High-Grade Gold and Copper Drill Results
Released
Released
Announcement PDF
KINGSTONRESOURCES.COM.AU
ASX/Media Announcement
Follow us on X (Twitter)
@KSNResources
Follow us on LinkedIn
#KingstonResources
202/201 Miller Street,
North Sydney, NSW 2060
+61 2 8021 7492
info@kingstonresources.com.au
High-Grade Results at Southern Ore Zone –
Supportive of Resource and Mine Planning Work
Wide, high-grade gold-copper mineralisation at the Upper A Lode
(18.50m @ 7.63% CuEq) reinforcing geological confidence ahead of
planned Resource and Reserve updates
Key Highlights:
• Outstanding high-grade results at Upper A Lode including two broad massive
sulphide intervals in KSNDDH088:
o 18.50m @ 7.63% CuEq from 150.5m – estimated true width (ETW) 14m
o 17.00m @ 2.86% CuEq from 124.0m – ETW 15m, incl. 14.20m @ 3.34% CuEq
• High-grade Upper A Lode mineralisation intersected 70m north of the previously
reported in KSNDDH085, reinforcing the potential for a broad, high-grade
mineralised zone and establishing a priority target for further drilling.
• Infill drilling strengthens confidence in the Southern Ore Zone geological
model supporting the planned Mineral Resource and mine planning updates.
• Further strong gold grades in KSNDDH119:
o 10.20m @ 5.15g/t Au (6.11% CuEq) from 152.0m, incl. 8.20m @ 6.31g/t Au
(7.45% CuEq)
• Additional mineralisation intersected in the northern D Lode, with potential
extensions at depth remaining untested.
• Surface drill rig has arrived on site with the first target being the Upper A Lode.
• Clear pathway towards updated Mineral Resources and Ore Reserves, with an
SOZ Mineral Resource update targeted for the March quarter of 2027 and an Ore
Reserve update targeted by June 2027, supporting the assessment of a potential
underground restart.
See the KSN website for a 3D fly-through of the results (www.kingstonresources.com.au).
Kingston Resources Limited (ASX: KSN) (‘Kingston’ or ‘The Company’) reports further
assay results from underground drilling at the Southern Ore Zone (SOZ), Mineral Hill. The
results include wide, high-grade Copper-Gold mineralisation in the Upper A Lode and
support the geological interpretation of the eastern A, B and C Lodes.
18 November 2026
KINGSTONRESOURCES.COM.AU | ASX: KSN 2
The drilling is part of Kingston’s FY27 program targeting Mineral Resource growth and
increased geological confidence to support assessment of a potential underground
restart at Mineral Hill. The high-grade intersections, encouraging mineralised widths and
infill results are broadly consistent with the geological model and provide a strong
foundation for the Mineral Resource update targeted for the March quarter of 2027, which
will inform subsequent mine planning and Ore Reserve assessment.
Managing Director and CEO, Andrew Corbett commented:
“These are outstanding results for Kingston and provide further encouragement for our
plans to return Mineral Hill to underground production.
“Eighteen and a half metres at 7.63% copper equivalent, with an estimated true width of
14 metres, is an exceptional intersection. Together with KSNDDH085, it highlights the
potential of the Upper A Lode and makes it a priority target for our surface drilling
program.
“Just as encouraging, the eastern infill holes are intersecting mineralisation as predicted
by our geological model. These results strengthen confidence in the areas we are
assessing for potential future underground mining.
“Our objective is to establish the Resource confidence, Reserve scale and mine plan
needed to assess a potential underground restart. The drilling and technical work
underway are building towards a clearer picture of Mineral Hill’s potential mine life,
production scale and capital requirements.
“These results will feed into the SOZ Mineral Resource update targeted for the March
quarter of 2027, followed by the Ore Reserve update targeted by June 2027.”
KINGSTONRESOURCES.COM.AU | ASX: KSN 3
These results continue the FY27 drilling program announced on 27 August 2026, the
largest annual campaign at Mineral Hill since the original resource drill-out in 1999. The
program is directed at two outcomes: expanding the Mineral Resource and increasing
drill density in the areas expected to be the first production areas on a return to
underground mining. The drilling reported here includes both infill and extension holes.
The holes oriented to the east, into the A, B and C Lodes, are infill holes drilled to increase
drill density in the parts of the deposit most relevant to potential future underground
mining. The holes to the north are extension holes targeting the D, E, G and H Lodes.
Figure 1: Oblique view of the recent holes being announced.
Eastern A, B and C Lodes – infill drilling supports the geological model
The eastern infill holes intersected the A, B and C Lodes in the positions, widths and grade
ranges predicted by the geological model. The results support the geological
interpretation in areas relevant to potential future underground mining.
