Quarterly Activities Report
Released
Released
Announcement PDF
KINGSTONRESOURCES.COM.AU | ASX: KSN 1
QUARTERLY REPORT
For the period ending 30 June 2026
Highlights
Financial Results
• Revenue from metal sales - $11m.
• $11.4m spent on underground development, TSF lift, plant upgrade and exploration.
• Post-quarter receipt of $10 million deferred cash payment from Ok Tedi Mining
Limited pursuant to the sale of the Misima Gold Project.
• $12.9 million raised via Placement ($4.4 million) and Entitlement Offer ($8.47 million).
• As of 30 June 2026, the Company had $11.74 million in unrestricted cash. Post-quarter,
the addition of the $10 million deferred cash and Entitlement Offer proceeds minus
redundancy costs will bring Kingston’s 31 July 2026 cash balance to approximately
$22.7 million.
Mineral Hill Pit Wall Failure and Strategic Pivot
• On 1 June 2026, a wall failure in the Pearse South open pit caused the immediate
suspension of mining. The risks and costs of regaining access to the pit outweigh the
benefits of mining the remaining ore at this time.
• Kingston had planned that revenue from Pearse South would fund the ramp up of
underground mining. The Company has decided to delay the commencement of
underground production in favour of an intense drill out aimed at building a larger
mining inventory to support expanded production.
• This strategic pivot includes drilling 25,000m in FY27 for resource expansion, infill
drilling and near mine exploration.
• As a result of these changes 111 personnel have been made redundant and 18
contractors have been terminated.
Mineral Resource Growth
• The SOZ Mineral Resource Estimate has increased in tonnage by 50% to 6.54Mt.
• Measured and Indicated tonnage increased 38% to 3.05Mt.
• Numerous new high-grade intersections at SOZ and Red Terror.
• Upcoming news flow includes ongoing drilling results, Mineral Resource updates and
Ore Reserve studies.
31 July 2026
KINGSTONRESOURCES.COM.AU | ASX: KSN 2
Building Value with Drilling and Studies
Mineral Hill holds significant strategic value, being the only polymetallic plant in the south
Cobar region with the ability to produce multiple metal concentrates and gold doré (via
Flotation and CIL circuits). Additional value drivers include a Mineral Resource growing
from 12 Mt, fully approved mining and processing infrastructure and existing declines,
ventilation, power, water and surface facilities.
Kingston Managing Director, Andrew Corbett, said:
“The events that transpired during the June quarter resulted in very disappointing
circumstances for the Company. We were planning to use the operating cash flow from
the open pit production to prepare for and transition to underground mining. With $39
million 1
of gross revenue forecast between the June and September now lost, the
Kingston board had to make a difficult decision to protect value for shareholders.”
“Kingston holds significant strategic value. Mineral Hill has a growing Mineral Resource
base, multiple extension targets within the mining license, two underground mines and
a multi-functional processing plant, suitable for most ore types in the Cobar Basin.”
“Kingston will now focus on growth and scale initiatives. The Company’s strategy is to
expand the scale of the operation by drill testing extensions to the current resources, infill
drilling and targeting discovery opportunities”
“In the time since production was halted, we have engaged with a wide range of
stakeholders and formulated a near-term plan that maximises value for the business.
We have 25,000m of drilling budgeted and will be carrying out the work to update
resource estimates for SOZ and Jack’s Hut, delivering an updated Ore Reserve,
completing engineering studies to right-size the plant and getting to a decision to
recommence underground mining.”
1
See ASX Announcement on 11 June 2026 regarding the cash flow impact.
