Managing Director's AGM Presentation
Released
Released
Announcement PDF
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTON RESOURCES LIMITED
ASX: KSN
AGM Presentation
Building scale and preparing
for the mining restart
Established mine and processing plant
25,000m Resource Development Program
Growing Resources and Reserves
26 November 2026
View more information on our website:
www.kingstonresources.com.au
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Important notices and disclaimer
02
FORWARD-LOOKING STATEMENTS
Certain statements in this presentation concerning future financial or operating
performance, targets, plans, budgets, timing, Resources, Ore Reserves and studies
are forward-looking statements. They are based on estimates and assumptions
and are subject to technical, business, economic, market and other risks and
uncertainties. Actual results may differ materially. Words including ‘target’, ‘plan’,
‘expect’, ‘aim’, ‘may’ and ‘will’ may identify forward-looking statements. Recipients
should not place undue reliance on them.
DISCLAIMER
No representation or warranty is made as to the fairness, accuracy or
completeness of the information, opinions or conclusions in this presentation. To
the maximum extent permitted by law, Kingston Resources Limited, its directors,
employees and agents accept no liability for loss arising from use of this
presentation. This presentation is for information only, does not constitute an offer
or financial product advice, and has been prepared without regard to any person’s
objectives, financial situation or needs. Past performance is not a guarantee of
future performance.
MINERAL RESOURCES AND ORE RESERVES
Mineral Resources are not Ore Reserves and do not have
demonstrated economic viability. The Mineral Resource and Ore
Reserve information in this presentation is drawn from previously
released ASX announcements. Kingston confirms that it is not aware
of any new information materially affecting those estimates and that
material assumptions continue to apply.
PREVIOUSLY REPORTED INFORMATION
All Exploration Results, Mineral Resource and Ore Reserve information
should be read with the source announcements and Competent
Person statements listed in the appendix.
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Cath Norman
Chair
Andrew Corbett
Managing Director
Stuart Rechner
Non-Executive
Director
Anthony Wehby
Non-Executive
Director
Andrew is a highly experienced
mining engineer with over 30 years
in mine management and financial
markets. He has an in-depth
understanding of mining, equity
markets, business development
and corporate strategy.
Stuart is an experienced company
director and geologist with a
background in project generation
and acquisition in Australia and
overseas. Mr. Rechner holds
degrees in both geology and law.
Anthony is a highly experienced
board member and chairman,
previously Non-Executive Chairman
of Tellus Resources Limited and
Aurelia Metals Limited, and a
Director of Ensurance Ltd.
Cath is a geophysicist and
experienced resources sector
executive with 35 years’ experience.
She has strong capital markets
experience being Managing
Director of FAR Limited for 11 years
and is currently chair of ASX listed
BOA Resources and on the board of
Vintage Energy.
Kingston has a highly experienced team
Significant and diverse leadership with experience across the full mining development cycle through to production
03
Vinod is a CPA and an associate
member of the Governance
Institute of Australia, with over
14 years of professional
experience across agriculture,
biotechnology and mining
industries.
Tony is a highly experienced
production and mine planning
engineer with expertise in
copper-gold operations across
NSW.
Tony is leading the mine design
and scheduling work.
Melanie has over 30 years
experience as GM, U/G Mine
Manager and Processing
Manager.
Mel’s skill set is directed
towards the mining restart at
Mineral Hill and optimising
output.
Vinod Manikandan
CFO / CO-SEC
Tony Mitchell
Snr Mine Planning Engineer
Melanie McCarthy
GM - Mineral Hill
Andrew is a geologist with over
20 years experience in
operations and financial
analysis.
Andrew’s focus is on cash flow
modelling and assessing
regional opportunities around
Mineral Hill.
Andrew White
Commercial Manager
Alexei is an economic geologist
with 16 years’ experience across
mining exploration.
Alexei is leading the exploration
and resource growth work at
Mineral Hill and regional
targeting.
Alexei Nicholls
Exploration Manager
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Four years of cash flow operations built the asset base
Since acquisition by KSN, Mineral Hill has sold over A$200m of gold and delivered A$51m of operating
cash flow. Pearse South reset the operating plan in June 2026; FY27 is focused on Resource and Reserve
growth.