The purpose of this infill drilling is to increase confidence in mineralisation already
included in the Mineral Resource, rather than necessarily add tonnes. The results will be
incorporated into the SOZ Mineral Resource update targeted for the March quarter of
2027, which will inform subsequent mine planning and the SOZ Ore Reserve update
targeted by June 2027.
Southern Ore Zone
Jack’s Hut
KINGSTONRESOURCES.COM.AU | ASX: KSN 4
Figure 2: Plan view – extension drilling targeting D, G and H Lodes and infill holes into the eastern A, B and
C Lodes. The previously reported KSNDDH085 shown in black in the south-east.
KINGSTONRESOURCES.COM.AU | ASX: KSN 5
KSNDDH088 – wide, high-grade polymetallic mineralisation in the Upper
A Lode
KSNDDH088 is the standout hole of the program. This hole intersected the same ultra
high-grade polymetallic mineralisation in the Upper A Lode, 70m to the north of the
previously reported KSNDDH085 (see ASX announcement 9 July 2026):
• 18.50m @ 1.27% Cu, 3.68g/t Au, 5.39% Pb, 3.41% Zn, 43g/t Ag (7.63% CuEq) from
150.5m – estimated true width 14m
• 17.00m @ 1.32% Cu, 0.64g/t Au, 1.42% Pb, 1.44% Zn, 19g/t Ag (2.86% CuEq) from
124.0m – estimated true width 15m, including 14.20m @ 3.34% CuEq
These are not narrow structures. At estimated true widths of 14m and 15m, KSNDDH088
has intersected two broad zones of massive sulphide mineralisation in a single hole –
chalcopyrite, galena and sphalerite with associated quartz-carbonate veining. Refer to
Figure 3 and Figure 4 for cross sections and Figure 5 for core photos of KSNDDH088.
Figure 3: Cross-section at 430mN at the Southern Ore Zone.
The significance is in the pairing. KSNDDH085 returned 77.10m @ 0.62g/t Au, 0.66% Cu,
4.07% Pb, 2.49% Zn, 53g/t Ag (3.38% CuEq) from 154.0m at an estimated true width of
approximately 20m, including 22.10m @ 1.62g/t Au, 1.47% Cu, 8.98% Pb, 3.13% Zn, 132g/t
Ag (7.61% CuEq). KSNDDH088 has now returned comparable true widths and
comparable grades in the same lode. The latest results provide further support for the
interpretation of a broad high-grade mineralised zone in the Upper A Lode.
KINGSTONRESOURCES.COM.AU | ASX: KSN 6
The A Lode underpins a substantial portion of the 6.54Mt Southern Ore Zone Mineral
Resource (see ASX announcement 24 June 2026). Taken together, KSNDDH085 and
KSNDDH088 describe a wide and well-mineralised zone within it, and the results of both
holes will be incorporated into the updated SOZ Mineral Resource estimate targeted for
the March quarter of 2027.
The Upper A Lode is now a priority target for the surface diamond drill rig, which has
just arrived on site and will be testing this zone from surface. Surface drilling gives
Kingston access to parts of the lode that cannot be reached from existing underground
development and allows the zone to be tested along strike and to the east beyond the
current drilling.
Figure 4: Cross section looking towards 021° at the southern group of drill holes.
KSNDDH119, designed as an infill hole, intercepted the highest gold grades from this set
of results, returning 10.20m @ 5.15g/t Au (6.11% CuEq) from 152.0m. This result is located
directly in line with the existing Mineral Resource wireframe and down-dip from a
previously drilled high-grade gold intersection, providing strong confirmation of the
existing geology models.
KSNDDH121 has also intersected a very wide part of the A Lode mineralisation - 22.10m @
0.56% Cu, 0.64g/t Au, 13g/t Ag (1.78% CuEq) from 119.2m, ETW 20m. This result points to
a potential widening of the mineralisation in this zone.
KINGSTONRESOURCES.COM.AU | ASX: KSN 7
Table 1: Selected highlights of the southern drill holes.