KINGSTONRESOURCES.COM.AU | ASX: KSN 3
Mineral Hill Operations
Open Pit Mining and Processing
The Company mined 33kt of ore at 2.6g/t gold and 40g/t silver from Pearse South over the
months of April and May. On 1 June 2026, site personnel identified a wall failure in the
Pearse South open pit. As tension cracks were visible in the access ramp, open pit mining
was immediately suspended. Kingston undertook an intensive technical assesment of the
incident, including engaging external geotechnical experts. The instability has been
attributed to a soft graphitic shale recently uncovered in the base of the pit that has
interacted with structures and been exacerbated by rainfall. All personnel were kept safe
and all equipment was removed from the pit.
Potential remediation options would have taken a number of weeks and a ramp redesign
would sterilise a material amount of the remaining ore, rendering a re-entry to the pit
unfeasible at this stage. On this basis, Kingston will not resume mining the Pearse South
open pit. The underground orebodies are accessed by separate portals not related to the
Pearse South open pit.
Figure 1: Pearse South Open Pit tension cracks and slumping in the ramp on the
southern wall.
KINGSTONRESOURCES.COM.AU | ASX: KSN 4
Table 1: Summary of physicals for open pit mining at Mineral Hill.
Physical Summary Unit Q1 FY26 Q2 FY26 Q3 FY26 Q4 FY26
Waste Mined t 487,532 618,082 364,646 174,973
Ore Mined t 72,525 71,979 55,665 33,467
Ore Processed t 75,941 78,112 60,893 35,057
Gold Grade g/t 2.05 1.34 2.35 2.33
Silver Grade g/t nm 24.8 87.6 34.3
Processing Recovery % 70% 70% 46% 44%
Gold Sales oz 2,771 2,564 2,011 1,158
Silver Sales oz 25,039 27,974 75,578 32,687
Gold Price (Average) A$/oz 5,389 6,353 7,212 6,403
Silver Price (Average) A$/oz 63 89 122 109
Gold recoveries continued to be impacted by the presence of carbonaceous material in
the ore. This issue is specific to the Pearse South pit and is not related to the underground
orebodies.
The final material from the ROM stockpile was processed during June and sales of copper
and gold concentrate were shipped to customers. Revenue from metal sales was $11.02
million for the quarter. The processing plant has now been placed in care and
maintenance mode, minimising unnecessary expenditure and prioritising capital
towards exploration drilling and the upcoming resource and reserve work.
The pit failure led to significant changes to the Company staffing requirements. Kingston
have retained approximately 24 site personnel and made approximately 111 redundancies
and terminated approximately 18 contractors. Employee entitlements and redundancies
have been paid in full and the Company made extra effort to support personnel with the
transition. Kingston recognises that this situation will impact many people and we are
committed to supporting all employees through this period. An Employee Assistance
Program (EAP) is available for confidential counselling and support.
KINGSTONRESOURCES.COM.AU | ASX: KSN 5
Regional Exploration and Underground Drilling
The rate of underground diamond drilling increased substantially over the June quarter,
with 4,384m drilled between the Southern Ore Zone (SOZ), Red Terror and Jack’s Hut. The
main purpose of the drilling over this period was to tighten the drill density in areas of
planned stoping, particularly for SOZ and Jack’s Hut.
The higher underground drill rates achieved in June and July and the planned addition
of a surface drill rig demonstrate the Company’s ability to achieve 25,000m in FY27.
Kingston expects a high volume of assay results to be returned during the September
quarter as samples are processed from the current drilling.
Figure 2: Monthly drilled metres for the underground diamond drill rig.
Figure 3: Drill hole locations during the June Quarter. Jack's Hut drill hole results remain
pending. Existing underground development shown in yellow.
899
1,507
1,978
-
500
1,000
1,500
2,000
2,500
Apr-26 May-26 Jun-26
Diamond
Drill
Metres
KINGSTONRESOURCES.COM.AU | ASX: KSN 6
Southern Ore Zone Extensions
The SOZ drilling targeted D, G and H Lodes as well as the southern end of A Lode.
Significant intersections from these programs, announced on 15 April 2026 are shown in
Table 2.
Table 2: Southern Ore Zone significant intercept highlights
from 15 April 2026 ASX release.
