QUARTERLY ACTIVITIES REPORT
For the period ending 30 June 2023
HIGHLIGHTS
Mineral Hill Gold & Copper Mine, NSW
•
Shares on Issue: 473.15M
Market Cap: A$39.2
Cash:(30 June 2023) A$18.2m
Record Quarterly Production at Mineral Hill – 4,778oz gold sold at average
price of A$2,968/oz with AISC A$1,493/oz delivering $14.4m in sales and
$7.1m in operating cash flow.
•
Outstanding Full Year Group Performance – strong production
performance for FY23, with sales of $44.7m and operating cashflow of
$14.7m.
DIRECTORS &
MANAGEMENT
•
Capital Raising for Mineral Hill Production Expansion – placement of
$5.5m to fund processing plant refurbishment and underground
redevelopment works. Fully underwritten Share Purchase Plan (SPP)
underway to raise an additional $1m.
•
Life of mine plan (LOM) – updated LOM plan includes open pit and
underground mining scheduled out to end of FY27. Total LOM production of
123koz gold equivalent (AuEq) payable. Copper production to commence end
of CY24.
•
Exploration – Surface drilling underway focusing on Pearse North open pit,
Southern Ore Zone (SOZ) and 15 exploration targets identified through IP
geophysics.
CAPITAL STRUCTURE
Mick Wilkes
Non-Executive Chairman
Andrew Corbett
Managing Director & CEO
Stuart Rechner
Non-Executive Director
Tony Wehby
Non-Executive Director
Stuart Hayward
Chief Geologist
Geoff Merrell
GM, Mineral Hill
CORPORATE DETAILS
ASX: KSN
W:kingstonresources.com.au
ABN: 11 060 156 452
E:info@kingstonresources.com.au
A: 202/ 201 Miller Street,
North Sydney, NSW 2060
LinkedIn: Kingston Resources
Limited
Twitter: @KSNResources
www.kingstonresources.com.au
Misima Gold Project, PNG
•
Independent studies for the Environmental and Social Impact Assessment
(ESIA) largely complete, with work advancing on finalising the full ESIA report
for submission.
•
Studies required for the Mining Licence (ML) application nearing completion.
•
Considering various options to advance development.
Corporate
•
Cash balance $18.2m as at 30 June 2023.
•
Second tranche of $5m debt facility drawn for total of $10m.
1
Kingston Managing Director, Andrew Corbett, said:
"I am thrilled to provide an update on Kingston Resources' exceptional performance during the past quarter,
particularly highlighting the achievements and significant progress at the Mineral Hill Mine. This period has
been marked by tremendous growth and development for our company, and I am immensely proud of the
unwavering dedication and hard work exhibited by our team.
Our growth strategy received a significant boost through the successful completion of recent funding initiatives
for production expansion at Mineral Hill. Tranche 1 of the Placement Offer raised $4.5 million and an additional
$1 million will be raised under Tranche 2 upon receiving shareholder approval at the EGM on 14 August 2023.
The Company also launched a $1 million Share Purchase Plan (SPP) to allow shareholders to participate on
the same terms as the institutional placement including a free attaching Option for every two shares subscribed
for.
This injection of capital has allowed us to announce our initial Life of Mine (LOM) plan at Mineral Hill, which
includes open pit and underground mining operations until the end of 2027. It is worth noting that our current
life of mine forecast only utilises 22% of the existing Mineral Resources, underscoring the immense growth
potential that lies ahead. Our well-established infrastructure on surface and underground provides a strong
foundation for our long-term success.
Furthermore, I am excited to announce that we anticipate commencing copper production by the end of CY24.
This significant milestone is set to substantially augment our annual payable production by 69% in FY25, firmly
establishing our position as a prominent gold-copper producer in the region.
The Tailing Project's current gold production has yielded record sales throughout the quarter. The cash flow
from this project has allowed us to focus on delivering quality technical work in preparation for open pit and
underground mining.
Our commitment to expansion and diversification extends beyond Mineral Hill. We continue to seek strategic
opportunities for our Misima Gold Project in PNG which boasts a JORC 2012 Mineral Resource of 3.8Moz Au.
In conclusion, I want to thank our dedicated team and valued shareholders for their unwavering support.
Kingston Resources is primed for continued success, and we remain steadfast in our commitment to unlocking
the full potential of our projects while consistently delivering value to our shareholders.”