Hole ID
Cutof
f (%)
From
(m)
To (m)
Lengt
h (m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
KSNDDH084 0.5 45.00 50.00 5.00 0.50 28 2.59 0.73 0.67 3.90
KSNDDH084 1.0 45.00 49.00 4.00 0.58 35 3.18 0.87 0.81 4.75
KSNDDH084 0.5 102.20 103.60 1.40 0.14 22 3.29 0.52 0.69 4.05
KSNDDH084 0.5 152.00 162.00 10.00 0.79 25 0.65 1.28 0.44 2.27
KSNDDH084 1.0 157.00 162.00 5.00 1.28 44 1.02 2.04 0.50 3.67
KSNDDH084 0.5 179.00 198.05 19.05 0.44 22 0.10 0.68 0.65 1.21
KSNDDH084 1.0 188.00 191.00 3.00 2.04 58 0.12 1.04 1.84 3.98
KSNDDH087 0.5 43.70 45.80 2.10 1.03 25 3.50 0.26 0.36 5.23
KSNDDH087 0.5 48.00 55.00 7.00 0.34 9 0.61 0.79 1.07 1.47
KSNDDH087 1.0 48.00 52.00 4.00 0.54 13 0.82 1.24 1.73 2.16
KSNDDH087 0.5 107.00 109.00 2.00 1.89 4 0.38 0.24 0.20 2.66
KSNDDH087 0.5 120.00 132.20 12.20 0.04 23 0.28 2.17 3.06 1.62
KSNDDH087 1.0 126.00 132.20 6.20 0.05 31 0.41 2.60 3.62 2.08
KSNDDH087 0.5 176.00 182.00 6.00 1.80 66 0.02 0.41 0.42 3.39
KSNDDH087 1.0 177.00 179.00 2.00 5.12 174 0.04 0.64 0.42 9.14
KSNDDH088 0.5 101.00 121.00 20.00 0.32 6 0.49 0.21 0.21 1.04
KSNDDH088 1.0 111.00 113.00 2.00 1.35 17 1.23 0.44 0.14 3.15
KSNDDH088 0.5 124.00 141.00 17.00 0.64 19 1.32 1.42 1.44 2.86
KSNDDH088 1.0 125.40 139.60 14.20 0.74 22 1.54 1.66 1.71 3.34
KSNDDH088 0.5 150.50 169.00 18.50 3.68 43 1.27 5.39 3.41 7.63
KSNDDH119 0.5 152.00 162.20 10.20 5.15 4 0.13 0.20 0.24 6.11
KSNDDH119 1.0 154.00 162.20 8.20 6.31 4 0.14 0.22 0.24 7.45
KSNDDH121 0.5 119.20 141.30 22.10 0.64 13 0.56 0.79 0.79 1.78
KSNDDH121 1.0 126.80 130.00 3.20 0.23 33 0.70 2.24 1.35 2.14
KSNDDH121 1.0 136.00 139.60 3.60 3.19 15 1.74 0.79 0.93 5.90
KSNDDH121 0.5 155.00 171.00 16.00 0.42 7 0.24 0.90 0.65 1.08
KSNDDH121 1.0 169.10 171.00 1.90 0.21 29 1.00 5.51 2.24 3.00
The full list of significant intercepts is included in the section titled Drill Hole Collars and Significant Assays.
High Grade
KINGSTONRESOURCES.COM.AU | ASX: KSN 8
Figure 5: Massive sulphide mineralisation in KSNDDH088. Core photos show high-grade polymetallic
mineralisation with chalcopyrite, galena, sphalerite and associated quartz/carbonate veining.
KINGSTONRESOURCES.COM.AU | ASX: KSN 9
Northern SOZ – D, E, G and H Lodes
The northern holes were designed to extend the high-grade gold-copper dominant
mineralisation in the D, E, G and H Lodes. Previously announced holes in this area
successfully intersected extensions to the existing Mineral Resource (see ASX
announcement from 22 October 2026). The holes in this announcement have again
intersected the main D Lode mineralisation, including 3.00m @ 4.08% Cu, 0.66g/t Au,
20g/t Ag (5.20% CuEq) in KSNDDH111 and 8.20m @ 1.77% Cu (2.01% CuEq) in KSNDDH112.
KSNDDH114, KSNDDH115 and KSNDDH116, drilled north of KSNDDH113_R1, intersected the
host structure but returned declining grades. At the elevation tested, the structure
continues north, but the grade tenor within it does not.
Kingston interprets potential for mineralisation to continue below these holes, consistent
with the northerly plunge observed elsewhere in the deposit. This potential remains
untested. Follow-up drilling will be designed to assess whether higher-grade
mineralisation continues at depth.
Table 2: Selected highlights of the northern drill holes.
Hole ID
Cutof
f (%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
KSNDDH111 0.5 59.00 62.00 3.00 0.66 20 4.08 0.09 0.04 5.20
KSNDDH112 0.5 88.30 96.50 8.20 0.10 7 1.77 0.03 0.03 2.01
KSNDDH112 0.5 283.00 284.10 1.10 5.15 3 0.88 0.02 0.02 6.76
The full list of significant intercepts is included in the section titled Drill Hole Collars and Significant Assays.
Next steps
All results reported here will be incorporated into the updated Southern Ore Zone Mineral
Resource estimate targeted for the March quarter of 2027. That estimate will inform
updated mine planning and an updated SOZ Ore Reserve estimate targeted by June
2027.
The surface drill rig has now arrived on site and is currently collaring the first hole to test
for extensions to the high-grade Upper A Lode mineralisation. The surface program
comprises 6,575m of diamond and RC drilling. The key targets for the surface program
include:
• Southern Ore Zone’s Upper A Lode,
• Jack’s Hut Deeps,
• Parker’s Hill East,
• Iodide Extensions.
