Investor Presentation - Unlocking Mineral Hill Potential
Released
Released
Announcement PDF
Kingston Resources Limited
Unlocking the Potential of
Mineral Hill through the Drill Bit
Investor Presentation − June 2026
KINGSTONRESOURCES.COM.AU | ASX:KSN
Important notices and disclaimer
Forward Looking Statements
Certain statements contained in this presentation, including information as to the future financial or operating performance of Kingston and its projects, are forward looking statements. Such
forward looking statements: include, among other things, statements regarding incomplete and uncertain proposals or targets, production and prices, operating costs and results, capital
expenditures, and are or may be based on assumptions and estimates related to future technical, economic, market, political, social and other conditions; are necessarily based upon a
number of estimates and assumptions that, while considered reasonable by Kingston, are inherently subject to significant technical, business, economic, competitive, political and social
uncertainties and contingencies; and involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or
results reflected in such forward looking statements.
Kingston disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise. The words
“believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward
looking statements. All forward looking statements made in this presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements
are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty therein.
Disclaimer
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other person accepts any liability, including, without limitation, any liability
arising out of fault of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or implied is given as
to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation assumed
to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products. The
information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has
been prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. Before making an investment decision, you should
consider, with or without the assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances. Past
performance is no guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcements dated 27 June 2023 and 30 September 2024.
2
KINGSTONRESOURCES.COM.AU | ASX:KSN
Investment highlights
3
Unlocking the potential of Mineral Hill through aggressive exploration
1. See ASX Announcement from 20 May 2025
Plant expansion studies to investigate right sizing and configuration of the Mineral Hill processing facility
Key permits in place to enable processing up to 700ktpa, studies to commence on evaluating a higher throughput rate.
Strategically positioned with a fully permitted, 350ktpa polymetallic plant in the South Cobar Basin
Existing CIL and flotation processing facility with the ability to treat polymetallic ores
25,000m drilling program over the next 12 months to unlock the potential of Mineral Hill via Resource and Reserve expansion – increase
the mining inventory, Measured and Indicated Resources, mine life and higher production base
Strong balance sheet to execute drilling strategy with $45.0m in additional value to be received from the Misima sale1
Significant future value upside through deferred consideration from Misima: $10.0m (July-26), $10.0m (FID), $25.0m (royalty buy-back right)
Significant news flow pipeline
Regular drilling results from ongoing drill programs (multiple rigs) - extensional and brownfields exploration programs. Updated Resource
and Reserves, supporting a long mine life and larger production base
Extensive underground development and infrastructure in place
Two declines and associated underground development, vent rise and company owned underground fleet to support aggressive exploration
plan
Assessing all strategic avenues to maximise value for shareholders
To be undertaken in parallel with the aggressive drilling, resource development work and plant expansion
KINGSTONRESOURCES.COM.AU | ASX:KSN
Corporate snapshot
4
Shares on issue ~842m
Warrants1 130.4m
Share price - 11 June 2026 $0.040
Market cap $34m
Cash balance2 - 11 June 2026 $9.4m
Restricted cash for environmental bond $7.5m
Deferred Misima Payments3 $45m
1-Year Share Price Performance
1. 25m unlisted warrants @ $0.0816, exp 07 July 2027, 35.7m unlisted warrants @ $0.0816 exp 29 June
2028, 69.7m warrants @ $0.0879, exp 23 Feb 2028.
2. Cash balance excludes $7.5m cash backed environmental bond.
3. Comprises $10m cash payment on 11 July 2026, $10m cash payment on FID and $25m royalty buy
back value. Refer to slide 11 for further information.
Shareholder Structure
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
Market Volume('000) RHS Close Price (A$) (LHS)
17.6%
8.0%
7.7%
66.8%
Farjoy
Quintana
Winchester
Other Kingston Shareholders
KINGSTONRESOURCES.COM.AU | ASX:KSN
5
Highly experienced Executive Team
Significant experience across the development life cycle through to production
Mick Wilkes
Non-Executive Chairman
Mick is a seasoned mining
professional with 40 years’
experience in the industry,
primarily in gold and base
metals. He has specialised in
sustainable project
development, construction, and
operations throughout his
career.
Andrew Corbett
Managing Director
Andrew is a highly experienced
mining engineer with over 30
years in mine management and
financial markets. He has an in-
depth understanding of mining,
equity markets, business
development and corporate
strategy.