Image 1: Arial drone shot of Mineral Hill
www.kingstonresources.com.au
2
MINERAL HILL MINE
Operations
Kingston’s Mineral Hill Gold and Copper Mine in NSW delivered a stellar result this quarter, with record gold
production of 4,944 ounces (oz), a 92% increase on the 2,575oz of gold produced in the corresponding
quarter of 2022. This remarkable performance was achieved at an all-in sustaining cost (AISC) of A$1,493/oz
and an average realised gold price of A$2,968/oz. Mineral Hill's cashflow from operations was $7.1m, marking
a 31.4% increase compared to the previous quarter.
Table 1: June 2023 quarter production summary.
March Quarter
June Quarter
Q on Q change
150,847
149,885
-1%
Average feed grade (g/t)
1.45
1.63
12%
Gold Sales (oz)
4,431
4,777
8%
Silver Sales (oz)
6,928
5,494
-21%
Gold Production (oz)
4,575
4,944
8%
AISC (A$/oz)
$1,543
$1,494
-3%
Sales (A$m)
$12.5
$14.4
15%
Operating cashflow (A$m)
$5.4
$7.1
31.4%
Tonnes processed (t)
On a monthly basis, Mineral Hill maintained high gold output from the Tailings re-processing operation during
April and May. April reached a record of 1,886oz produced and May delivered production of 1,827oz. High
feed grades and processing recoveries were the key contributors to the elevated gold output during the June
quarter. Gold feed grades averaged 1.86g/t, 1.57g/t and 1.46g/t for April, May and June respectively.
Results for the full financial year indicate an impressive performance for Mineral Hill. The Company’s gold
sales reached a total of 16,068oz at an average sales price of A$2,750/oz. Moreover, we maintained a
competitive AISC of A$1,686/oz.
Table 2: FY23 production summary.
FY22 actuals1
FY23 Actuals
Y on Y change
310,906
627,994
102%
Average feed grade (g/t)
0.95
1.36
43%
Gold Sales (oz)
4,656
16,068
245%
Silver Sales (oz)
7,514
16,898
125%
Gold Production (oz)
4,639
16,520
256%
AISC (A$/oz)
2,753
$1,686
-39%
Sales (A$m)
$12.3
$44.7
263%
Operating cashflow (A$m)
-$0.7
$16.9
2,514%
Tonnes processed (t)
1
Kingston completed the Mineral Hill transaction on 16 January 2022, FY22 actuals are from 16 th Jan to 30 June 2022.
www.kingstonresources.com.au
3
Gold Sold (oz)
AISC (A$/oz)
5,000
Gold Sales (oz) and AISC (A$/oz)
4,500
4,000
3,500
3,000
2,500
2,000
1,500
2,079
1,770
1,543
1,494
MarQ FY23
Jun Q FY23
1,000
500
SepQ FY23
DecQ FY23
Figure 1: Quarterly gold and AISC.
Life of Mine Plan Update
Kingston released an updated life of mine (LOM) plan for Mineral Hill during the quarter, which extends the
mining inventory with open pit and underground mining out to FY27. Extensive geological, mining and
financial studies had been completed during the first half of the calendar year to deliver the updated plan.
The plan comprises Ore Reserves for the Tailings Project and Open Pits, as well as a production target for
the underground Mineral Resources at the Southern Ore Zone (SOZ) and Jack’s Hut (see Figure 2).
Figure 2: LOM processing throughput schedule.
Grades are forecast to increase materially from 0.8g/t to 3.3g/t gold equivalent (AuEq2 recovered) between
FY23 and FY25. The polymetallic processing feed from the underground production target is a key factor in
the increase in grade and payable metal. The LOM plan forecasts 123,000oz AuEq payable, with the mine to
produce separate gold, copper, lead and zinc concentrates.
2
Gold equivalent grades are stated in recovered terms. See Metal Equivalents section.
www.kingstonresources.com.au
4
4.0
3.3
Payable Metal (AuEq oz)
30,000
3.5
3.0
25,000
2.5
20,000
2.0
15,000
1.5
1.0
10,000
0.8
1.0
5,000
Mined Grade (recov.) (g/t AuEq)
35,000
0.5
-
0.0
FY23
Gold
FY24
Silver
Copper
Lead
FY25
Zinc
AuEq Grade (recov.)