04
JAN 2022
Mineral Hill
acquired
Existing mine and
plant
2022 - MAY 2024 Tailings
Retreatment
Upgrade of the
processing plant and
operating capability
JUN 2024 - MAY 2026 Open Pit
mining
Dore and
concentrate sales
JUNE 2026
Open Pit
mining ceased
Care and
maintenance;
mining paused
FY27
Drilling and
resource
development
25,000m of drilling
Resource and Reserve
updates expected H2
ASSET DEVELOPMENT TO DATE
• Over four years of operating cash flow
• Mineral Resources increased from 5.9Mt to 12.1Mt
• Processing plant refurbishment and reinstatement.
• Tailings dam lifts and approvals
• Re-access to underground development
• New return air-rise and underground development.
FORWARD STRATEGY
• Gold and copper focus
• Build scale – life of mine and setup for future expansions
• Upgrade Inferred to Indicated
• Update Ore Reserve and Production Target estimates
• Restart the mine and plant
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Fully permitted plant and established underground infrastructure
An established operating footprint - not a greenfield development concept
05
Processing plant and surface infrastructure
Eastern decline portal
350ktpa
fully permitted
processing
capacity
2 x declines
existing
underground
declines
MINE + PLANT UG ACCESS AND
INFRASTRUCTURE
FLOTATION / CIL BROWNFIELDS
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
FY27 - targeting Resource growth and Reserve conversion
Since acquisition, the Mineral Resource has grown from 5.9Mt to 12.1Mt while approximately 2Mt was
processed. FY27 is the largest planned annual drilling campaign in Kingston’s ownership.
06
327kt CuEq
OR
884koz AuEq
Current Mineral
Resource1
12.1Mt
Current Mineral
Resource
+105%
MRE tonnage
growth since
acquisition
25,000m
FY27 planned
drilling
THE COMMERCIAL TASK
Establish the Reserve scale and mine plan
required to support a larger production base
and longer-life underground restart decision.
1. Insitu metal of the current Mineral Resource estimate stated two different ways; gold equivalent (AuEq) and copper equivalent (CuEq). Metal Equivalent calculations shown in the appendix
6,014m 5,637m
453m
12,219m 11,292m
25,000m
2022 2023 2024 2025 2026 2027 Planned
Metres drilled per year
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Recent copper transactions highlight the value of infrastructure pathways
Recent activity shows strategic interest in copper Resources with access to existing processing infrastructure.
Existing infrastructure and growing resource base supports a capital-light growth pathway and potential regional processing role
Sources: Company ASX announcements dated 12 February, 21 May, 27 July, 11 August and 23 September 2026. Bumi transactions referenced from media releases. See Metal Equivalent calculations listed later in this presentation.
07
Date Transaction Infrastructure pathway
Feb 2026 Aeris / Peel
South Cobar Resources paired with Tritton processing
infrastructure
May 2026 Kantra / Mutooroo
Mutooroo development studied using the existing Kanmantoo
plant
Jul 2026 Evolution / Carnaby
Greater Duchess ore intended to use available capacity at Ernest
Henry
Aug 2026 Austral / Hammer Kalman identified as potential future feed for the Rocklands plant
Sep 2026 AIC Mines / Mt Cuthbert
Established Resource and infrastructure added to a regional
operating platform
Sep 2026
Bumi / Loyal Metals (Hwy
Reward)
Pre-resource stage, historical production previously trucked to
third party processing plant
Oct 2026 Bumi / Mount Margaret Ore historically trucked to Ernest Henry
MINERAL HILL READ-THROUGH
Existing plant and
infrastructure
Regional ore feed
potential
Resource – 327kt
CuEq
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
25,000m to build scale, confidence and additional ore-sources
The FY27 program combines underground infill and extension drilling with surface drilling across priority
targets.
08
10,025m INFILL
Improve confidence for Reserve
conversion
8,400m UG EXTENSION
Test continuity and extensions from
existing underground access
6,575m SURFACE EXTENSION /
DISCOVERY
Test Jack’s Hut and Iodide deeps,
Parker's Hill East discovery potential
RESOURCE GROWTH
INCREASE MEASURED
+ INDICATED
SUPPORT RESERVE
CONVERSION
Largest annual Mineral Hill drilling
campaign since Triako’s 1999
Resource drill-out.
