Blue Ocean Precious & Base Metals Conference Presentation
Released
Released
Announcement PDF
Growing a gold
and copper mining
company
February 2024
Andrew Corbett, Managing Director
✓ Mineral Hill delivering growth in gold
and copper production
✓ 3.8Moz Misima Gold Project
Definitive Feasibility Study complete
ASX: KSN
Important notices and disclaimer
Forward Looking Statements
Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects, are
forward looking statements. Such forward looking statements: include, among other things, statements regarding incomplete and uncertain proposals or
targets, production and prices, operating costs and results, capital expenditures, and are or may be based on assumptions and estimates related to future
technical, economic, market, political, social and other conditions; are necessarily based upon a number of estimates and assumptions that, while
considered reasonable by KSN, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and
contingencies; and involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or
anticipated events or results reflected in such forward looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results
or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”, “estimate”,
“may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking statements made in this presentation are
qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements are not guarantees of future performance and
accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty therein.
Disclaimer
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other
person accepts any liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the information
contained in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness,
likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation assumed to update
such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or
other financial products. The information contained in this presentation is not investment or financial product advice and is not intended to be used as the
basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives, financial situation or
particular needs of any particular person. Before making an investment decision, you should consider, with or without the assistance of a financial adviser,
whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances. Past performance is no
guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June 2023,
$6.5m Capital Raising or Mineral Hill Production Expansion.
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
2
Important notices and disclaimer
Exploration by Other Explorers
This presentation contains information sourced from the reports of Other Explorers. References
to the original reports are provided as footnotes where the information is cited in this
presentation. KSN does not vouch for the accuracy of these reports. KSN has taken the decision
to include this information as it is in the public domain and as we assess it to be of relevance to
shareholders and investors.
Underground Production Target
The LOM plan includes Mineral Resource Estimates from the Southern Ore Zone (SOZ) and
Jack’s Hut to estimate the Production Target. All Ore Reserves and Mineral Resources
underpinning this LOM plan have been prepared by Competent Persons in accordance with the
2012 JORC reporting guidelines. Probable Ore Reserve provides 46% of the total LOM
processing plant feed tonnage. The Underground production target is based on Mineral
Resource estimates and comprises Measured (7%), Indicated (31%), Inferred (56%) and
unclassified (6%) material.
There is a low level of confidence associated with Inferred Mineral Resources and there is no
certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of future results or
events and should not be solely relied upon by investors when making investment decisions.
Further evaluation work and appropriate studies are required to establish sufficient confidence
that this target will be met. The Company notes that the Project forecasts a positive financial
performance and is therefore satisfied that the use of Inferred resources in production target
reporting and forecast financial information is not the determining factor in overall Project
viability and that it is reasonable to report the LOM plan with Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the forward-looking
statements included in this announcement. The detailed reasons for that conclusion are outline
throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
3
Mineral Hill
Growth Strategy for
2024 and Beyond
Growth Strategy for 2024
and Beyond
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
4
Mineral Hill: a growth platform
Strong operational performance; well-positioned for continued growth
• Delivery on the plan - Operating cash flow of $24m since
acquiring Mineral Hill January 2022 ($23m total consideration1)
• Resource Growth – Since acquisition resources have grown by
64% to 795koz Aueq
• Discovery potential - Significant progress made on exploration
and development initiatives, highly prospective tenure
• Critical Minerals - NSW Government’s critical grant facilitating
copper production in 2025
• Extending the Life of Mine (LOM), incorporating open pit and
underground mining for an initial + 5 years LOM
• Existing Infrastructure, Approvals and People – The key to
driving value and shareholder upside
1. ASX : Mineral Hill transaction completion 18/1/2022; Acquisition of Mineral Hill Gold and Copper Mine 18/11/2021
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
5
Successful and Profitable Tailings Retreatment Project
Mineral Hill producing gold & silver, generating excellent cash flows
Cumulative Operating Cashflow to 31 December 2023
Tailings Mining as at the end of Q4 2023:
• Processed 1.37mt project to date
• Average grade 1.23 g/t Au, +8.1.% above original
estimates
$24m
22.50M
17.50M
• Recovery up from 46% to 58% since acquisition.