• Southern Ore Zone Footwall Lodes
The underground rig remains in operation. Assay results are pending for the southern
footwall lodes and will be reported as they are received.
High Grade
KINGSTONRESOURCES.COM.AU | ASX: KSN 10
Figure 6: Surface drill rig positioned over the first diamond drill hole, targeting Upper A Lode extensions.
This release has been authorised by the Kingston Resources Limited Board.
For all enquiries, please contact Managing Director, Andrew Corbett, on +61 2 8021 7492.
KINGSTONRESOURCES.COM.AU | ASX: KSN 11
About Kingston Resources
Kingston Resources is an Australian gold and copper company focused on Mineral
Resource growth and advancing the next phase of development at its 100%-owned
Mineral Hill asset in New South Wales.
Mineral Hill is an established polymetallic mine and processing complex in the Southern
Cobar Basin and is currently on care and maintenance. Gold and copper are the principal
value drivers. The site includes five orebodies within the existing mining lease, a fully
permitted 350ktpa processing plant and two existing underground declines.
Three reasons to look more closely at Kingston:
01
ESTABLISHED ASSET
AND INFRASTRUCTURE
Kingston owns 100% of Mineral
Hill, including the existing mine, a
fully permitted 350ktpa
processing plant and two
underground declines. This
established footprint differentiates
Mineral Hill from a greenfield
development.
02
EXISTING MINERAL
RESOURCE WITH
GROWTH POTENTIAL
Mineral Hill has a 12.1Mt Mineral
Resource containing 884koz
AuEq across five orebodies.
Since acquiring Mineral Hill,
Kingston has increased the
Mineral Resource from 5.9Mt to
12.1Mt while processing
approximately 2Mt of material.
03
FY27 RESOURCE
DEVELOPMENT
PROGRAM
Kingston plans 25,000m of drilling
in FY27, representing the largest
annual drilling campaign at
Mineral Hill since 1999. The
program targets Mineral
Resource growth, increased
geological confidence, additional
potential ore sources and support
for subsequent Ore Reserve
conversion.
350ktpa
FULLY PERMITTED PROCESSING
PLANT
884koz AuEq
CONTAINED IN THE MINERAL
RESOURCE
25,000m
PLANNED FY27 DRILLING
Underground Portals
Processing Plant
Tailings Storage
Flotation Circuit
ROM Stockpile
Core Yard
Carbon in Leach Circuit (CIL)
KINGSTONRESOURCES.COM.AU | ASX: KSN 12
Mineral Resources and Ore Reserves
Mineral Hill Mineral Resource and Ore Reserve - JORC Reporting (2012 Ed.).
Mineral Deposit
Resource
Category
Tonnes
(kt)
Grade Metal
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 2,418 1.07 0.81 1.69 1.55 19 83 20 41 37 1,477.1
Inferred 3,490 0.96 0.78 0.83 0.86 11 108 27 29 30 1,178.2
Sub-Total 6,538 1.08 0.83 1.13 1.09 14 227 54 74 71 2,889.0
Jack's Hut
Indicated 608 1.53 1.28 0.50 0.38 7 30 8 3 2 133.7
Inferred 1,032 1.09 0.70 1.05 0.76 28 36 7 11 8 917.1
Sub-Total 1,640 1.25 0.91 0.84 0.62 20 66 15 14 10 1,050.8
Red Terror
Indicated 83 0.58 2.02 - - 4 2 2 - - 9.5
Inferred 131 1.38 1.14 - - 2 6 1 - - 10.2
Sub-Total 214 1.07 1.48 - - 3 7 3 - - 19.7
Parker's Hill
Indicated 2,923 0.17 1.04 1.73 0.81 44 16 30 51 24 4,172.0
Inferred 643 0.16 0.69 1.39 0.93 37 3 4 9 6 758.0
Sub-Total 3,566 0.17 0.98 1.67 0.83 43 19 35 60 30 4,930.0
Pearse South
Indicated 77 3.86 - - - 93 10 - - - 231.0
Inferred 36 2.45 - - - 5 3 - - - 5.4
Sub-Total 113 3.41 - - - 65 12 - - - 236.4
Total Mineral
Resources
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 6,109 0.71 0.99 1.57 1.05 30 140 60 95 64 6,023.2
Inferred 5,332 0.91 0.76 0.92 0.83 17 156 40 49 44 2,869.0
Grand
Total
12,071 0.85 0.90 1.23 0.93 23 332 107 147 111 9,126.0
Mineral Deposit
Reserve
Category
Tonnes
(kt)
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone Probable 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
TOTAL 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
1. Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
2. Probable Ore Reserves are derived from Indicated Mineral Resources.
3. The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
4. The Ore Reserves form part of the Mineral Resources.
KINGSTONRESOURCES.COM.AU | ASX: KSN 13
Metal Equivalents
This announcement quotes metal equivalent grades as defined by Kingston Resources. Price assumptions
used are based on market consensus forecasts, with adjustments to account for reasonable prospects for
eventual economic extraction (RPEEE), as guided by JORC reporting guidelines. Copper equivalent (CuEq)
conversion factors are used within the announcement and are calculated by multiplying the grades for each
contributing metal by their respective metal price and recovery and dividing by the product of the copper
price and copper recovery.
