Investor Presentation - RIU Sydney Resources Roundup
Released
Released
Announcement PDF
Step change in cash
flow with open pit
mining
RIU Sydney
Conference
Accelerating to Hard
Rock Mining
Expanding the
underground mine life
May 2024
Building a Gold and
Copper miner
ASX: KSN
Important notices and disclaimer
Forward Looking Statements
Mineral Hill Gold Bar
Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects,
are forward looking statements. Such forward looking statements: include, among other things, statements regarding incomplete and uncertain
proposals or targets, production and prices, operating costs and results, capital expenditures, and are or may be based on assumptions and estimates
related to future technical, economic, market, political, social and other conditions; are necessarily based upon a number of estimates and assumptions
that, while considered reasonable by KSN, are inherently subject to significant technical, business, economic, competitive, political and social
uncertainties and contingencies; and involve known and unknown risks and uncertainties that could cause actual events or results to differ materially
from estimated or anticipated events or results reflected in such forward looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or
results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”,
“estimate”, “may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking statements made in this
presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements are not guarantees of
future performance and accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty
therein.
Disclaimer
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other
person accepts any liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the
information contained in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or
correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation
assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue,
securities or other financial products. The information contained in this presentation is not investment or financial product advice and is not intended
to be used as the basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives,
financial situation or particular needs of any particular person. Before making an investment decision, you should consider, with or without the
assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial
circumstances. Past performance is no guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June
2023, $6.5m Capital Raising or Mineral Hill Production Expansion.
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
2
Important notices and disclaimer
Exploration by Other Explorers
This presentation contains information sourced from the reports of Other Explorers.
References to the original reports are provided as footnotes where the information is cited
in this presentation. KSN does not vouch for the accuracy of these reports. KSN has taken
the decision to include this information as it is in the public domain and as we assess it to be
of relevance to shareholders and investors.
Underground Production Target
The LOM plan includes Mineral Resource Estimates from the Southern Ore Zone (SOZ) and
Jack’s Hut to estimate the Production Target. All Ore Reserves and Mineral Resources
underpinning this LOM plan have been prepared by Competent Persons in accordance with
the 2012 JORC reporting guidelines. Probable Ore Reserve provides 46% of the total LOM
processing plant feed tonnage. The Underground production target is based on Mineral
Resource estimates and comprises Measured (7%), Indicated (31%), Inferred (56%) and
unclassified (6%) material.
There is a low level of confidence associated with Inferred Mineral Resources and there is
no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of future
results or events and should not be solely relied upon by investors when making investment
decisions. Further evaluation work and appropriate studies are required to establish
sufficient confidence that this target will be met. The Company notes that the Project
forecasts a positive financial performance and is therefore satisfied that the use of Inferred
resources in production target reporting and forecast financial information is not the
determining factor in overall Project viability and that it is reasonable to report the LOM
plan with Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the forwardlooking statements included in this announcement. The detailed reasons for that
conclusion are outline throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
3
Kingston Resources: Investment highlights
1
Successful Tailings Project & Open Pit Restart1: +$25m operating cash from the
Tailings project, Pearse open pit restart (Q2'24), boosting payable metal 133%
YoY (FY25) to ~7kt CuEq (high-grade gold/silver).
2
Processing Plant Expansion & Resources Growth: Refurbishment nearing
completion, crushing to start Q2'24. Internal expansion studies underway. Initial
underground reserve (Q3'24), drilling for expansion (Q4'24).
3
Strategic Advantage & Energy Transition Alignment: KSN owns 1 of 2
polymetallic plants with a CIL in Cobar Basin. Mineral Hill supports green metals
demand.
4
Misima Gold Project Potential2: Large, low-cost 20-year gold project with
A$1.3Bn2 NPV at a gold price US$2,000/oz.
5
Funded Growth1: $13.5 recent equity raise to accelerate Hard Rock mining at
Mineral Hill and evaluate strategic options for Misima.