Parker's Hill East
Jack's Hut Deeps
SOZ Upper A Lode
SOZ Footwall Lodes
SOZ Nth Extensions
Iodide Extensions
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN 09
Southern Ore Zone drilling supports mine planning
Confirmation of the high-grade Upper A Lode mineralisation
Southern Ore Zone cross-section showing KSNDDH088
UPPER A LODE
18.50m at 7.6% CuEq
KSNDDH088 · from 150.5m · reported 18 November 2026
Estimated true width of 14m
22.10m at 7.6% CuEq
KSNDDH085 · from 209.0m · reported 9 July 2026
Both results will feed into the Southern
Ore Zone Mineral Resource update.
INFILL DRILLING
Results support the geological model in
areas being assessed for underground
mining.
KSNDDH088: 1.27% Cu, 3.68g/t Au, 5.39% Pb, 3.41% Zn, 43g/t Ag.
KSNDDH085: 1.47% Cu, 1.62g/t Au, 8.98% Pb, 3.13% Zn, 132g/t Ag.
Sources: Kingston ASX releases, 9 July and 18 November 2026 (Figure 3). Lengths are downhole. See original releases for CuEq assumptions.
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN 10
Jack’s Hut could provide additional underground ore
Jack’s Hut has its own decline and an existing Mineral Resource
Jack’s Hut underground infill drilling
INFILL DRILLING
9.30m at 3.2% CuEq
KSNDDH093 · from 180.1m · reported 8 September 2026
Infill supports the geological model
around areas being assessed for mining
and informs the Mineral Resource update.
FY27 SURFACE DRILLING
The program targets extensions at depth.
KSNDDH093: 0.97% Cu, 0.71g/t Au, 3.08% Pb, 3.62% Zn, 15g/t Ag.
Source: Kingston ASX release, Jack’s Hut Resource Drilling Results, 8 September 2026. Length is downhole. See original release for CuEq assumptions.
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Northern SOZ extension drilling
October drilling results and November follow-up
Red traces show holes awaiting assays at the time of the October release.
OCTOBER DRILLING
Drilling extended known lodes to the north.
3.00m at 11.9% CuEq
KSNDDH105 · from 119.0m
NOVEMBER DRILLING
Follow-up holes intersected the host
structure farther north, with potential
extensions at depth remaining untested.
KSNDDH078: 4m @ 3.13% Cu, 0.34g/t Au, 10g/t Ag from 53m (true width 3.5m)
KSNDDH105: 3m @ 4.73% Cu, 6.08g/t Au, 16g/t Ag from 119m (true width 1.95m)
Sources: Kingston ASX releases, 22 October and 18 November 2026. Length is downhole. See original releases for CuEq assumptions.
4.00m at 3.7% CuEq
KSNDDH078 · from 53m
11
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
FY27 gives investors clear milestones to monitor
12
FY27 WORK PROGRAM Q1
JUL–SEP
Q2
OCT–DEC
Q3
JAN–MAR
Q4
APR–JUN
UNDERGROUND
DRILLING
SURFACE PROGRAM
DRILLING + ASSAYS
DELIVERY
MILESTONES
WHAT INVESTORS SHOULD WATCH
01 Drilling results and
evidence of Resource
growth and continuity
02 Ore Reserve scale and
mine-plan development
03 Detailed underground restart
plan
Under way: high-grade Upper A Lode
results (Nov)
Infill results support the SOZ MRE update
(Mar Q)
Targeting higher production and longer
mine life (Jun Q)
The MRE and Ore Reserve updates will inform the potential for a larger scale mine and higher throughput.
NOW
MRE UPDATE ORE RESERVE
✓ 25,000m program under way
✓ Upper A Lode: 18.5m @ 7.6% CuEq (Nov)
✓ Jack's Hut infill complete
✓ Surface rig on site (Nov)
WHY THESE MILESTONES MATTER
4,370m drilled to 30 Sep Infill and extension drilling across FY27 (25,000m)
Exploration and extension
Nov–Feb 2027
High-grade results reported
Drilling and geological
interpretation
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Potential restart pathways
Mineral Hill is an advanced stage restart project with low restart hurdles
POTENTIAL FUTURE FUNDING SOURCES
Remaining Misima consideration
A$10m on positive FID plus a 0.5% gross
revenue royalty (after 500k oz), subject
to an A$25m buy-back right
Underground concentrate
Potential source of prepayment or
working-capital support, subject to
commercial terms
FUNDING
FRAMEWORK
Future restart funding will be assessed against the Reserve, mine plan and capital
requirements.
Source: See ASX announcement on 20 May 2026 for full Misima deferred consideration details. Potential future funding sources remain subject to the stated conditions and commercial terms.