Hole ID
CuEq
Cutoff
Depth
From
Depth
To
Length
Au
(ppm)
Ag
(ppm)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
KSNDDH056 0.5 25.7 38.1 12.4 0.18 32 0.13 4.44 3.57 2.23
KSNDDH056 Incl 1 36 38.1 2.1 0.27 59 0.28 14.28 3.98 4.52
KSNDDH062 0.5 38.6 60 21.4 0.46 43 1.22 2.70 1.96 3.28
KSNDDH062 Incl 1 38.6 46.1 7.5 1.20 76 3.31 5.67 1.96 7.25
KSNDDH063 0.5 57.5 67.3 9.8 0.14 77 0.13 4.24 5.97 3.41
KSNDDH063 Incl 1 60.5 66.6 6.1 0.16 117 0.18 6.36 8.81 5.04
KSNDDH064 0.5 33.7 56 22.3 0.87 33 0.74 1.34 0.81 2.67
KSNDDH064 Incl 1 33.7 38 4.3 2.76 14 0.53 0.47 1.07 4.18
KSNDDH064 Incl 1 40.4 42 1.6 0.61 59 1.22 1.91 3.24 3.84
KSNDDH064 Incl 1 46.5 56 9.5 0.56 57 1.26 2.53 0.67 3.42
KSNDDH064 0.5 121.8 130.3 8.5 0.62 7 1.04 0.51 0.54 2.05
KSNDDH064 Incl 1 124.9 130.3 5.4 0.94 11 1.53 0.67 0.67 3.01
KSNDDH066 0.5 53.3 57.4 4.1 0.09 9 2.18 0.07 0.04 2.46
KSNDDH067 0.5 22 22.5 0.5 1.39 10 3.44 0.04 0.75 5.34
KSNDDH070 0.5 53 63.5 10.5 1.23 12 3.25 0.07 0.01 4.87
KSNDDH071 0.5 50 55 5 0.84 9 3.09 0.05 0.02 4.23
KSNDDH071 Incl 1 50 54 4 1.04 11 3.66 0.06 0.02 5.05
Post-quarter end, additional drilling results were reported for SOZ, with KSNDDH085
returning high-grade polymetallic mineralisation. The intersection between 209m and
231.1m returned high-grade assays for gold, copper, lead, zinc and silver, but is particularly
high for lead and zinc. The sections of solid galena (lead mineral) are shown in the core
photos in Figure 5 between 223.45 and 228.75m. The highlight intersections for
KSNDDH085 include:
• 31.10m @ 2.68% Pb, 2.62% Zn, 24g/t Ag (1.96% CuEq) from 165.9m (~12m
Estimated True Width, ETW).
• 22.10m @ 1.62g/t Au, 1.47% Cu, 8.98% Pb, 3.13% Zn, 132g/t Ag (7.61% CuEq) from
209.0m (~9m ETW).
High Grade
KINGSTONRESOURCES.COM.AU | ASX: KSN 7
KSNDDH068, 069 and 079 also intersected high-grade copper-gold mineralisation in the
G Lode and H Lode areas at the northern end of the Southern Ore Zone. ). Highlight
intersections include:
• 6.20m @ 0.93g/t Au & 0.92% Cu from 71.2m (KSNDDH068)
• 10.85m @ 0.39g/t Au & 1.03% Cu from 80.1m (KSNDDH068)
• 2.35m @ 4.43g/t Au & 1.33% Cu, from 20.3m (KSNDDH069)
• 4.40m @ 1.09g/t Au & 1.44% Cu, from 72.2m (KSNDDH069)
• 8.00m @ 2.27g/t Au, 1.50% Cu, 11g/t Ag from 54.0m (KSNDDH079)
Significantly, these results extend the SOZ mineralisation beyond the existing resource
on two fronts. KSNDDH085 extends the mineralisation to the east and south, while
KSNDDH079 has extended the Au-Cu rich G/H Lode further to the north.