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions
2. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
4
Corporate snapshot
3-Year Share Price Performance
Shares on issue
633.7m
Warrants & options2,3
98.7m
Share price @ 6 May 2024
$0.07
0.3
Market cap @ 6 May 2024
$42.5m
0.2
Cash @ 8 April 2024
$10.7m
0.1
Restricted cash for environmental bond
$7.3m
0
Debt ($5m mature 7 July 2026, $5m matures 29 June 2027)
$10m
Market Volume('000) RHS
Close Price (A$) (LHS)
8000
6000
4000
2000
Jun 19
Sep 19
Dec 19
Mar 20
Jun 20
Sep 20
Dec 20
Mar 21
Jun 21
Sep 21
Dec 21
Mar 22
Jun 22
Sep 22
Dec 22
Mar 23
Jun 23
Sep 23
Dec 23
Mar 24
0
Shareholder Structure
● Quintana
● Delphi
● Winchester Investments
● Farjoy
● Other shareholders
10.5%
10.2%
9.9%
7.5%
61.8%
1. Estimated Cash balance, as at 8 April 2024, excludes $7.27m cash backed environmental bond
2. 38m unlisted options @ $0.14, exp 31 July 25,
3. 25m unlisted warrants @ $0.20, exp 07 July 2027, 35.7m unlisted warrants @ $0.14 exp 29 June 2028. Exercise price of the warrants to be repriced post capital raise
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
5
Strategic regional setting for foundational base metals1
• Strategic advantage of ownership of flexible processing
capacity and 8.9Mt of polymetallic resources
• Clear path to underground mining sees increasing levels
of copper and zinc production
Zinc
Lead
Gold
Silver
FY24
FY27
Copper
Silver
Gold
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
6
Highly experienced and well-regarded Executive Team
Significant experience across the development life cycle through to production
Mick Wilkes
Andrew Corbett
Tony Wehby
Stuart Rechner
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Mick is a seasoned mining
professional with 35 years’
experience in the industry,
primarily in gold and base
metals. He has specialised in
sustainable project
development, construction, and
operations throughout his
career.
Andrew is a highly experienced
mining engineer with over 25
years in mine management and
financial markets. He has an indepth understanding of mining,
equity markets, business
development and corporate
strategy.
Tony is a highly experienced
board member and chairman,
previously Non-Executive
Chairman of Tellus Resources
Limited and Aurelia Metals
Limited, and a Director of
Harmony Gold (Aust) Pty Ltd.
Stuart is an experienced
company director and geologist
with a background in project
generation and acquisition in
Australia and overseas. Mr
Rechner holds degrees in both
geology and law.
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
7
Mineral Hill
Growth strategy for
2024 and beyond
Growth Strategy for 2024
and Beyond
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
8
Extensive existing infrastructure
Targeting a mine plan beyond 10 years
Mineral Hill Processing Capacity
Production set to increase 133% in FY25
700 ktpa
Phase 1
Complete the Tailings
Project
Phase 3
Regional acquisition
potential to expand
the processing
capacity
350 ktpa
Today
The Future
Float capacity
CIL capacity
8,000
3.14
3.18
3.03
6,000
4,000
4.0
3.0
2.0
0.86
2,000
1.0
-
0.0
FY24
FY25
FY26
CuEq Grade (%)
Phase 2
Lift production in
FY25 , commence
copper production
and extend the mine
life
Payable Metal (CuEq t)
Metal Forecast1
FY27
Gold
Silver
Copper
Lead
Zinc
CuEq Grade (%)
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions.
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
9
Profitable growth: Mineral Hill drives cash & resources
Strong operational performance; well-positioned for continued growth
Delivering the Plan- $25m operating cash flow since acquiring
Mineral Hill January 2022 ($23m total consideration1)
Resource Growth – Total Mineral Resources now at 767,000 oz
AuEq
Extending the Life of Mine - Targeting greater than 5 years
life of mine through open pit and underground mining
Critical Minerals - NSW Government’s critical minerals grant
of $500k facilitating copper production in 2025
1. ASX : Mineral Hill transaction completion 18/1/2022; Acquisition of Mineral Hill Gold and Copper Mine 18/11/2021
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for additional Mineral Hill Resource and Reserve information.
3. Gold equivalent calculated based on consensus commodity prices with adjustments based on company expectations. See Appendix for equivalency calculations
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
10
Mineral Hill: strategic location in the Cobar Basin
Significant organic and regional resource growth opportunities
Abundance of gold-silver and polymetallic
deposits within trucking distance of Mineral
Hill processing plant
• Prime Cobar Basin Location: Situated in the heart
of Australia's premier mining basin, rich in copper
(critical for clean energy).