• FY23 gold sales of 16,068oz @ ASIC
$1686/oz628kt
12.50M
7.50M
• Forecast completion extended to August 2024
2.50M
Nov-23
Sep-23
Jul-23
May-23
Mar-23
Jan-23
Nov-22
Sep-22
Jul-22
May-22
Mar-22
-2.50M
Jan-22
The Tailings retreatment project has enabled
KSN to develop our people and provide cashflow
for asset refurbishment and capital growth
projects
1. ASX: Annual Report to Shareholders 14 September 2023
2. Gold equivalent ounces calculated based on consensus commodity prices with adjustments based on company expectations. See Appendix for equivalency calculations
3. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for additional Mineral Hill Resource and Reserve information.
4. ASX : Mineral Hill transaction completion 18/1/2022; Acquisition of Mineral Hill Gold and Copper Mine 18/11/2021
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
6
Mineral Hill – strategic location
Significant organic and regional resource growth opportunities
Abundance of gold-silver and polymetallic Cobar-style
deposits within approved ML’s and within trucking distance
of Mineral Hill processing plant
Wonawinta
Federation
Manuka
Aurelia
Location
516km W of Sydney NSW in Cobar Basin
Ownership
100%: 20 ML’s (4.85km2) and 2 EL’s (335km2)
Reserves (recovered)1,2
53,000 AuEq oz
Resources (recovered)1,2
795,000 AuEq oz (40% Cu, 30% Au)
Orebody
Structure controlled polymetallic vein and
epithermal Au
Mining Methods
Open pit and underground long-hole stoping
Water
Supplied from underground and site storage
Power
Mains with grid upgrade
Historical Production
396koz Au, 33kt Cu (plus Pb, Zn concentrate)
1. Gold equivalent ounces calculated based on consensus commodity prices with adjustments based on company
expectations. See Appendix for equivalency calculations
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for
additional Mineral Hill Resource and Reserve information.
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
7
Extensive existing infrastructure
MH Processing Capacity
Targeting a mine plan beyond 10 years
Float capacity
Production set to increase1 69% in FY25
CIL capacity
800,000
700,000
Phase 3
Regional acquisition
potential to expand the
processing capacity
Phase 1
Complete the Tailings
Project
600,000
500,000
400,000
300,000
Phase 2
Lift production in FY25 ,
commence copper
production1 and extend
the mine life
200,000
100,000
0
Today
The Future
1. ASX : $6.5m Capital Raising and production Expansion 27th June 2023
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
8
Refurbished plant scheduled for Q4 FY2024
Transforming Mineral Hill back to a hard rock mining operation
• Approvals and license to operate in place
• Refurbishment on track and on budget
• All major equipment ordered and contractors
in place
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
9
Underground and open pit mining
Focus on extending 5-year mine life, producing both precious and base metals
Open pit mining
to commence in
Q2 2024
Underground
refurbishment is
well advanced
Calendar Year
2023
Underground
drilling
to commence
in mid 2024
2024
Underground
mining to
commence later
in 2024
2025
2026
2027 +
Tailings mining
Open pit mining
Underground resource drilling
Underground mining
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
10
Mineral Hill – Surface Mining
High-grade gold ore with silver credits
• Two separate open pits at Pearse:
• New pit at Pearse North
• Deepening and cutback of Pearse South
• All permits, management plans and environmental approvals in
place.
• Discovering additional high-grade Au/Ag deposits within the ML
will be a key focus.
• Significant high-grade gold results from Pearse North1
• 39m @ 4.2g/t Au and 37g/t Ag from 37m, including
▪ 3m @ 26.7g/t Au, 27g/t Ag from 38m
• 10m @ 6.0g/t Au, 33g/t Ag from 72m
• 3m @ 5.5g/t Au, 6g/t Ag from 31m
• 11m @ 1.4g/t Au, 8g/t Ag from 136m including:
▪ 4.3m @ 2.4g/t Au, 16g/t Ag from 142m
Pearse North and South pit designs
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
11
Mineral Hill – Underground Mining
Existing decline development minimises capital requirement to access high-grade ore
• Production target1 using the Southern Ore Zone (SOZ) and Jack’s Hut
• Existing decline development reduces capital expenditure
• Access to SOZ underground is complete – pumped out, bolted &
meshed, communication and primary ventilation operating
• Resource update and initial Reserve work underway
• Jack’s Hut is highly prospective with potential to increase Mineral
Resources along the entire Mineral Hill trend
Long section of Mineral Hill looking east
Mineral Resource Estimate for the Southern Ore Zone, November 20222
Underground longitudinal projection looking east – Jack’s Hut and Southern Ore Zone
Tonnes (Mt)
3.80
Au g/t
1.29g/t
Ag g/t
19 g/t
Cu %
0.9%
Pb %
1.6%
Zn %
1.4%
Mineral Hill Trend – 2.2km strike length
www.kingstonresources.com.au I ASX: KSN
1.