Figure 4: Oblique cross section aligned with KSNDDH085 and KSNDDH086.
KINGSTONRESOURCES.COM.AU | ASX: KSN 8
Figure 5: KSNDDH085 drill core, 215.90m to 228.85m. Tray 53 contains abundant
epithermal veining with high grades for gold, copper, lead, zinc and silver. In Tray 54,
high grade base metal and silver mineralisation starts from 223.45m and continues
into Tray 55.
KINGSTONRESOURCES.COM.AU | ASX: KSN 9
Red Terror Drilling Extensions
The drilling at Red Terror has extended the mineralisation at depth and opened up new
possibilities for resource extension to the north. The mineralisation remains open in both
directions.
The results in KSNDDH080 are the most outstanding, with the high-grade core returning
8.55m @ 23.80g/t gold, 0.91% copper and 16g/t silver. Hole KSNDDH081 is the up-dip
extension and has returned 4.00m @ 8.83g/t Au and 1.40% Cu. Additionally, high-grade
channel samples (CS1160ES) collected historically in the development drive north of
KSNDDH080 and 081 provide strong indications of northerly extensions.
Red Terror drilling highlights:
KSNDDH080
19.00m @ 10.75g/t Au, 0.63% Cu, 8g/t Ag from 41.0m, including:
• 8.55m @ 23.80g/t Au, 0.91% Cu, 16g/t Ag from 42.5m
KSNDDH081 – 17.00m @ 5.09g/t Au, 0.93% Cu from 40.0m, including
• 4.00m @ 8.83g/t Au and 1.40% Cu
KSNDDH075 – 3.00m @ 1.67g/t Au, 1.62% Cu from 137.0m
KSNDDH076 – 15.00m @ 1.19g/t Au, 0.60% Cu from 94.0m
Table 3: Key intersections from the extensional drilling at
Red Terror
Hole ID
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
KSNDDH075 0.5 137.00 140.00 3.00 1.67 5 1.62 0.22 0.65 3.76
KSNDDH075 Incl 1.0 138.00 140.00 2.00 2.49 7 1.99 0.33 0.94 5.15
KSNDDH076 0.5 94.00 109.00 15.00 1.19 2 0.60 0.06 0.14 2.02
KSNDDH076 0.5 123.00 132.00 9.00 0.11 1 0.49 0.02 0.13 0.66
KSNDDH080 0.5 41.00 60.00 19.00 10.75 8 0.63 0.31 0.21 13.02
KSNDDH080 Incl 1.0 42.45 51.00 8.55 23.80 16 0.91 0.62 0.17 28.28
KSNDDH080 0.5 66.00 75.60 9.60 0.20 14 1.14 1.21 0.08 1.81
KSNDDH080 Incl 1.0 66.00 70.10 4.10 0.40 29 1.99 2.75 0.10 3.39
KSNDDH081 0.5 40.00 47.00 7.00 5.09 4 0.93 0.23 0.30 6.86
KSNDDH081 Incl 1.0 43.00 47.00 4.00 8.83 6 1.40 0.31 0.25 11.60
KSNDDH082 0.5 39.10 45.60 6.50 0.49 1 0.18 0.01 0.07 0.75
KSNDDH082 Incl 1.0 45.10 45.60 0.50 3.96 1 0.30 0.01 0.07 4.82
High-Grade
KINGSTONRESOURCES.COM.AU | ASX: KSN 10
Figure 6: Red Terror drilling results, indicating potential extension of high-grade gold and
copper to the south.
An underground mining crew has been retained on site to continue rehabilitation of
historical underground development drives and maintain the underground work areas in
preparation for the future transition back to production. Additionally, the underground
mining team will be assisting the geology and drilling crews on preparing drill platforms.