• Infrastructure & Workforce Ready: fully approved
project, excellent infrastructure and skilled
workforce for efficient operations.
Figure: Mineral Hill regional geology, resources and infrastructure.
www.kingstonresources.com.au I ASX: KSN
1. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for additional Mineral Hill
Resource and Reserve information.
RIU Sydney Conference | May 2024
11
Refurbished plant scheduled for Q4 FY2024
Transforming Mineral Hill back to a hard rock mining operation
Fast-Track to
Production:
All approvals
secured,
refurbishment on
track (crushing to
commence Q2'24),
initial oxide ore
feed for dore
production.
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
12
Underground and open pit mining
Focus on extending 5-year mine life, producing both precious and base metals
Open pit mining
to commence in
Q2 2024
Underground
refurbishment is
well advanced
Calendar Year
2023
Underground
drilling
to commence
in Q4 2024
2024
Underground
mining to
commence later
H1 2025
2025
2026
2027 +
Tailings Project
Open pit mining (Pearse)
Underground resource drilling
Underground mining
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
13
Pearse Open Pit Mining- Updated MRE
Significantly larger gold deposit
• Updated Pearse North MRE, with gold and silver increasing
from the previous estimate 30% and 67% respectively
• Both pits contain high grade gold and silver
• All permits and approvals in place
Table 1 Pearse North Mineral Resource Estimate at 1.0g/t Au Cut Off
Classification
Total
Tonnes
kt
Grade
Au g/t
Grade
Ag g/t
Metal
Au koz
Metal
Ag koz
292
3.2
33.9
30
318
Table 2 Pearse South Mineral Resource Estimate at 1.0g/t Au Cut Off
Classification
Total
Tonnes
kt
Grade
Au g/t
Grade
Ag g/t
Metal
Au koz
Metal
Ag koz
204
3.8
69
25
457
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
1. See ASX Announcement dated 7/5/2024 and 15/3/2023
www.kingstonresources.com.au I ASX: KSN
Pearse North and South pit designs
RIU Sydney Conference | May 2024
14
SOZ underground mining – low cost, high-grade
Reduced capital required for high-grade ore: leveraging existing declines
Long section of Southern Ore Zone looking east
• Production target1 using the Southern Ore Zone (SOZ) and Jack’s Hut
• Existing decline development reduces capital expenditure
• Access to SOZ underground is complete
• Mineral Resource update and Ore Reserve work due Q4 2024
• Jack’s Hut is highly prospective - potential to increase Mineral
Resources
Underground long section looking east – Jack’s Hut and Southern Ore Zone
Mineral Resource Estimate for the Southern Ore Zone, November 20222
Tonnes (Mt)