13
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
A long operating history and a defined path to the next decision
Three messages for investors to retain.
14
01 SUBSTANTIAL EXISTING VALUE
Existing infrastructure and copper-gold dominant
resource base
02 DEFINED PATHWAY TO A RESTART DECISION
25,000m of drilling to infill and extend the Resource and
maximise the Ore Reserve scale.
03 MEASURABLE OUTPUTS
Drilling results, Mineral Resource / Ore Reserve estimate
updates and a life of mine plan.
FY27 – drilling to increase resource scale for a larger
mine plan and return to underground mining
KINGSTONRESOURCES.COM.AU | ASX: KSN
Appendix
Corporate context, Resource tables and technical diagrams
15
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
FY27 drilling spans the established underground system and near-mine
targets
The system view links planned metres to the three jobs of infill, extension and surface testing.
16
10,025m
underground infill
8,400m
underground extension
6,575m
planned surface drilling
8
priority targets
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Southern Ore Zone - the current underground Reserve base
The FY27 program combines infill drilling for resource definition and extension drilling along trend and down-dip.
17
6.5Mt
SOZ Mineral Resource
3.0Mt
Measured + Indicated
0.7Mt
Probable Ore Reserve
Infill and extension drilling are
intended to improve confidence
and test continuity along the
known system.
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Jack’s Hut and near-mine targets add potential ore sources
Surface drilling is planned to test extensions and targets across the broader Mineral Hill system.
18
1.6Mt
Jack’s Hut Mineral Resource
4 extension holes
planned down-dip
Growth Target
potential second ore source*
* In addition to the Southern Ore Zone
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Current Mineral Resource and Ore Reserve summary
19
• Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
• Probable Ore Reserves are derived from Indicated Mineral Resources.
• The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
• The Ore Reserves form part of the Mineral Resources.
Mineral Resources
Ore Reserves1
Au Cu Pb Zn Ag
(g/t) % % % (g/t)
Measured 629 1.81 1.14 0.65 0.62 12
Indicated 2,418 1.07 0.81 1.69 1.55 19
Inferred 3,490 0.96 0.78 0.83 0.86 11
Sub-Total 6,538 1.08 0.83 1.13 1.09 14
Indicated 608 1.53 1.28 0.50 0.38 7
Inferred 1,032 1.09 0.70 1.05 0.76 28
Sub-Total 1,640 1.25 0.91 0.84 0.62 20
Indicated 83 0.58 2.02 - - 4
Inferred 131 1.38 1.14 - - 2
Sub-Total 214 1.07 1.48 - - 3
Indicated 2,923 0.17 1.04 1.73 0.81 44
Inferred 643 0.16 0.69 1.39 0.93 37
Sub-Total 3,566 0.17 0.98 1.67 0.83 43
Indicated 77 3.86 - - - 93
Inferred 36 2.45 - - - 5
Sub-Total 113 3.41 - - - 65
Measured 629 1.81 1.14 0.65 0.62 12
Indicated 6,109 0.71 0.99 1.57 1.05 30
Inferred 5,332 0.91 0.76 0.92 0.83 17
Grand Total 12,071 0.85 0.90 1.23 0.93 23
Mineral Deposit
Resource
Category
Tonnes
(kt)
Grade
Southern Ore Zone
Jack's Hut
Red Terror
Parker's Hill
Pearse South
Total Mineral
Resources
Tonnes Au Cu Pb Zn Ag
(kt) (g/t) % % % (g/t)
Southern Ore Zone Probable 700 1.40 0.80 1.90 1.60 20
TOTAL 700 1.40 0.80 1.90 1.60 20
Reserve
Category
Mineral Deposit
Mineral Resources (AuEq and CuEq)
Au Ag Cu Pb Zn
g/t g/t % % % g/t koz % kt
Southern Ore Zone 6,538 1.08 14 0.8 1.1 1.1 2.4 496 2.7 175
Jack's Hut 1,640 1.25 20 0.9 0.8 0.6 2.7 140 2.8 46
Red Terror 214 1.07 3 1.5 - - 2.4 16 2.8 6
Parker's Hill Oxide Resources 1,532 0.03 66 0.7 2.6 0.4 1.7 84 3.0 46
Parker's Hill Sulphide Resources 2,034 0.27 26 1.2 0.9 1.2 2.0 132 2.4 48
Pearse South 113 3.41 65 - - - 4.2 15 5.1 6
Total Mineral Resource 12,071 0.85 23 0.9 1.2 0.9 2.3 884 2.7 327
Mineral Deposit kt
AuEq CuEq
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
AuEq g/t = Au g/t + (0.883 * Cu %) + (0.016* Ag g/t) + (0.132 * Pb %) + (0.163 * Zn %)