2.
See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions.
See ASX Announcement dated 24 November 2023, Mineral Hill Underground Resources increase 114%
Corporate Update February 2024
12
Advanced near mine development plan
Resource expansion strategy and near mine
exploration
• Five priority targets within the ML
Pearse Nth
• Focus on resource expansion and extending the
mine life
1
Southern Ore Zone (SOZ) Extension.
2
South Aurum (Pearse Corridor).
3
Ashes Graben.
4
Parkers Hill East.
5
Bogong Prospect.
EL1999
5
Pearse Sth
4
22
3
GD140
Jack’s Hut
EOZ
Parker Hill
TSF
SOZ
EL1999
1
EL1999
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
13
Southern Ore Zone - underground
Multiple orebodies with significant potential for
extensions and new discoveries
• Near mine exploration with priority to extend the
underground mine life
• KSNDDH017 - A New Discovery at Mineral Hill
• 12.5m @ 3.41% CuEq1
• Near existing underground development
1. See ASX Announcement on 1 November 2023: Near mine discovery at Mineral Hill. CuEq = recovered metal
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
14
Exploration within EL1999
Multiple drill targets to be tested
• Several near mine targets with potential to significantly
expand contained copper and gold.
• Lead is the primary pathfinder element for polymetallic
mineralisation.
• Geochemical anomalies coincident with IP chargeability
anomalies.
MLs
• Broadly aligned with magnetic lineaments and domains.
• Multiple untested targets
IP chargeability
Cyprus Pines Cu geochemistry
Cyprus Pines Pb geochemistry
EL1999
Au+ soil geochemistry
Subtle Pb-Zn-Bi soil geochemistry
Area of interest with multiple overlapping geochemistry & IP signatures
Axis of best in hole RAB geochemistry anomaly
Lithological unit boundary
EL boundary
ML boundary
Road
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
15
Regional
exploration
Broader exploration
strategy within EL8334
• Coincident geophysical
features (gravity and
induced polarisation).
• Highly prospective
geology and regional
scale structures.
• Lead-in-soil anomalies
along trend from
mineralisation
intersected in adjacent
tenements
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
16
Building a safety culture and
establishing our ESG
Framework
Investing in our people and
our community
Kingston is one of the largest
employers in Condobolin
Kingston’s ESG framework helps
us to operate in a safe, responsible
and sustainable way.
Investing in our local and
residential workforce is good for
our business and our local Lachian
Shire community.
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
17
Misima
Gold Project
Corporate Update February 2024
18
Misima – definitive feasibility and ore reserve1
Large scale, long-life, low-cost open pit gold and silver mine
Misima Project
• 600km from Port Moresby
• DFS Complete
• Historically produced 4Moz AuEq over 15 years
• High leverage opportunity on the gold price.
• DFS uses $1,800/oz gold price and 0.7 AUD:USD. Gold
price scenario of $2,000/oz lifts LOM NPV to $1.3bn.
• Work is focussed on finding optimal financing and
development options.
Poured gold
koz
Recovery
160
100%
3.8Moz Gold
22.1Moz Silver
Resource
Resource
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
Production at AISC
A$1,217/oz
140
120
95%
20-year life of mine
100
80
90%
60
40
85%
LOM Revenue $6.1bn
80%
LOM pre-tax FCF
20
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
and
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
19
Summary: Focus on executing our clearly defined strategy
Leveraging the existing gold-copper asset base while advancing future growth opportunities
Experienced management team
focused on maximising returns with the
existing assets
Tailings production to continue to mid 2024, expansion into
open cuts in 2024, underground concentrates in 2025 (gold and
copper)
Current drill program at Mineral Hill focused on near-mine
targets, potential for near term catalysts
Strategic location of the Mineral Hill processing plant
provides options for adding regional inventory
Focused on growing revenue and cashflow from Mineral Hill
and identify options for the advancement of the Misima Gold
Project
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
20
Appendix
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
21
Highly experienced and well-regarded Executive Team
Significant experience across the development life cycle through to production
Mick Wilkes
Andrew Corbett
Tony Wehby
Stuart Rechner
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Mick is a seasoned mining
professional with 35 years’
experience in the industry,
primarily in gold and base
metals. He has specialised in
sustainable project
development, construction, and
operations throughout his
career.
Andrew is a highly experienced
mining engineer with over 25
years in mine management and
financial markets. He has an indepth understanding of mining,
equity markets, business
development and corporate
strategy.