Figure 3: Ramp up of payable metal production3
Mineral Hill is now one of two processing plants in the Cobar Basin with CIL and base metal concentrate
processing capability. It is worth noting that our current LOM only utilises 22% of the existing 8.9 million
tonnes of Mineral Resources and efforts have already begun to expand the existing resource and explore
within the mining lease for brownfields targets. There is strong potential for extending the underground Mineral
Resources along strike and at depth.
Figure 4: Long section of the underground Mineral Resources and planned stopes.
In conjunction with the LOM plan update, the Company successfully raised $4.5 million under Tranche 1 of
the institutional placement and will raise an additional $1 million under tranche 2 subject to receiving
shareholder approval at the EGM on 14 August 2023.The Company also launched an SPP to raise an
additional $1 million. The funds will be used to refurbish the processing plant, undertake underground
redevelopment works and fund the initial waste stripping of the open pits (see ASX announcements on 27
June, 3 July and 10 July 2023 for more details).
3
See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion
www.kingstonresources.com.au
5
Work commenced on re-establishing access to the underground development at SOZ during the quarter (see
ASX announcement on 7 June 2023). The initial phase of work will prioritise safety checks, along with
reinstating ventilation, power, and pumping systems. In line with these plans, underground drilling is
scheduled for the early part of the December 2023 quarter, which aims to infill and extend the current
underground Mineral Resources at SOZ. Capital expenditure requirements over the LOM are reduced
significantly due to the existing decline development and surface infrastructure.
Exploration
Kingston resumed surface drilling at Mineral Hill during the June quarter (see ASX announcement on 2 & 9
May 2023). Initial drilling focused on the Pearse North open pit area and the upper parts of SOZ, aiming to
collect geotechnical data and infill areas of the Inferred Mineral Resource. On the SOZ drilling specifically,
the aim is to define key geological structures and gather additional geotechnical and orebody knowledge.
Notably, this part of the exploration program is jointly funded by the NSW Government's Critical Minerals and
High-Tech Metals Activation Fund, with Kingston being awarded $500,000 in November 2022.
After the quarter was completed, Kingston announced the identification of 15 new and promising exploration
targets within and near the Mineral Hill Mining Lease (ML) package (see ASX announcement on 19 July
2023). The completion of interpretation and 3D modeling of the 28km Induced Polarization (IP) geophysical
program southeast of the Mineral Hill Mine has provided valuable insights. The analysis has shown that there
are areas within the mining and exploration leases that share a geophysical signature with existing deposits,
including a correlation between gravity and IP.
Figure 5: Recently generated geophysical targets in the vicinity of the mining licences.
The geology team at Mineral Hill have designed a 10-hole program within and immediately around the Mining
Lease to target these anomalous zones. Several of the drill holes have been drilled with a combination drill
rig since the rig arrived on site in early May. Logging and sampling has been completed for a portion of the
www.kingstonresources.com.au
6
holes drilled so far and assay results are pending.
Figure 6: Location of proposed exploration holes within the Mining Lease.
Safety, Environment and Sustainability
There were no reportable environmental or safety incidents during the quarter. The company has new tools
as part of Mineral Hill’s safety management system. These include the development of an intranet for sitewide employees to access Principal Hazard Management Plans, Principal Control Plans, Risk Assessments
and other system document. Incorporated within this network is the ability to manage training, inductions and
monitor ongoing safety related actions.
MISIMA GOLD PROJECT
Kingston has continued to collect and monitor environmental data as part of the ESIA work programs. The
company has been in discussions with interested parties in relation to potential partnerships and development
arrangements.
CORPORATE
Efforts on raising the awareness of Kingston and the company’s strategy took the form of attendance at
industry conferences and participation in student careers events. Additionally, personnel from the company
are actively participating in inclusion and diversity initiatives related to the Women in Mining NSW Mentoring
Program.
Kingston’s Managing Director and CEO, Andrew Corbett, had the opportunity to present at the Mines and
Money conference in Melbourne during June. This platform allowed us to showcase our projects and engage
www.kingstonresources.com.au
7
with industry leaders and investors, further strengthening our position in the market.