Commodity Unit Price
Gold US$/oz 5,074
Silver US$/oz 76.10
Copper US$/lb 6.16
Lead US$/lb 1.08
Zinc US$/lb 1.51
Deposit Commodity Recovery (%) AuEq Factor CuEq Factor
SOZ Gold 83 1.000 1.132
Silver 88 0.016 0.018
Copper 88 0.883 1.000
Lead 75 0.132 0.149
Zinc 66 0.163 0.184
CuEq % = Cu % + (1.132 * Au g/t) + (0.018 * Ag g/t) + (0.149 * Pb %) + (0.184 * Zn %)
This presentation quotes metal equivalent grades defined by Kingston
Resources. Price assumptions used are based on market consensus
forecasts with adjustments to account for reasonable prospects for
eventual economic extraction (RPEEE), as guided by JORC reporting
guidelines. Gold equivalent (AuEq) and copper equivalent (CuEq)
conversion factors are used within the presentation and are calculated
by multiplying the grades for each contributing metal by their
respective metal price and recovery and dividing by the multiplication of
the primary metal’s price and recovery (gold or copper for AuEq and
CuEq respectively).
Metallurgical recoveries are based on historical production (2010-2016) as
well as recent metallurgical test work and are applied to the Resource
and Reserve calculated grades for each commodity. The Company is of
the opinion that all the elements included in the metal equivalent
calculations have a demonstrated potential to be recovered and sold.
Mineral Hill has a fully approved mine and processing plant, capable of
producing metal concentrates and dorѐ (from the flotation and CIL
circuits). The Company is targeting a recommencement of mining and
processing to produce copper, lead and zinc concentrates as well as
precious metal dorѐ.
Metal equivalents
20
KINGSTONRESOURCES.COM.AU | ASX:KSN
KINGSTONRESOURCES.COM.AU | ASX:KSN
Competent Persons statement and source references
21
EXPLORATION RESULTS AND MINERAL RESOURCES
The information in this report that relates to Exploration Results and Mineral
Resources is based on information compiled by Mr. Stuart Hayward BAppSc
(Geology) MAIG, of 360 Geoscience Pty Ltd, a Competent Person who is a
member of the Australian Institute of Geoscientists. Mr. Hayward has sufficient
experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr.
Hayward confirms that the information in the market announcement provided is
an accurate representation of the available data and studies for the material
mining project and consents to the inclusion in this report of the matters based
upon the information in the form and context in which it appears.
SOUTHERN ORE ZONE ORE RESERVE
The Competent Person signing off on the overall underground SOZ Ore Reserves
Estimate is Mr. Steven Weckert BE ME (Min) CP, of Australian Mine Design and
Development Pty Ltd, who is a Member of the AusIMM and who has sufficient
relevant experience in operations and consulting for underground metalliferous
mines. Mr. Weckert consents to the inclusion in this report of the information
pertaining to the Mineral Hill SOZ Ore Reserve in the form and context in which
it appears.
Kingston is not aware of any new information or data that materially affects the
information included in this announcement. All material assumptions and
technical parameters underpinning the Mineral Resource estimates and
production targets continue to apply and have not materially changed.
PRINCIPAL SOURCE ANNOUNCEMENTS
Refer to the original ASX announcements for full commodity
grades, cut-offs, assumptions, JORC tables and cautionary
language.
Deposit
JORC
Ed.
ASX
Announcement
Competent
Person Company
Pearse South 2012 KSN 15/03/2023 Stuart Hayward KSN
Southern Ore Zone 2012 KSN 13/11/2025 Stuart Hayward KSN
Jack’s Hut 2012 KSN 21/03/2023 Stuart Hayward KSN
Parker's Hill and Red Terror 2012 KSN 13/11/2025 Stuart Hayward KSN
Deposit
JORC
Ed.
ASX
Announcement
Competent
Person Company
SOZ 2012 KSN 30/9/2024 Steven Weckert AMDAD
Mineral Resource
Ore Reserve