KINGSTONRESOURCES.COM.AU | ASX: KSN 11
Major Upgrade to the SOZ Mineral Resource Estimate
The update to the SOZ Mineral Resource Estimate (MRE) was released during the quarter
to include an additional 26 underground drill holes for 3,413m.
Key highlights include:
• SOZ total MRE tonnage increased 50% from 4.36Mt to 6.54Mt
• Measured and Indicated tonnage increased 38% from 2.21Mt to 3.05Mt
• Inferred Resource tonnage has increased 62% from 2.15Mt to 3.49Mt.
• Resource tonnage for all Mineral Hill deposits has now increased 22% from 9.89Mt
to 12.07Mt
• Contained metal is estimated as 873koz at 2.2g/t AuEq or 323kt at 2.7% CuEq .
Central to this update is the increase in higher-confidence resource categories. Measured
and Indicated Resources at SOZ have increased by 38% to 3.0Mt, adding 0.8Mt of material
that can be considered for Ore Reserve conversion, subject to the completion of
appropriate technical and economic studies.
Table 4: Mineral Resource Estimate – Southern Ore Zone – June 2026.
Classification
Tonnes
kt
Au
g/t
Cu
%
Pb
%
Zn
%
Ag
g/t
Au
koz
Cu
kt
Pb
kt
Zn
kt
Ag
Moz
Measured 629 1.81 1.14 0.65 0.62 11.8 36.7 7.2 4.1 3.9 0.239
Indicated 2,418 1.07 0.81 1.69 1.55 19.0 82.9 19.7 40.9 37.4 1.475
Inferred 3,490 0.96 0.78 0.83 0.86 10.5 107.8 27.1 28.9 29.9 1.176
Total 6,538 1.08 0.83 1.13 1.09 13.7 227.4 54.0 73.8 71.2 2.889
Kingston has planned an additional 25,000m of drilling over the next 12 months to further
expand the scale of the Mineral Hill resource base. Drilling will prioritise extension
opportunities at Jack’s Hut, SOZ and potential discoveries in new areas such as Parker’s
Hill East.
Results are pending for the recent underground drilling program at Jack’s Hut, which
targeted the mineralisation just south of the existing development. Applications have
now been submitted for a surface drilling program over Jack’s Hut to target depth
extensions of the high-grade gold and copper in these lodes. Surface drilling will also be
competed over the southern extensions of SOZ, aiming to test the high-grade
polymetallic mineralisation intersected in 2023 with KSNDDH017 (see ASX
announcement on 1 November 2023).
KINGSTONRESOURCES.COM.AU | ASX: KSN 12
Corporate and Finance
The June 2026 quarter was a period of significant change for Kingston, marked by
suspension of the open pit mining, a strategic shift towards resources growth and
underground development and initiatives to strengthen the Company’s financial
position. Table 5 summarises the Company’s quarterly cash flows and reflects the
financial impact of these activities during the period.
Table 5: June quarterly cash flow
Cash Inflow/(outflow) A$'000
Opening cash & cash equivalents 25,419
i. Receipt from customers 11,027
ii. Production cost (8,691)
iii. Staff and corporate cost (5,629)
iv. Net interest received 177
Net cash used in operating activities (3,116)
v. Property, plant and equipment (3,185)
vi. Exploration and evaluation (567)
vii. Other non-current assets (9,233)
Net cash from investing activities (12,985)
Net proceeds from equity raising 4,238
Advance – concentrate sales (778)
Lease payments (1,038)
Net cash used in financing activities 2,422
Closing cash & cash equivalents 11,740
i. Revenue for the quarter (unaudited) totalled $11.02 million, a 55% decrease
compared to previous quarter, comprising of cash receipts and concentrate
receivables.
ii. The group incurred $8.69 million in production cost during the quarter.
iii. Following the cessation of mining activities at the Pearse South open pit, as
announced on 11 June 2026, staff and corporate costs of $5.62 million includes
redundancy payments of $2.4 million to 111 employees, $2.94 million in
employee related costs, $180k in director fees and $100k in corporate costs.
iv. Net interest received during the quarter totalled to $177k
v. Property plant and equipment expenditure of $3.1 million during the quarter
included $1.5 million for the construction of Tailings Storage Facility 2 and
approvals for Tailings Storage Facility 3, $903k on the processing plant upgrades
and $782k on acquisition of other assets.