Stuart Rechner
Non-Executive Director
Stuart is an experienced
company director and geologist
with a background in project
generation and acquisition in
Australia and overseas. Mr
Rechner holds degrees in both
geology and law.
Tony Wehby
Non-Executive Director
Tony is a highly experienced
board member and chairman,
previously Non-Executive
Chairman of Tellus Resources
Limited and Aurelia Metals
Limited, and a Director of
Ensurance Ltd.
KINGSTONRESOURCES.COM.AU | ASX:KSN
Mineral Hill Overview
6
Brownfields mine strategically positioned with a 350ktpa
plant in the South Cobar, NSW
Existing brownfields mines with established underground
infrastructure in place including two portals, ventilation and the
company owned underground fleet
Fully permitted and strategically located 350ktpa (flotation & CIL)
processing facility located in the South Cobar Basin
Located in a proven NSW mining district with established
infrastructure and skilled mining labour
Central processing plant to several stranded assets lacking a pathway
to production
Tenure
20 ML’s
(4.85km2)
2 EL’s (335km2)
Resources1
790 koz AuEq
Mining
Targeting
5-year LOM
Processing
Plant
Existing:
350ktpa
Key Permits for:
Up to 700ktpa
1. Refer to slide 17 for the Mineral Resource calculation into AuEq.
KINGSTONRESOURCES.COM.AU | ASX:KSN 7
Fully permitted, 350ktpa processing facility with supporting infrastructure
✓ Existing 350ktpa processing facility, with CIL and
flotation capabilities to enable processing of polymetallic
ores from Mineral Hill and the region to produce dorè
and concentrates
✓ Mineral Hill is the only operational polymetallic
processing plant in the South Cobar Basin
✓ Successful recent trial copper concentrate production
de-risking event on reinstation of future base metal
concentrate production
✓ Key permits in place to expand the plant to 700ktpa
Plant studies to be undertaken to right size, configure
and optimise the plant to support natural underground
mining rates
Mineral Hill – Significant Existing and Permitted Infrastructure
Figure: Mineral Hill ROM pad stockpile and processing plant (June 2026)
KINGSTONRESOURCES.COM.AU | ASX:KSN 8
Forward work program focused on high-impact drilling to deliver an initial 5-year LOM
• 25,000m of infill, extensional and exploration drilling
• First large-scale drill program since the 1980s
• Diamond drilling underground at SOZ and additional rigs
to be mobilised (surface and underground)
• Drilling to expand existing 790koz AuEq resource1
• Vision: expand the resource and reserve base to deliver a
robust, material increase to the LOM and make new
discoveries
• Key drilling focus areas :
• Southern Ore Zone (SOZ) - extensions adjacent to
existing resources
• SOZ Footwall - step-out expansion drilling
• Jack’s Hut – aiming to cement a second production area
• Iodide – extensions to the south of Jack’s Hut
• Parker’s Hill East – discovery of a potential offset of the
large Parker’s Hill main deposit
25,000m Drilling Program to Unlock the Potential of Mineral Hill
Figure: Key focus areas for drilling across Mineral Hill’s underground orebodies.
1. Refer to slide 17 for the Mineral Resource calculation into AuEq.
KINGSTONRESOURCES.COM.AU | ASX:KSN 9
Proving up the key ore source to underpin an initial 5-year LOM
• SOZ drilling focused on building out the mineral
inventory to support delivery of an initial 5-year LOM
• Most recent drilling completed in Dec 2025
• Recent high-grade intercepts included:
o 7.70m @ 2.46g/t Au, 0.78% Cu, 1.9% Pb, 1.27% Zn,
41g/t Ag from 10m1
o 29.70m @ 2.63% Pb, 4.25% Zn, 28g/t Ag from 30.3m
• Drilling has confirmed the existing geological
interpretation and extended mineralisation into new areas
• Drilling to continue with renewed urgency, executing the
25,000m exploration strategy
Southern Ore Zone (SOZ) – A Growing Future Ore Source
Open
Figure: Extension targets at the Southern Ore Zone, Mineral Hill.