3.80
Mineral Hill Trend – 2.5km strike length
1. See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions.
2. See ASX Announcement dated 24 November 2023 and 21 March 2023 for MRE announcements
www.kingstonresources.com.au I ASX: KSN
Au g/t
1.29 g/t
Ag g/t
19 g/t
Cu %
0.9%
Pb %
1.6%
Zn %
1.4%
Pb %
0.8%
Zn %
0.6%
Mineral Resource Estimate for the Jack’s Hut, 21 March 20232
Tonnes (Mt)
1.60
Au g/t
1.25 g/t
Ag g/t
20 g/t
Cu %
0.9%
RIU Sydney Conference | May 2024
15
SOZ underground – infill drilling
Infill drilling expands high-grade copper
• New Discovery at Mineral Hill
• New lode intersected in the footwall (New
Structure #2)
Existing
Mineral
Resource
Zone
• 12.5m @ 3.41% CuEq1 (KSNDDH017)
• Infill drilling confirms main underground lode
over 400m strike:
• 3m @ 8.13% CuEq (KSNDDH020)
Potential
Mineral
Resource
Expansion
Zone
• 3m @ 6.18% CuEq (KSNDDH022)
• 10.2m @ 2.73% CuEq (KSNDDH023)
1. See ASX Announcement on 1 November 2023: Near mine discovery at Mineral Hill. CuEq = see the slide on Metal Equivalents
2. See ASX Announcement on 9 April 2024 - Southern Ore Zone Confirmed over 400m Strike
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
16
Advanced near mine development
plan
5
EL1999
Resource expansion strategy and near mine
exploration
• Five priority targets within the ML
• Focus on resource expansion and extending the
mine life
1
Southern Ore Zone (SOZ) Extension
2
South Aurum (Pearse Corridor)
3
Ashes Graben
4
Parkers Hill East
5
Bogong Prospect
www.kingstonresources.com.au I ASX: KSN
4
22
3
2.5km
EL1999
1
EL1999
RIU Sydney Conference | May 2024
17
Upside opportunities
Resource expansion strategy and near mine exploration
EOZ high
grade Au
target
• Existing
development in
place
Parkers Hill
MRE update and
extensions
Red Terror
target
• Mineralisation
over 2.5km
• Multiple ore
bodies
GD140
target
SOZ MRE1
update
Jacks Hut
Infill & Extension
New Lode
Extension
G-H Lode Infill
1. MRE – Mineral Resource Estimate
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
18
Exploration within EL1999
Multiple drill targets to be tested
• Several near-mine copper and gold targets
• Lead is the primary pathfinder element for
polymetallic mineralisation. Copper is highly mobile
and less commonly anomalous at surface
• Geochemical anomalies coincident with IP
chargeability anomalies
• Broadly aligned with magnetic lineaments and
domains
• Multiple untested targets
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
19
Regional
exploration
Highly prospective
exploration tenure within
EL8334
• Coincident geophysical
features (gravity and
induced polarisation)
• Highly prospective
geology and regional
scale structures
• Lead-in-soil anomalies
adjacent to prospects in
neighbouring tenements
• The only operating
polymetallic processing
plant in southern Cobar
Basin
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
20
Misima
Gold Project
RIU Sydney Conference | May 2024
21
Misima – definitive feasibility and ore reserve1
Large scale, long-life, low-cost open pit gold and silver mine
• Large, low-cost 20-year gold project with A$956m1
NPV at a gold price US$1,800/oz.
• DFS uses $1,800/oz gold price and 0.7 AUD:USD. Gold
price scenario of $2,000/oz lifts LOM NPV to $1.3bn
Misima Project
• 600km from Port Moresby
• DFS Complete
• Historically produced 4Moz AuEq over 15 years
3.8Moz Gold
22.1Moz Silver
Resource
Resource
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
• Kingston is running a process to bring about value
realisation through a sale or JV
Poured gold
koz
Recovery
160
Production at AISC
100%
140
120
95%
A$1,217/oz
20-year life of mine
100
80
90%
60
40
85%
LOM Revenue $6.1bn
and
20
-
80%
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
Years
LOM pre-tax FCF
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
22
Misima Project History
5
High leverage to the gold price
3
$2,500.00
2
1
2017 - KSN
commences
Misima earn-in
$2,000.00
KSN initiates
sale/JV
process
4
2019 – KSN
completes
100%
ownership
2021
Resource
grows to
3.8Moz
2022
Misima
DFS
5
4
3
Gold Price
2
$1,500.00
1
1988
Commencement of
mining, 4.0Moz AuEq
over 15 years
$1,000.00
2004
Misima
decommissionsed
by Placer Dome
$500.00
$0.00
1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
23
Summary: Focus on executing our clearly defined strategy
Leveraging the existing gold-copper asset base while advancing future growth opportunities
Experienced management team: Focus on maximising
returns from Mineral Hill and Misima
Insert mining picture
Prime Cobar Location: Mineral Hill in heart of Cobar Basin,
rich in copper & gold (clean energy transition)
Excavator/truck
Fast-Track Production Boost: Open pit mining at Pearse to
start Q2'24 (133% YoY metals production increase).