KINGSTONRESOURCES.COM.AU | ASX: KSN 13
vi. the Group incurred $567k in exploration and evaluation expenditure during the
quarter.
vii. A total of $9.2 million was spend in the development of the Southern Ore Zone
underground project.
viii. Lease payment of $1.03m related to finance lease obligations during the
quarter, including approximately $392k in one off deposit payments.
On 18 June 2026, Kingston Resources Limited announced its intention to raise
approximately $12.9 million (before costs) through a $4.4 million Placement and an $8.47
million fully underwritten Entitlement Offer, both priced at $0.035 per share.
The Placement was successfully completed on 25 June 2026. Kingston's largest
shareholder, Farjoy Pty Limited (Farjoy), subscribed for $1.6 million under the Placement,
resulting in a shareholding of 19.9% at 30 June 2026.
The fully underwritten Entitlement Offer was completed on 23 July 20262
, with eligible
shareholders subscribing for approximately 43% of the offer. The Entitlement Offer was
underwritten by Argonaut Corporate Finance Limited, with Farjoy participating as a sub-
underwriter.
Under the Entitlement Offer, including its entitlement and sub-underwriting
commitments, Farjoy subscribed for approximately $6 million of new shares. Following
completion of the Offer, Farjoy's shareholding increased to 25.09% of the Company's
issued capital (see the Entitlement Offer Prospectus, released on 25 June 2026, which
provides details on Farjoy’s relevant interest in the Company being greater than 20% a
consequence of sub-underwriting the offer).
As at 30 June 2026, Kingston’s closing cash balance was $11.74 million in cash and cash
equivalents, with an additional $7.47 million held as restricted cash for Rehabilitation
Security Bond. Post-quarter end, the addition of the $10 million deferred cash from the
Misima sale and Entitlement Offer proceeds brings Kingston’s current unrestricted cash
balance to $22.74 million. The Company's Appendix 5B — Quarterly Cash Flow Report has
been lodged concurrently with this Quarterly Activities Report.
2
See ASX Announcement Results of the Entitlement Offer released on 21 July 2026.
KINGSTONRESOURCES.COM.AU | ASX: KSN 14
Figure 7: KSN Quarterly Cash Flow Waterfall — 30 June 2026 (A$'000).
25,419
11,740
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
A$'000
Cash Inflow ($'000) Cash Outflow ($'000)
KINGSTONRESOURCES.COM.AU | ASX: KSN 15
Metal Equivalents
This announcement quotes metal equivalent grades defined by Kingston Resources.
Price assumptions used are based on market consensus forecasts with adjustments to
account for reasonable prospects for eventual economic extraction (RPEEE), as guided by
JORC reporting guidelines. Copper equivalent (CuEq) conversion factors are used within
the announcement and are calculated by multiplying the grades for each contributing
metal by their respective metal price and recovery and dividing by the multiplication of
the copper price and copper recovery.
Metallurgical recoveries are based on historical production (2010-2016) as well as recent
metallurgical test work and are applied to the Resource and Reserve calculated grades
for each commodity. The Company is of the opinion that all the elements included in the
metal equivalent calculations have demonstrated potential to be recovered and sold.
Mineral Hill is currently producing metal concentrates and dore (from the CIL) on site.
Upon the commencement of underground polymetallic production, the Company will
have a Cu flotation circuit, Pb flotation circuit and Zn flotation circuit to produce three
different concentrates as well as precious metal dore.
Table 6: Commodity prices, metallurgical recoveries and metal equivalent
factors.