1. See ASX Announcement from 18 February 2026.
KINGSTONRESOURCES.COM.AU | ASX:KSN
Developing Additional Underground Ore Sources
10
Jack’s Hut – High grade copper and gold
• Jack’s Hut – a potential second underground
production area
• Current Resource of 1.6Mt with a separate
decline and infrastructure to SOZ
• Historically mined in the 1990’s for copper and
gold - 705kt of ore mined at 6.76g/t Au and
0.74% Cu for 80.2koz of gold and 11.9kt of
copper sold1
• Material opportunity to grow the Resource
• Targeting extensions adjacent to existing
copper development
• High potential polymetallic mineralisation
along trend
• Down dip extensions below historical
mining
• Jack’s Hut envisaged to be a key feed source
for any future potential mill expansion post
plant expansion studies and optimisation
Figure: Drilling at Jacks Hut Southern Extension
Down-dip extension
target
1. See ASX Announcement from 21 March 2023.
KINGSTONRESOURCES.COM.AU | ASX:KSN
11
Strong balance sheet to execute drilling strategy with additional value to be received
$45.0m in deferred consideration to be received from Misima sale
MISIMA
OK TEDI
“The Misima sale is an outstanding outcome for
the people of Misima, the people of PNG and
KSN Shareholders. Ok Tedi are an ideal development
partner for the Misima Gold Project.”
Kingston sold it’s 100% share in the Misima Gold Project
to Ok Tedi Mining Limited in the June quarter of 2025.
Ok Tedi currently produces copper, gold, silver
concentrate from the Ok Tedi Mine in the Western
Province of PNG.
Further $45.0m in payments to be received:
• $10.0m in deferred cash, payable on 11 July 2026.
• $10.0m in deferred cash, payable on a positive final
investment decision (FID) to development Misima.
• 0.5% gross revenue royalty from Misima where Ok Tedi
has the right to buy-back the royalty for $25.0m
KINGSTONRESOURCES.COM.AU | ASX:KSN
Near-Term Catalysts
• Mineral Resource update for the Southern Ore Zone (SOZ)
• Ongoing drilling and assay result updates
• Potential discovery of additional near-mine deposits
• Mineral Resource and Ore Reserve updates to demonstrate scale capability
Optimise the Mine Plan, Right Size and Configure the Plant
• Evaluate additional sources of ore within the mine area and optimise the mine schedule.
• Commencement of plant expansion studies to right size and configure the mill for the future
• Key permits in place to expand to the facility to 700ktpa
• Potential for reduced future operating costs by increasing from 350ktpa to 700ktpa
Drill High Impact Near Mine Extensions
• 25,000m underground and surface drill program
• Multiple targets to extend known mineralization and make new discoveries
• Substantially lift the Measured and Indicated resources and reserves
• Aiming to deliver a robust, initial 5-year mining inventory with expansion upside
Building a Bigger and Better Mineral Hill
12
Drilling to accelerate resource growth and launch Mineral Hill with a
stronger, more robust mine plan
Figure: Mineral Hill drill core.
KINGSTONRESOURCES.COM.AU | ASX:KSN
Appendix
13
KINGSTONRESOURCES.COM.AU | ASX:KSN
Competent Person Statement
Competent Person’s Statement − Mineral Resource Reported in Accordance with 2012 JORC
Code − Mineral Hill
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral
Resource Estimate is based on and fairly represents, information and supporting documentation
compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a Member of the Australian
Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources
Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the
market announcement provided is an accurate representation of the available data and studies
for the material mining project and consents to the inclusion in this report of the matters based
upon the information in the form and context in which it appears. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
Competent Person’s Statement − Ore Reserve Reported in Accordance with JORC Code –
Mineral Hill
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in
accordance with the JORC Code 2012. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone
Mineral Resource estimates and Ore Reserves have been adjusted by mining depletion using the
production wireframes created by the site survey department at the time of mining. These
wireframes represent the mining activities at these deposits to the best of Kingston’s knowledge
although they are not to be viewed as complete or accurate in their entirety and therefore mining
depletion may be revised when Kingston is able to produce revised determinations on more
complete data and verification thereof. Information pertaining to Mineral Resource Estimates
(MRE) and Ore Reserves (OR) in this presentation has been previously released to the public. The
tables on this page indicate the authors of the historical Resources/Reserves and the dates they
were initially published. Kingston is not reporting these estimates as its own with exception of the
MRE and OR for the TSF which has not been reported previously by any other company. The other
original reports are available through the ASX website.
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr
John Wyche BE (Min Hon) BComm CP, of Australian Mine Design and Development Pty Ltd, who
is a Fellow of the AusIMM and who has sufficient relevant experience in operations and consulting
for open pit metalliferous mines. Mr Wyche consents to the inclusion in this report of the
information pertaining Mineral Hill Pearse open pit Ore Reserves in the form and context in which
it appears.