Metallurgical recoveries are based on historical production (2010-2016) as well as recent metallurgical test
work and are applied to the Resource and Reserve calculated grades for each commodity. The Company is of
the opinion that all the elements included in the metal equivalent calculations have a demonstrated potential
to be recovered and sold. Mineral Hill has a fully approved mine and processing plant, capable of producing
metal concentrates and doré (from the flotation and CIL circuits). The Company is targeting a
recommencement of mining and processing to produce copper, lead and zinc concentrates as well as
precious metal doré.
Commodity Unit *Price Deposit Commodity Recovery (%) CuEq Factor
Gold US$/oz 5,074 SOZ/JH Gold 83 1.132
Silver US$/oz 76.1 Silver 88 0.018
Copper US$/lb 6.16 Copper 88 1.000
Lead US$/lb 1.08 Lead 75 0.149
Zinc US$/lb 1.51 Zinc 66 0.184
* Metal price assumptions are based on long-term market consensus averages and marked up 15% to account for the JORC
guidelines of allowing for reasonable prospects of eventual economic extraction.
Competent Person’s Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is based on
information compiled by Mr. Stuart Hayward BAppSc (Geology) MAIG, of 360 Geoscience Pty Ltd, a Competent
Person who is a member of the Australian Institute of Geoscientists. Mr. Hayward has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and
studies for the material mining project and consents to the inclusion in this report of the matters based upon
the information in the form and context in which it appears.
The Competent Person signing off on the overall underground SOZ Ore Reserves Estimate is Mr. Steven
Weckert BE ME (Min) CP, of Australian Mine Design and Development Pty Ltd, who is a Member of the
AusIMM and who has sufficient relevant experience in operations and consulting for underground
metalliferous mines. Mr. Weckert consents to the inclusion in this report of the information pertaining to the
Mineral Hill SOZ Ore Reserve in the form and context in which it appears. The Mineral Hill Mineral Resource
estimates included in this announcement were released in ASX announcements on 15 March 2023 (Pearse
South), 21 March 2023 (Jack’s Hut), 13 November 2025 (Red Terror and Parker’s Hill) and 24 June 2026 (Southern
Ore Zone). The Ore Reserve estimate for the Southern Ore Zone was released in ASX announcements on 30
September 2024. Further information is included within the original announcements.
Kingston is not aware of any new information or data that materially affects the information included in this
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimates and production targets continue to apply and have not materially changed. 
CuEq % = Cu % + (1.132 * Au g/t) + (0.018* Ag g/t) + (0.149 * Pb %) + (0.184 * Zn %)
KINGSTONRESOURCES.COM.AU | ASX: KSN 14
Drill Hole Collars and Significant Assays
Table 3: Drillhole collar information.
Hole ID
Local Local Local MGA20 z55
EAST
MGA20 z55
NORTH
AHD Dip
Azimuth
(Local)
Total Depth
(m)
Assay
Status
EAST NORTH RL
KSNDDH084 1174.9 421.6 1097.9 499115.2 6395283.7 97.9 8.5 105.1 200.1 Final
KSNDDH087 1174.9 421.7 1097.8 499115.1 6395283.8 97.8 4.6 108.3 240.9 Final
KSNDDH088 1174.5 422.8 1098.8 499114.0 6395284.3 98.8 18.9 88.1 221.2 Final
KSNDDH111 1240.0 687.3 1092.7 498973.3 6395517.4 92.8 -20.2 281.0 350.5 Final
KSNDDH112 1239.8 687.3 1092.2 498973.8 6395518.6 92.2 -34.3 280.8 407.4 Final
KSNDDH113_R1 1240.3 688.7 1092.6 498973.0 6395520.0 92.6 -20.6 294.3 365.4 Final
KSNDDH114 1240.4 689.2 1092.7 498972.2 6395519.0 92.7 -15.0 304.4 385 Final
KSNDDH115 1240.4 689.2 1092.4 498972.2 6395519.0 92.4 -24.3 305.3 410.6 Final
KSNDDH116 1240.4 689.8 1092.6 498971.8 6395519.5 92.6 -17.9 316.5 359.1 Final
KSNDDH119 1177.2 474.3 1096.0 499079.5 6395322.6 96.0 -5.4 96.7 175.3 Final
KSNDDH121 1177.6 474.2 1096.9 499079.9 6395322.7 96.9 -9.4 108.0 175.3 Final
Table 4: Full list of significant intercepts.