Commodity Unit Price Deposit Commodity
Recovery
(%)
AuEq Factor CuEq Factor
Gold US$/oz 5,074 SOZ Gold 83 1.000 1.132
Silver US$/oz 76.1 Silver 88 0.016 0.018
Copper US$/lb 6.16 Copper 88 0.883 1.000
Lead US$/lb 1.08 Lead 75 0.132 0.149
Zinc US$/lb 1.51 Zinc 66 0.163 0.184
AuEq g/t = Au g/t + (0.883 * Cu %) + (0.016* Ag g/t) + (0.132 * Pb %) + (0.163 * Zn)
CuEq % = Cu % + (1.132 * Au g/t) + (0.018* Ag g/t) + (0.149 * Pb %) + (0.184 * Zn)
KINGSTONRESOURCES.COM.AU | ASX: KSN 16
Table 7: Tenement Schedule (ASX LR 5.3.3) as at end of quarter
Tenement Project Name & Location Status Ownership Type Title Area
EL1999 Mineral Hill, NSW Live 100% EL 17 UNITS
EL8334 Mineral Hill, NSW Live 100% EL 100 UNITS
ML5240 Mineral Hill, NSW Live 100% ML 32.37 HA
ML5267 Mineral Hill, NSW Live 100% ML 32.37 HA
ML5278 Mineral Hill, NSW Live 100% ML 32.37 HA
ML332 Mineral Hill, NSW Live 100% ML 22.36 HA
ML333 Mineral Hill, NSW Live 100% ML 28.03 HA
ML334 Mineral Hill, NSW Live 100% ML 21.04 HA
ML335 Mineral Hill, NSW Live 100% ML 24.79 HA
ML336 Mineral Hill, NSW Live 100% ML 23.07 HA
ML337 Mineral Hill, NSW Live 100% ML 32.27 HA
ML338 Mineral Hill, NSW Live 100% ML 26.3 HA
ML339 Mineral Hill, NSW Live 100% ML 25.09 HA
ML340 Mineral Hill, NSW Live 100% ML 25.79 HA
ML1695 Mineral Hill, NSW Live 100% ML 8.779 HA
ML1712 Mineral Hill, NSW Live 100% ML 23.92 HA
ML1778 Mineral Hill, NSW Live 100% ML 29.05 HA
ML5499 Mineral Hill, NSW Live 100% ML 32.37 HA
ML5621 Mineral Hill, NSW Live 100% ML 32.37 HA
ML5632 Mineral Hill, NSW Live 100% ML 27.32 HA
ML6329 Mineral Hill, NSW Live 100% ML 8.094 HA
ML6365 Mineral Hill, NSW Live 100% ML 2.02 HA
Forward Looking Statements
This announcement contains forward-looking statements that are subject to risk factors
associated with mining and processing operations. Actual results may differ materially.
The Company cautions that forward-looking statements are not guarantees of future
performance.
This release has been authorised by the Kingston Resources Limited Board.
For all enquiries, please contact Managing Director, Andrew Corbett, on +61 2 8021 7492.
KINGSTONRESOURCES.COM.AU | ASX: KSN 17
About Kingston Resources
Kingston is focused on building scale and future throughput rates at its Mineral Hill gold
and copper mine in NSW.
Mineral Hill is a gold and copper mine located in the Cobar Basin of NSW. The Company’s
aim is to extend the mine’s life through organic growth and consider regional deposits
that could be processed at Mineral Hill’s processing plant.
The Mineral Hill Mineral Resource estimates included in this announcement were
released in ASX announcements on 15 March 2023 (Pearse South), 21 March 2023 (Jack’s
Hut) and 13 November 2025 (Red Terror and Parker’s Hill) and 24 June 2026 (Southern Ore
Zone). The Ore Reserve estimate for the Southern Ore Zone was released in ASX
announcements on 30 September 2024. Further information is included within the
original announcements.
