demonstrates the infrastructure advantage of the SOZ with existing decline and level
development
1. See KSN ASX announcements on 18 May 2022, 16 August 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
16
Near Mine Drill Targets
Multiple drill targets to be tested within EL1999
• Primary focus on 15 new near mine targets with
potential to significantly expand contained copper and
gold.
• Multiple untested targets: none of the exploration
targets have been previously drill-tested.
• Focus on expanding mineral inventory for Mineral Hill’s
processing plant and extending LOM.
• Geochemical anomalies coincident with IP chargeability
anomalies.
• Multiple exploration targets with +20km of Lead in soil
anomalies in the regional EL8334.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
17
6
SIMBERI
St Barbara
Moz
66
Moz
LIHIR
Newcrest Mining
17
Moz
FRIEDA RIVER
PanAust
PORGERA
24
Barrick Gold
Moz
Misima
17
Gold Project
Papua
New Guinea
23
PANGUNA
Moz
27
Moz
OK TEDI
PNG Govt.
Moz
KAINANTU
K92 Mining
2
Moz
WAFI-GOLPU
Morobe Mining JV
HIDDEN VALLEY
Harmony Gold
WOODLARK
Geopacific
4
2
1.6
Moz
Moz
GOLD RIDGE
Moz
TOLUKUMA
2
Moz
PORT MORESBY
7
Moz
Misima Project
600km from Port Moresby
DFS Complete
Historically produced 4Moz AuEq
over 15 years
Corporate Presentation August 2023
18
Misima – definitive feasibility and Ore Reserve1
Large scale, long-life, low-cost open pit gold and silver mine
• High leverage opportunity on the gold price.
• DFS uses $1,800/oz gold price and 0.7 AUD:USD.
Gold price scenario of $2,000/oz lifts LOM NPV to
$1.3bn.
3.8Moz Gold
22.1Moz Silver
Resource
Resource
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
• Work is continuing to find optimal funding and
development options.
koz
Poured gold
Recovery
160
Production at AISC
100%
140
A$1,217/oz
20-year life of mine
120
95%
100
80
90%
LOM Revenue $6.1bn
60
40
85%
and
LOM pre-tax FCF
20
-
80%
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
19
Summary: focus on executing our clearly defined strategy
Leveraging existing gold-copper asset base while advancing future growth opportunities
Experienced management team focused on maximising returns
with the existing assets.
Current strong gold production rates and earnings set to continue,
expand into open cuts in April 2024, Underground concentrates in
early 2025 (gold and copper).
Current exploration drill program at Mineral Hill focused on nearmine targets, potential for near term catalysts.
Figure: KSNDDH015 - 71.9m: Chalcopyrite vein. Sample
interval 71.6m to 72.3m: 5.5% Cu, 0.5g/t Au, 13g/t Ag
(see ASX announcement on 24 August 2022).
Strategic location of the Mineral Hill processing plant provides
options for adding regional inventory.
Well-funded with ongoing cashflow and optionality with the Misima
gold project
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
20
Appendix
21
Regional exploration
Broader exploration strategy within EL8334
• Drilling to target coincident geophysical
targets (gravity and induced polarisation).
• Highly prospective geology and regional
scale structures.
• Lead in soil anomalies to be drill tested.
• Land access agreements in progress.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
22
Mineral Hill Mine – Resources & Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources.
• Polymetallic underground Mineral Resources.
• Additional resource areas to be estimated in CY23
(Parker’s Hill & Red Terror)
Total Mineral Resources
Total Probable Reserve Inventory
Pearse South
Deposit
Au
(g/t)
1,171
1.07
0
40
204
3.77
70
25
Pearse North
239
2.97
25
23
190
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
TSF
Cu
%
Pb
%
Zn
%
Au
(Koz)
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
2349
34
60
54
456
Au (g/t)
1.07
Pearse South
140
4.00
84
18
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
Pearse North
120
3.40
25
13
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
1,431
1.6
57
71
470
TOTAL
8,901
1.13
26
1.0%
1.6%
1.1%
323
6,566
72
113
81
www.kingstonresources.com.au I ASX: KSN
Ag (Koz)
Ag
(g/t)
Kt
TOTAL
Au (Koz)
Kt
1,171
TSF
Ag (g/t)
Deposit
40
Corporate Presentation August 2023
23
Mineral Hill – Social licence
Environmental and social licence to operate
• Stakeholder engagement – excellent relationship with landholders, community and Condobolin Chamber of Commerce
• Mining Licences (ML) granted
• Environment protection, cyanide and water permits in place
• Environmental Bonds in place with a staged payment schedule
• Development Applications (DA) approvals in place for tailings
(TSF), Pearse pits, SOZ underground
• Mine Operation Plan (MOP) in place for the tailings
retreatment, update required before re-commencing hard rock
mining
• Biodiversity offset in place, review underway to increase offset
by March 2023
• Dam Safety NSW site review complete
• Tailings Dam strategy
• TSF1 currently being re-processed, approval will be sought
for re-use as tailings storage on completion
• TSF2 approved, lift 4 & 5 designed providing storage
capacity for 2.5 years
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation August 2023
24
Competent Person Statement
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on
and fairly represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG
,who is a Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston
Resources Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that
the information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original report.