Hole ID
Incl
.
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
ETW
(m)
KSNDDH084 0.5 45.00 50.00 5.00 0.50 28 2.59 0.73 0.67 3.90 4.1
KSNDDH084 Incl. 1.0 45.00 49.00 4.00 0.58 35 3.18 0.87 0.81 4.75 3.3
KSNDDH084 0.5 57.00 58.00 1.00 0.05 3 0.34 0.30 0.35 0.55 0.8
KSNDDH084 0.5 75.00 76.00 1.00 0.03 4 0.82 0.10 0.05 0.95 0.8
KSNDDH084 0.5 78.00 80.00 2.00 0.03 3 0.42 0.18 0.13 0.56 1.6
KSNDDH084 0.5 90.00 92.00 2.00 0.13 7 0.79 0.68 0.58 1.27 1.6
KSNDDH084 Incl. 1.0 91.00 92.00 1.00 0.12 11 1.22 1.33 1.13 1.96 0.8
KINGSTONRESOURCES.COM.AU | ASX: KSN 15
Hole ID
Incl
.
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
ETW
(m)
KSNDDH084 0.5 102.20 103.60 1.40 0.14 22 3.29 0.52 0.69 4.05 1.1
KSNDDH084 0.5 106.00 107.00 1.00 0.06 5 0.50 0.24 0.53 0.78 0.8
KSNDDH084 0.5 110.00 112.05 2.05 0.11 5 0.29 0.18 0.58 0.64 1.6
KSNDDH084 0.5 122.80 125.00 2.20 0.19 9 0.35 1.12 0.57 1.00 1.8
KSNDDH084 Incl. 1.0 122.80 123.40 0.60 0.33 16 0.63 2.68 1.17 1.91 0.5
KSNDDH084 0.5 130.10 149.00 18.90 0.19 9 0.28 0.99 0.92 0.97 15.1
KSNDDH084 Incl. 1.0 130.40 145.00 14.60 0.21 10 0.32 1.12 1.09 1.11 11.6
KSNDDH084 0.5 152.00 162.00 10.00 0.79 25 0.65 1.28 0.44 2.27 7.9
KSNDDH084 Incl. 1.0 153.00 154.00 1.00 0.58 8 0.51 0.51 0.75 1.53 0.8
KSNDDH084 Incl. 1.0 157.00 162.00 5.00 1.28 44 1.02 2.04 0.50 3.67 3.9
KSNDDH084 0.5 179.00 198.05 19.05 0.44 22 0.10 0.68 0.65 1.21 14.8
KSNDDH084 Incl. 1.0 188.00 191.00 3.00 2.04 58 0.12 1.04 1.84 3.98 2.3
KSNDDH084 Incl. 1.0 194.00 198.05 4.05 0.34 28 0.12 0.49 0.58 1.20 3.1
KSNDDH087 0.5 30.00 30.40 0.40 0.03 11 0.55 2.07 1.30 1.33 0.3
KSNDDH087 0.5 43.70 45.80 2.10 1.03 25 3.50 0.26 0.36 5.23 1.8
KSNDDH087 0.5 48.00 55.00 7.00 0.34 9 0.61 0.79 1.07 1.47 5.8
KSNDDH087 Incl. 1.0 48.00 52.00 4.00 0.54 13 0.82 1.24 1.73 2.16 3.3
KSNDDH087 0.5 78.00 79.00 1.00 0.14 5 1.07 0.09 0.17 1.36 0.8
KSNDDH087 0.5 98.30 99.65 1.35 0.05 4 0.12 0.58 1.36 0.59 1.1
KSNDDH087 0.5 107.00 109.00 2.00 1.89 4 0.38 0.24 0.20 2.66 1.7
KSNDDH087 Incl. 1.0 107.00 108.40 1.40 2.41 5 0.54 0.34 0.27 3.47 1.2
KSNDDH087 0.5 120.00 132.20 12.20 0.04 23 0.28 2.17 3.06 1.62 10.0
KSNDDH087 Incl. 1.0 120.00 123.00 3.00 0.05 21 0.22 2.72 3.28 1.67 2.5
KSNDDH087 Incl. 1.0 126.00 132.20 6.20 0.05 31 0.41 2.60 3.62 2.08 5.1
KSNDDH087 0.5 150.90 155.00 4.10 0.16 15 0.23 1.16 0.83 1.02 3.4
KSNDDH087 Incl. 1.0 150.90 154.00 3.10 0.15 18 0.27 1.30 0.97 1.14 2.5
KINGSTONRESOURCES.COM.AU | ASX: KSN 16
Hole ID
Incl
.