The Company’s closing cash balance at 30 June 2023 was $18.2m. The consolidated group cash flow for the
quarter is summarised below:
Net cash from/(used in)
Gross revenue ($m)
14.4
Production cost ($m)
(5.8)
Staff cost ($m)
(1.4)
Administration and corporate cost ($’000)
(264)
Net interest payment ($’000)
(160)
Net cash flow from operating activities($m)
6.84
Exploration and development expenditure ($m)
(1.6)
Net cash flow from investing activities ($m)
(6.8)
Net cash flow from financing activity ($m)
8.7
During the quarter, the Company made payments totaling $153,000 to associates or related parties reflecting
fees, wages, and superannuation paid to Directors. The final installment of its cash backed rehabilitation
security bond of $1.77m was also paid, increasing the total bond to $7.27m. The Company paid the first
deferred consideration of $2.24m (USD$1.5m) to Quintana Holdings LLP upon recovering 15,000 oz of gold
since the acquisition of Mineral Hill Mine on 17 January 2022.
Kingston raised $4.5m under Tranche 1 of the placement offer, the proceeds of which were settled on 3 July
2023. The Company will raise another $1m under Tranche 2 of the placement offer subject to receiving
shareholder approval at the EGM on 14 August 2023. The Company is also undertaking a fully underwritten
Share Purchase Plan to raise $1m. The offer opened on 17 July 2023 and is currently scheduled to close on
10 August 2023.
www.kingstonresources.com.au
8
Table 3: Tenement Schedule (ASX LR 5.3.3) as at end of quarter
Tenement
Status
Ownership
Type
Title Area
EL1747
Misima, PNG
Live
100%
EL
180 km2
EL1999
Mineral Hill, NSW
Live
100%
EL
17 UNITS
EL8334
ML5240
Mineral Hill, NSW
Mineral Hill, NSW
Live
Live
100%
100%
EL
ML
100 UNITS
32.37 HA
ML5267
Mineral Hill, NSW
Live
100%
ML
32.37 HA
ML5278
Mineral Hill, NSW
Live
100%
ML
32.37 HA
ML332
Mineral Hill, NSW
Live
100%
ML
22.36 HA
ML333
Mineral Hill, NSW
Live
100%
ML
28.03 HA
ML334
Mineral Hill, NSW
Live
100%
ML
21.04 HA
ML335
Mineral Hill, NSW
Live
100%
ML
24.79 HA
ML336
Mineral Hill, NSW
Live
100%
ML
23.07 HA
ML337
Mineral Hill, NSW
Live
100%
ML
32.27 HA
ML338
Mineral Hill, NSW
Live
100%
ML
26.3 HA
ML339
Mineral Hill, NSW
Live
100%
ML
25.09 HA
ML340
Mineral Hill, NSW
Live
100%
ML
25.79 HA
ML1695
Mineral Hill, NSW
Live
100%
ML
8.779 HA
ML1712
Mineral Hill, NSW
Live
100%
ML
23.92 HA
ML1778
Mineral Hill, NSW
Live
100%
ML
29.05 HA
ML5499
Mineral Hill, NSW
Live
100%
ML
32.37 HA
ML5621
Mineral Hill, NSW
Live
100%
ML
32.37 HA
ML5632
Mineral Hill, NSW
Live
100%
ML
27.32 HA
ML6329
Mineral Hill, NSW
Live
100%
ML
8.094 HA
ML6365
Mineral Hill, NSW
Live
100%
ML
2.02 HA
www.kingstonresources.com.au
Project Name & Location
9
This release has been authorised by the Kingston Resources Limited Board. For all enquiries, please contact Managing Director,
Andrew Corbett, on +61 2 8021 7492.
Mineral Resources and Ore Reserves
For further information regarding the Misima Mineral Resource and Ore Reserve estimate, see ASX announcements on
24 November 2020 and 15 September 2021 and 6 June 2022. Further information is included within the original
announcements.
The Mineral Hill Mineral Resource estimate outlined below was released in ASX announcements on 18 November 2021
(TSF), 15 March 2023 (Pearse South and Pearse North), 24 November 2022 (Southern Ore Zone), 21 March 2023
(Jack’s Hut) and 13 September 2011(Parkers Hill by KBL). The Ore Reserve estimate outlined below was released in
ASX announcements on 18 November 2021 (TSF), 15 March 2023 (Pearse South and Pearse North). Further information
is included within the original announcements.
All material assumptions and technical parameters underpinning the estimates as they were originally reported continue
to apply and have not materially changed.