The Competent Person signing off on the overall underground SOZ Ore Reserves Estimate is Mr
Steven Weckert BE ME (Min) CP, of Australian Mine Design and Development Pty Ltd, who is a
Member of the AusIMM and who has sufficient relevant experience in operations and consulting
for underground metalliferous mines. Mr Weckert consents to the inclusion in this report of the
information pertaining to the Mineral Hill SOZ Ore Reserve in the form and context in which it
appears.
Kingston is not aware of any new information or data that materially affects the information
included in this announcement. All material assumptions and technical parameters underpinning
the Mineral Resource estimates and production targets continue to apply and have not materially
changed.
14
Mineral Resource
Ore Reserve
Deposit JORC Ed. ASX Announcement Competent Person Company
Pearse South 2012 KSN 15/03/2023 Stuart Hayward KSN
Southern Ore Zone 2012 KSN 13/11/2025 Stuart Hayward KSN
Jack’s Hut 2012 KSN 21/03/2023 Stuart Hayward KSN
Parkers Hill and Red Terror 2012 KSN 13/11/2025 Stuart Hayward KSN
Deposit JORC Ed. ASX Announcement Competent Person Company
Pearse South 2012 KSN 30/9/2024 John Wyche AMDAD
SOZ 2012 KSN 30/9/2024 Steven Weckert AMDAD
KINGSTONRESOURCES.COM.AU | ASX:KSN
Mineral Hill – Resources & Reserves
Diversified commodity base with significant growth
potential
Measured Resource Inventory
Deposit Kt
Au
(g/t)
Cu
%
Pb
%
Zn
%
Ag
(g/t)
Au
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
Ag
(Koz)
Southern Ore Zone 327 1.90 1.2% 0.5% 0.3% 10 20 4 2 1 109.3
TOTAL 327 1.90 1.2% 0.5% 0.3% 10 20 4 2 1 109
Indicated Resource Inventory
Pearse South 164 4.10 85 22 450
Southern Ore Zone 1,880 1.15 1.0% 2.1% 1.6% 22 70 18 39 31 1,318
Jack's Hut 608 1.53 1.3% 0.5% 0.4% 7 30 8 3 2 134
Red Terror 83 0.58 2% 0% 0% 4 2 2 0 0 9
Parkers Hill 2,923 0.17 1.0% 1.7% 0.8% 44 16 30 51 24 4,172
TOTAL 5,658 0.76 1.1% 1.7% 1.0% 33 138 58 93 57 6,083
Inferred Resource Inventory
Pearse South 40 2 5 3 6
Southern Ore Zone 2,153 1.35 0.9% 1.2% 1.1% 14 93 20 25 24 969
Jack's Hut 1,032 1.09 1% 1% 1% 28 36 7 11 8 917
Red Terror 131 1.38 1.1% 0.0% 0.0% 2 5.8 1.5 0 0 10
Parkers Hill 643 0.16 1% 1% 1% 37 3 4 9 6 758
TOTAL 3,999 1.10 0.8% 1.1% 0.9% 21 142 33 45 37 2,661
Total Mineral Resources
Deposit Kt
Au
(g/t)
Cu
%
Pb
%
Zn
%
Ag
(g/t)
Au
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
Ag
(Koz)
Pearse South 204 3.77 70 25 456
Southern Ore Zone 4,360 1.31 1.0% 1.5% 1.3% 17 183 42 66 56 2,396
Jack's Hut 1,640 1.25 0.9% 0.8% 0.6% 20 66 15 14 10 1,051
Red Terror 214 1.07 1.5% 0.0% 0.0% 3 7 3 - - 20
Parkers Hill 3,566 0.17 1.0% 1.7% 0.8% 43 19 35 60 30 4,930
TOTAL 9,984 0.93 1.0% 1.4% 1.0% 28 300 95 139 95 8,853
Total Probable Ore Reserves
Deposit Kt
Au
(g/t)
Cu
%
Pb
%
Zn
%
Ag
(g/t)
Au
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
Ag
(Koz)
Southern Ore Zone 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450
TOTAL 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450
• The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code 2012. Pearse South, Parkers Hill, Jack’s Hut and the Southern Ore Zone Mineral Resource estimates and Ore Reserves have been adjusted by mining depletion using the
production wireframes created by the site survey department at the time of mining. These wireframes represent the mining activities at these deposits to the best of Kingston’s knowledge although they are not to be viewed as complete or accurate in their entirety and therefore mining
depletion may be revised when Kingston is able to produce revised determinations on more complete data and verification thereof.