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
ETW
(m)
KSNDDH087 0.5 162.00 163.00 1.00 0.22 5 0.57 0.03 0.10 0.93 0.8
KSNDDH087 0.5 176.00 182.00 6.00 1.80 66 0.02 0.41 0.42 3.39 4.9
KSNDDH087 Incl. 1.0 177.00 179.00 2.00 5.12 174 0.04 0.64 0.42 9.14 1.6
KSNDDH088 0.5 101.00 121.00 20.00 0.32 6 0.49 0.21 0.21 1.04 16.4
KSNDDH088 Incl. 1.0 101.00 102.00 1.00 0.21 32 1.18 0.08 0.02 2.01 0.8
KSNDDH088 Incl. 1.0 111.00 113.00 2.00 1.35 17 1.23 0.44 0.14 3.15 1.6
KSNDDH088 Incl. 1.0 120.00 121.00 1.00 0.76 18 1.96 0.87 1.56 3.56 0.8
KSNDDH088 0.5 124.00 141.00 17.00 0.64 19 1.32 1.42 1.44 2.86 15.0
KSNDDH088 Incl. 1.0 125.40 139.60 14.20 0.74 22 1.54 1.66 1.71 3.34 11.6
KSNDDH088 0.5 150.50 169.00 18.50 3.68 43 1.27 5.39 3.41 7.63 14.0
KSNDDH088 0.5 173.00 174.00 1.00 0.36 2 0.47 0.06 0.17 0.96 0.8
KSNDDH088 0.5 191.00 194.00 3.00 1.68 1 0.04 0.04 0.02 1.97 2.5
KSNDDH088 0.5 201.00 207.00 6.00 0.27 12 0.15 1.22 1.54 1.15 4.9
KSNDDH088 Incl. 1.0 203.00 207.00 4.00 0.34 16 0.18 1.62 1.90 1.45 3.3
KSNDDH111 0.5 59.00 62.00 3.00 0.66 20 4.08 0.09 0.04 5.20 2.0
KSNDDH111 0.5 66.80 68.00 1.20 0.05 2 0.63 0.01 0.01 0.72 0.8
KSNDDH111 0.5 110.00 111.00 1.00 0.07 4 1.10 0.01 0.01 1.25 0.7
KSNDDH111 0.5 119.00 120.00 1.00 0.02 1 0.56 0.01 0.01 0.61 0.7
KSNDDH111 0.5 172.00 173.00 1.00 0.26 1 0.24 0.01 0.17 0.59 0.7
KSNDDH111 0.5 187.00 189.00 2.00 0.03 3 0.75 0.17 0.12 0.88 1.4
KSNDDH111 Incl. 1.0 188.00 189.00 1.00 0.03 4 0.96 0.19 0.05 1.11 0.7
KSNDDH111 0.5 236.00
240.0
0
4.00 0.74 2 0.15 0.07 0.03 1.05 2.8
KSNDDH111 Incl. 1.0 236.00 237.00 1.00 2.60 2 0.33 0.01 0.00 3.31 0.7
KSNDDH111 0.5 275.00 276.00 1.00 0.02 2 0.08 0.12 3.96 0.88 0.7
KSNDDH111 0.5 290.00 291.00 1.00 0.06 5 0.48 0.40 2.31 1.12 0.7
KSNDDH111 0.5 296.00 297.00 1.00 0.19 7 0.62 0.67 2.35 1.48 0.7
KINGSTONRESOURCES.COM.AU | ASX: KSN 17
Hole ID
Incl
.
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
ETW
(m)
KSNDDH111 0.5 326.00 327.00 1.00 0.06 6 0.49 0.15 0.13 0.72 0.7
KSNDDH112 0.5 88.30 96.50 8.20 0.10 7 1.77 0.03 0.03 2.01 3.7
KSNDDH112 0.5 103.00 103.60 0.60 0.01 2 0.64 0.01 0.01 0.69 0.3
KSNDDH112 0.5 131.00 132.00 1.00 0.06 6 0.94 0.07 0.01 1.13 0.5
KSNDDH112 0.5 166.90 167.80 0.90 0.10 7 1.64 0.07 0.20 1.92 0.4
KSNDDH112 0.5 189.00 189.80 0.80 0.01 8 0.33 0.13 0.01 0.50 0.4
KSNDDH112 0.5 198.00 198.70 0.70 0.02 1 0.51 0.01 0.01 0.56 0.3
KSNDDH112 0.5 241.70 242.40 0.70 2.69 1 0.19 0.00 0.01 3.25 0.3
KSNDDH112 0.5 278.40 279.00 0.60 0.48 6 0.61 0.30 1.47 1.58 0.3
KSNDDH112 0.5 283.00 284.10 1.10 5.15 3 0.88 0.02 0.02 6.76 0.6
KSNDDH112 0.5 293.20 293.90 0.70 0.14 2 0.43 0.03 0.07 0.63 0.4
KSNDDH112 0.5 306.60 307.10 0.50 0.01 6 0.05 0.96 2.18 0.71 0.3
KSNDDH112 0.5 315.00 315.50 0.50 0.12 3 0.33 0.21 4.76 1.42 0.3
KSNDDH112 0.5 342.00 343.50 1.50 0.09 2 1.20 0.00 0.01 1.35 0.9
KSNDDH112 Incl. 1.0 343.00 343.50 0.50 0.11 5 2.65 0.01 0.01 2.87 0.3
KSNDDH112 0.5 347.00 348.00 1.00 0.06 3 1.22 0.00 0.03 1.35 0.6
KSNDDH113_R
1
0.5 56.00 56.50 0.50 0.26 10 1.88 0.12 0.12 2.39 0.3
KSNDDH113_R
1
0.5 62.00 65.50 3.50 0.07 3 0.61 0.02 0.16 0.77 2.2
KSNDDH113_R
1
Incl. 1.0 62.00 63.00 1.00 0.17 6 1.36 0.03 0.04 1.67 0.6
KSNDDH113_R
1
0.5 100.90 101.50 0.60 0.16 5 0.81 0.04 0.01 1.08 0.4
KSNDDH113_R
1
0.5 115.50 116.00 0.50 0.02 2 0.62 0.01 0.01 0.69 0.3
KSNDDH113_R
1
0.5 127.00 128.00 1.00 0.01 2 0.50 0.00 0.01 0.54 0.6
KINGSTONRESOURCES.COM.AU | ASX: KSN 18
Hole ID
Incl
.