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly
represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources
Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original report.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
Competent Person’s Statement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward
(BAppSc (Geology)) MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston
Resources Limited. Mr Hayward has sufficient experience in the style of mineralisation and types of deposit under
consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the
‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears. All Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004
and are an accurate representation of the available data and studies for the Mineral Hill Mine. This information has not been
updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was
last reported. Work will commence on close of acquisition by the Company to bring each of the Mineral Resources into line
with the JORC Code 2012.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian
Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the
inclusion in this report of the matters based upon the information in the form and context in which it appears.
Kingston confirms that it is not aware of any new information or data that materially affects the information included in all
ASX announcements referenced in this release, and that all material assumptions and technical parameters underpinning
the estimates in these announcements continue to apply and have not materially changed.
Ore Reserve
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 06/06/2022
John Wyche
AMDAD
TSF
2012
KSN 18/11/2021
Jeremy Peters
Burnt Shirt
Pearse North
2012
KSN 15/03/2023
John Wyche
AMDAD
Pearse South
2012
KSN 15/03/2023
John Wyche
AMDAD
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 15/09/2021
Stuart Hayward
KSN
TSF
2012
KSN 18/11/2021
Troy Lowien
Groundwork Plus
Pearse South
2012
KSN 15/03/2023
Stuart Hayward
KSN
Pearse North
2012
KSN 15/03/2023
Stuart Hayward
KSN
The Competent Person (JORC 2012) for the TSF Ore Reserve is Mr Jeremy Peters (BSc, BEng) a Fellow of the Australasian
Institute of Mining and Metallurgy and Chartered Professional Geologist and Mining Engineer of that organisation. Mr Peters
is a full-time employee of Burnt Shirt Pty Ltd and has sufficient relevant experience to act as Competent Person.
Southern Ore Zone
2012
KSN 24/11/2022
Stuart Hayward
KSN
Jack’s Hut
2012
KSN 21/03/2023
Stuart Hayward
KSN
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and
who has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to
the inclusion in this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and context in which
it appears.
Parkers Hill
2004
KBL 13/09/2011
Anthony Johnston
KBL
Competent Person’s Statement – Ore Reserve Reported in Accordance with JORC Code – Mineral Hill
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code
2012 with exception of the Parkers Hill Mineral Resource Estimates that have been prepared by a Competent Person in
accordance with the JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the
information has not materially changed since it was last reported. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone
Mineral Resource estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes
created by the site survey department at the time of mining. These wireframes represent the mining activities at these
deposits to the best of Kingston’s knowledge although they are not to be viewed as complete or accurate in their entirety and
therefore mining depletion may be revised when Kingston is able to produce revised determinations on more complete data
and verification thereof. Information pertaining to Mineral Resource Estimates (MRE) and Ore Reserves (OR) in this
presentation has been previously released to the public. The tables on this page indicate the authors of the historical
Resources/Reserves and the dates they were initially published. Kingston is not reporting these estimates as its own with
exception of the MRE and OR for the TSF which has not been reported previously by any other company. The other original
reports are available through the ASX website.
www.kingstonresources.com.au I ASX: KSN
Mineral Resource
Corporate Presentation August 2023
25
Mineral Hill – Resources and Reserves
Attractive commodity base with significant growth potential
Total Probable Reserve Inventory
Measured Resource Inventory
Deposit
TSF
Pearse South
Pearse North
TOTAL
Kt
Au
(g/t)
Ag
(g/t)
Au
(Koz)
Ag
(Koz)
1,171
1.07
140
4.00
120
3.40
25
13
95
1,431
1.6
57
71
470
40
84
18
375
Deposit