• Mineral Resources are reported inclusive of Ore Reserves.
• See Competent Person details and year of original release in the appendix
• For full information of Mineral Resource and Ore Reserves see KSN announcement titled “2025 Mineral Resource Update” released 13 November 2025, Mineral Hill LOM update 30 September 2024 respectively.
• Rounding to significant figures may cause minor computational discrepancies.
15
KINGSTONRESOURCES.COM.AU | ASX:KSN
Metal Equivalents
This presentation quotes metal equivalent grades defined by Kingston
Resources. Price assumptions used are based on market consensus
forecasts with adjustments to account for reasonable prospects for
eventual economic extraction (RPEEE), as guided by JORC reporting
guidelines. Gold equivalent (AuEq) and copper equivalent (CuEq)
conversion factors are used within the presentation and are calculated by
multiplying the grades for each contributing metal by their respective
metal price and recovery and dividing by the multiplication of the primary
metal’s price and recovery (gold or copper for AuEq and CuEq
respectively).
Metallurgical recoveries are based on historical production (2010-2016) as
well as recent metallurgical test work and are applied to the Resource
and Reserve calculated grades for each commodity. The Company is of
the opinion that all the elements included in the metal equivalent
calculations have a demonstrated potential to be recovered and sold.
Mineral Hill is currently producing metal concentrates and dore (from the
CIL) on site. Upon the commencement of underground polymetallic
production, the Company will have a Cu flotation circuit, Pb flotation
circuit and Zn flotation circuit to produce three different concentrates as
well as precious metal dore.
AuEq g/t = Au g/t + (0.883 * Cu %) + (0.016* Ag g/t) + (0.132 * Pb %) + (0.163 * Zn)
Commodity Unit Price
Gold US$/oz 5,074
Silver US$/oz 76.10
Copper US$/lb 6.16
Lead US$/lb 1.08
Zinc US$/lb 1.51
Deposit Commodity Recovery (%) AuEq Factor CuEq Factor
SOZ Gold 83 1.000 1.132
Silver 88 0.016 0.018
Copper 88 0.883 1.000
Lead 75 0.132 0.149
Zinc 66 0.163 0.184
16
CuEq % = Cu % + (1.132 * Au g/t) + (0.018 * Ag g/t) + (0.149 * Pb %) + (0.184 * Zn)
KINGSTONRESOURCES.COM.AU | ASX:KSN
Metal Resources & Reserves
17
Attractive commodity base with significant growth potential
Total Mineral Resources Metal Recoveries Gold Equiv. Copper Equiv.
Deposit Kt Au (g/t)
Cu
%
Pb
%
Zn
% Ag (g/t)
Au
(Koz)
Cu
(Kt) Pb (Kt)
Zn
(Kt)
Ag
(Koz) Au Cu Pb Zn Ag
AuEq
g/t
AuEq
koz
CuEq
%
CuEq
kt
Pearse South 204 3.77 70 25 456 75 62 4.6 30 5.6 11.3
Southern Ore Zone 4,360 1.31 1.0% 1.5% 1.3% 17 183 42 66 56 2,396 83 88 75 66 88 2.8 398 3.2 140.1
Jack's Hut 1,640 1.25 0.9% 0.8% 0.6% 20 66 15 14 10 1,051 82 95 88 2.4 129 2.5 41.8
Red Terror 214 1.07 1.5% 0.0% 0.0% 3 7 3 - - 20 83 85 68 71 88 2.4 16 2.8 6.0
Parker’s Hill Oxide 1,532 0.03 1.2% 2.6% 0.4% 66 1 10 40 6 3256 75 51 91 25 61 1.7 84 3.0 46.3
Parkers Hill Sulphide 2,034 0.27 1.2% 0.9% 1.2% 26 18 25 19 23 1674 83 85 68 71 88 2.0 132 2.4 48.4
TOTAL 9,984 0.93 1.0% 1.4% 1.0% 28 300 95 139 95 8,853 81.5 82.6 63.3 49.6 83.5 2.5 790 2.9 293.9
Refer to the previous slide for metal equivalent calculations
KINGSTONRESOURCES.COM.AU | ASX:KSN
Share your feedback
Discover