Kingston is not aware of any new information or data that materially affects the
information included in this announcement. All material assumptions and technical
parameters underpinning the Mineral Resource estimates and production targets
continue to apply and have not materially changed.
Mineral Hill Mine, NSW (100%)
• Intensive drilling program to grow resources and
reserves.
• Significant upside: Measured and Indicated Resources
comprise 56% of the 12.1 Mt resource – substantial
opportunity for conversion to Ore Reserves.
• Excellent Infrastructure: Operating processing plant
capable of producing multiple concentrates and precious
metal dorѐ.
• Exploration potential: Exceptional upside within current
Mining Leases (ML) and Exploration Licenses (EL).
KINGSTONRESOURCES.COM.AU | ASX: KSN 18
Mineral Resources and Ore Reserves
Mineral Hill Mineral Resource and Ore Reserve - JORC Reporting (2012 Ed.).
Mineral Deposit
Resource
Category
Tonnes
(kt)
Grade Metal
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 2,418 1.07 0.81 1.69 1.55 19 83 20 41 37 1,477.1
Inferred 3,490 0.96 0.78 0.83 0.86 11 108 27 29 30 1,178.2
Sub-Total 6,538 1.08 0.83 1.13 1.09 14 227 54 74 71 2,889.0
Jack's Hut
Indicated 608 1.53 1.28 0.50 0.38 7 30 8 3 2 133.7
Inferred 1,032 1.09 0.70 1.05 0.76 28 36 7 11 8 917.1
Sub-Total 1,640 1.25 0.91 0.84 0.62 20 66 15 14 10 1,050.8
Red Terror
Indicated 83 0.58 2.02 - - 4 2 2 - - 9.5
Inferred 131 1.38 1.14 - - 2 6 1 - - 10.2
Sub-Total 214 1.07 1.48 - - 3 7 3 - - 19.7
Parker's Hill
Indicated 2,923 0.17 1.04 1.73 0.81 44 16 30 51 24 4,172.0
Inferred 643 0.16 0.69 1.39 0.93 37 3 4 9 6 758.0
Sub-Total 3,566 0.17 0.98 1.67 0.83 43 19 35 60 30 4,930.0
Pearse South
Indicated 77 3.86 - - - 93 10 - - - 231.0
Inferred 36 2.45 - - - 5 3 - - - 5.4
Sub-Total 113 3.41 - - - 65 12 - - - 236.4
Total Mineral
Resources
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 6,109 0.71 0.99 1.57 1.05 30 140 60 95 64 6,023.2
Inferred 5,332 0.91 0.76 0.92 0.83 17 156 40 49 44 2,869.0
Grand
Total
12,071 0.85 0.90 1.23 0.93 23 332 107 147 111 9,126.0
Mineral Deposit
Reserve
Category
Tonnes
(kt)
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone Probable 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
TOTAL 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
1. Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
2. Probable Ore Reserves are derived from Indicated Mineral Resources.
3. The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
4. The Ore Reserves form part of the Mineral Resources.
KINGSTONRESOURCES.COM.AU | ASX: KSN 19
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is
based on information compiled by Mr. Stuart Hayward BAppSc (Geology) MAIG, of 360
Geoscience Pty Ltd, a Competent Person who is a member of the Australian Institute of
Geoscientists. Mr. Hayward has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr. Hayward confirms that the information in the market announcement
provided is an accurate representation of the available data and studies for the material
mining project and consents to the inclusion in this report of the matters based upon the
information in the form and context in which it appears.
The Competent Person signing off on the overall underground SOZ Ore Reserves
Estimate is Mr. Steven Weckert BE ME (Min) CP, of Australian Mine Design and
Development Pty Ltd, who is a Member of the AusIMM and who has sufficient relevant
experience in operations and consulting for underground metalliferous mines. Mr.
Weckert consents to the inclusion in this report of the information pertaining to the
Mineral Hill SOZ Ore Reserve in the form and context in which it appears.