Misima JORC 2012 Mineral Resource & Ore Reserve summary table
Resource Category
Indicated
Inferred
Total
Reserve
Probable
Cut-off (g/t Au)
0.3
0.3
0.3
Cut-off (g/t Au)
0.3
Tonnes (Mt)
97.7
71.3
169
Tonnes (Mt)
75.6
Au (g/t)
0.79
0.59
0.71
Ag (g/t)
4.3
3.8
4.1
Au (g/t)
0.79
Ag (g/t)
4.2
Au (Moz)
2.5
1.4
3.8
Au (Moz)
1.73
Ag (Moz)
13.4
8.7
22.1
Ag (Moz)
4.1
Mineral Hill JORC 2012 & JORC 2004 Mineral Resource & Ore Reserve summary table
Resource
Category
Measured
Indicated
Inferred
Total
Reserve
Category
Proved
Probable
Total
Tonnes
(kt)
228
5,582
3,091
8,901
Tonnes
(kt)
1,431
1,431
Au
(g/t)
2.11
1.06
1.17
1.13
Au
(g/t)
0.00
1.55
1.55
Ag
(g/t)
11
28
23
26
Ag
(g/t)
0
57
57
Cu %
1.3%
1.2%
0.7%
1.0%
Pb %
0.5%
1.7%
1.4%
1.6%
Zn %
0.3%
1.1%
1.2%
1.1%
Cu %
Pb %
Zn %
Au
(koz)
15
191
116
323
Au
(koz)
71
71
Ag
(koz)
80
4,244
2,242
6,566
Ag
(koz)
0
470
470
Cu (kt)
3
47
22
72
Pb (kt)
1.2
70
42
113
Zn (kt)
0.7
42
38
81
Cu (kt)
Pb (kt)
Zn (kt)
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled
by Mr. Stuart Hayward BAppSc (Geology) MAIG, a Competent Person who is a member of the Australian Institute of
Geoscientists. Mr. Hayward is an employee of the Company. Mr. Hayward has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr. Hayward confirms that the information in the market announcement provided is an accurate
representation of the available data and studies for the material mining project and consents to the inclusion in this report
of the matters based upon the information in the form and context in which it appears.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy
and who has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche
consents to the inclusion in this report of the information pertaining to the Misima Ore Reserve in the form and context in
which it appears.
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon),
of Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy
and who has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche
consents to the inclusion in this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and
context in which it appears.
www.kingstonresources.com.au
10
Metal Equivalents
This announcement quotes metal equivalent grades for the life of mine plan, Mineral Resources and Ore Reserves. Price
assumptions used are based primarily on consensus forecasts with adjustments based on company expectations. Gold
equivalent (AuEq) conversion factors are used within the announcement and are calculated by dividing price/unit for each
commodity (Cu/t, Au/oz, Ag/oz, Pb/t, Zn/t) and multiplying by the metallurgical recovery. Since the metallurgical recovery
varies according to deposit type, the metal equivalent factors are unique for each deposit (namely, Tailings Project, open
pit and underground).
AuEq g/t = (Cu CAu * Cu %) + (Au CAu * Au g/t) + (Ag CAu * Ag g/t) + (Pb CAu * Pb %) + (Zn CAu * Zn %)
Metallurgical recoveries are based on historical production (2010-2016) as well as recent metallurgical test work and are
applied to the Resource and Reserve calculated grades for each commodity. The Company is of the opinion that all the
elements included in the metal equivalent calculations have a demonstrated potential to be recovered and sold. Mineral
Hill has a CIL circuit, Cu flotation circuit, Pb flotation circuit and Zn flotation circuit to produce three different concentrates
as well as gold dore.
Table 1: Commodity prices, metallurgical recoveries and metal equivalent factors for each deposit.
Commodity
Unit
Price
Deposit
Commodity
Recovery
(%)
Gold
Silver
Copper
Lead
Zinc
US$/oz
US$/oz
US$/lb
US$/lb
US$/lb
1,780
22
4.12
1.15
1.38
Tailings
Gold
Silver
Gold
Silver
Gold
Silver
Copper
Lead
Zinc
60
60
64
69
76
64
81
79
60
www.kingstonresources.com.au
Open Pit
Underground
AuEq
Factor
(CAu)
0.60
0.01
0.64
0.01
0.76
0.01
128.46
35.06
31.98
11