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
ETW
(m)
KSNDDH113_R
1
0.5 132.00 133.00 1.00 0.09 7 2.21 0.01 0.02 2.44 0.6
KSNDDH113_R
1
0.5 168.50 169.00 0.50 0.18 6 1.88 0.03 0.11 2.21 0.3
KSNDDH113_R
1
0.5 174.50 175.50 1.00 0.06 9 3.69 0.04 0.14 3.96 0.6
KSNDDH113_R
1
0.5 191.00 192.00 1.00 1.64 1 0.30 0.00 0.00 2.17 0.6
KSNDDH113_R
1
0.5 258.00 259.00 1.00 1.82 1 0.19 0.02 0.01 2.27 0.6
KSNDDH113_R
1
0.5 337.00 337.50 0.50 0.03 4 1.74 0.00 0.01 1.85 0.3
KSNDDH114 0.5 33.00 34.00 1.00 0.03 8 0.54 0.47 0.91 0.96 0.6
KSNDDH114 0.5 48.00 49.00 1.00 0.02 19 0.23 0.67 0.04 0.71 0.6
KSNDDH114 0.5 59.00 60.00 1.00 0.02 6 0.26 0.64 0.71 0.62 0.6
KSNDDH114 0.5 95.80 97.00 1.20 0.04 2 0.73 0.11 0.08 0.84 0.7
KSNDDH114 0.5 117.90 119.00 1.10 0.03 5 2.06 0.00 0.01 2.19 0.7
KSNDDH114 0.5 159.00 160.00 1.00 0.06 4 0.77 0.01 0.01 0.91 0.6
KSNDDH114 0.5 169.00 170.00 1.00 0.01 2 0.48 0.46 0.11 0.62 0.6
KSNDDH114 0.5 231.00 232.00 1.00 0.02 4 0.19 0.64 0.83 0.53 0.6
KSNDDH114 0.5 235.00 236.00 1.00 0.04 4 0.38 0.50 0.49 0.66 0.6
KSNDDH115 0.5 145.00 146.00 1.00 0.02 2 1.07 0.01 0.01 1.13 0.5
KSNDDH115 0.5 182.00 186.00 4.00 0.04 5 0.76 0.03 0.00 0.90 1.9
KSNDDH115 Incl. 1.0 182.00 183.00 1.00 0.08 14 1.08 0.11 0.01 1.44 0.5
KSNDDH115 Incl. 1.0 185.00 186.00 1.00 0.03 3 0.92 0.00 0.01 1.01 0.5
KSNDDH115 0.5 239.00 239.50 0.50 0.13 1 0.50 0.00 0.01 0.66 0.3
KSNDDH116 0.5 188.30 189.30 1.00 0.03 13 0.03 1.25 0.09 0.50 0.5
KSNDDH116 0.5 234.20 235.00 0.80 0.01 6 0.07 0.92 1.36 0.58 0.4
KINGSTONRESOURCES.COM.AU | ASX: KSN 19
Hole ID
Incl
.
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
ETW
(m)
KSNDDH116 0.5 248.00 249.00 1.00 0.26 2 0.29 0.00 0.01 0.62 0.5
KSNDDH116 0.5 263.60 264.00 0.40 0.03 1 0.52 0.00 0.01 0.57 0.2
KSNDDH119 0.5 36.00 37.00 1.00 0.10 7 0.41 0.03 0.01 0.6
Share your feedback