Processing plant expansion in the final stages
Strong Financials & Infrastructure: $13.5m secured for
growth. Tailings retreatment success positions company for
open pit restart
Misima Gold Project: Large scale, long-life, low-cost open pit
gold and silver mine
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
24
Appendix
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
25
Building a safety culture and
establishing our ESG
framework
Investing in our people and
our community
A large employer in
Condobolin
ESG framework: safe,
responsible and sustainable
Investing in our local and
residential workforce
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
26
Mineral Hill – Social Licence
Environmental and Social Licence to operate
• Stakeholder engagement – excellent relationship with landholders, community and Condobolin Chamber of Commerce
• Mining Licences (ML) granted
• Environment protection, cyanide and water permits in place
• Environmental Bonds in place with a staged payment schedule
• Development Applications (DA) approvals in place for tailings
(TSF), Pearse pits, SOZ underground
• Mine Operation Plan (MOP) in place for the tailings
retreatment and re-commencing hard rock mining
• Biodiversity offset in place, potential to increase offset
• Dam Safety NSW site review complete
• Tailings Dam strategy
• TSF1 currently being re-processed, approval will be sought
for re-use as tailings storage on completion
• TSF2 approved, lift 4 and 5 designed providing storage
capacity for 2.5 years
www.kingstonresources.com.au I ASX: KSN
RIU Sydney Conference | May 2024
27
Mineral Hill Mine – Resources and Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources
• Polymetallic underground Mineral Resources
• Additional resource areas to be estimated in CY24 (Parker’s
Hill and Red Terror)
Total Probable Reserve Inventory
Deposit
Kt
Au (g/t)
TSF
437
0.89
Pearse South
140
4.00
84
18
Pearse North
120
3.40
25
13
TOTAL
697
1.9
57
44
www.kingstonresources.com.au I ASX: KSN
Ag (g/t)
Au (Koz)
Ag (Koz)
Total Mineral Resources
Deposit
Kt
Au
(g/t)
Ag
(g/t)
Cu
%
Pb
%
Zn
%
Au
(Koz)
TSF
437
0.89
0
13
Pearse South
204
3.77
70
25
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
34
60
54
456
Pearse North
292
3.18
34
30
318
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
470
TOTAL
8220
1.14
27
1.0%
1.6%
1.1%
302
6693
72
113
81
13
RIU Sydney Conference | May 2024
28
Competent Person Statement
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on and
fairly represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited.
Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in this report of the matters based upon the information in the form and context in which it appears.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly
represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited.
Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in this report of the matters based upon the information in the form and context in which it appears.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
Competent Person’s Statement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward
(BAppSc (Geology)) MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston
Resources Limited. Mr Hayward has sufficient experience in the style of mineralisation and types of deposit under consideration
and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. All
Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004 and are an accurate representation of
the available data and studies for the Mineral Hill Mine. This information has not been updated since to comply with the JORC
Code 2012 on the basis that the information has not materially changed since it was last reported. Work will commence on close
of acquisition by the Company to bring each of the Mineral Resources into line with the JORC Code 2012.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian
Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the inclusion in
this report of the matters based upon the information in the form and context in which it appears.
Deposit
JORC
ASX Announcement
Competent Person
Company
Competent Person’s Statement – Ore Reserve Reported in Accordance with JORC Code – Mineral Hill
Misima
2012
KSN 06/06/2022
John Wyche
AMDAD
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code 2012
with exception of the Parkers Hill Mineral Resource Estimates that have been prepared by a Competent Person in accordance
with the JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the information has
not materially changed since it was last reported. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone Mineral Resource
estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes created by the site survey
department at the time of mining. These wireframes represent the mining activities at these deposits to the best of Kingston’s
knowledge although they are not to be viewed as complete or accurate in their entirety and therefore mining depletion may be
revised when Kingston is able to produce revised determinations on more complete data and verification thereof. Information
pertaining to Mineral Resource Estimates (MRE) and Ore Reserves (OR) in this presentation has been previously released to the
public. The tables on this page indicate the authors of the historical Resources/Reserves and the dates they were initially
published. Kingston is not reporting these estimates as its own with exception of the MRE and OR for the TSF which has not been
reported previously by any other company. The other original reports are available through the ASX website.
TSF
2012
KSN 18/11/2021
Jeremy Peters
Burnt Shirt
Pearse North
2012
KSN 15/03/2023
John Wyche
AMDAD
Pearse South
2012
KSN 15/03/2023
John Wyche
AMDAD
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 15/09/2021
Stuart Hayward
KSN
TSF
2012
KSN 18/11/2021