Tony is a highly experienced
board member and chairman,
previously Non-Executive
Chairman of Tellus Resources
Limited and Aurelia Metals
Limited, and a Director of
Harmony Gold (Aust) Pty Ltd.
Stuart is an experienced
company director and geologist
with a background in project
generation and acquisition in
Australia and overseas. Mr
Rechner holds degrees in both
geology and law.
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
22
Corporate snapshot
12 month Share Price Performance
Market Volume('000) RHS
Share price
Market capitalisation
$0.08
$41.3m
1 February 2023
Shares on issue
Warrants & options2
497.9m
98.7m
Close Price (A$) (LHS)
0.14
7000
0.12
6000
0.1
5000
0.08
4000
0.06
3000
0.04
2000
0.02
1000
0
Feb 23
Apr 23
Jun 23
Aug 23
Oct 23
Dec 23
0
Feb 24
Shareholder Structure
exercise price $0.14 & $0.20
Cash
$10.5m
Debt
$10m
● Quintana
● Delphi
● Winchester Investments
● Farjoy
● Other shareholders
13.4%
12.7%
7.1%
6.4%
60.5%
31 December 20231
1. Estimated Cash balance, as at 31 Dec 2023, excludes $7.27m cash backed environmental bond
2. 38m unlisted options @ $0.14, exp 31/7/25, 25m unlisted warrants @ $0.20, exp 07/07/2027, 35.7m unlisted warrants @ $0.14 exp 29/6/2028
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
23
Mineral Hill Mine – Resources and Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources.
• Polymetallic underground Mineral Resources.
• Additional resource areas to be estimated in CY23 (Parker’s
Hill & Red Terror)
Total Probable Reserve Inventory
Deposit
Kt
Au (g/t)
TSF
1,171
1.07
Pearse South
140
4.00
84
18
Pearse North
120
3.40
25
13
1,431
1.6
57
71
TOTAL
www.kingstonresources.com.au I ASX: KSN
Ag (g/t)
Au (Koz)
Ag (Koz)
Total Mineral Resources
Deposit
Kt
Au
(g/t)
Ag
(g/t)
Cu
%
Pb
%
Zn
%
Au
(Koz)
TSF
1,171
1.07
0
40
Pearse South
204
3.77
70
25
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
34
60
54
456
Pearse North
239
2.97
25
23
190
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
470
TOTAL
8,901
1.13
26
1.0%
1.6%
1.1%
323
6,566
72
113
81
40
Corporate Update February 2024
24
Mineral Hill – Social Licence
Environmental and Social Licence to operate
• Stakeholder engagement – excellent relationship with landholders, community and Condobolin Chamber of Commerce
• Mining Licences (ML) granted
• Environment protection, cyanide and water permits in place
• Environmental Bonds in place with a staged payment schedule
• Development Applications (DA) approvals in place for tailings
(TSF), Pearse pits, SOZ underground
• Mine Operation Plan (MOP) in place for the tailings
retreatment, update required before re-commencing hard rock
mining
• Biodiversity offset in place, review underway to increase offset
Dam Safety NSW site review complete
• Tailings Dam strategy
• TSF1 currently being re-processed, approval will be sought
for re-use as tailings storage on completion
• TSF2 approved, lift 4 & 5 designed providing storage
capacity for 2.5 years
www.kingstonresources.com.au I ASX: KSN
Corporate Update February 2024
25
Competent Person Statement
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on and
fairly represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited.
Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in this report of the matters based upon the information in the form and context in which it appears.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly
represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited.
Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in this report of the matters based upon the information in the form and context in which it appears.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
Competent Person’s Statement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward
(BAppSc (Geology)) MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston
Resources Limited. Mr Hayward has sufficient experience in the style of mineralisation and types of deposit under consideration
and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. All
Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004 and are an accurate representation of
the available data and studies for the Mineral Hill Mine. This information has not been updated since to comply with the JORC
Code 2012 on the basis that the information has not materially changed since it was last reported. Work will commence on close
of acquisition by the Company to bring each of the Mineral Resources into line with the JORC Code 2012.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian
Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the inclusion in
this report of the matters based upon the information in the form and context in which it appears.
Deposit
JORC
ASX Announcement
Competent Person
Company
Competent Person’s Statement – Ore Reserve Reported in Accordance with JORC Code – Mineral Hill
Misima
2012
KSN 06/06/2022
John Wyche
AMDAD
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code 2012
with exception of the Parkers Hill Mineral Resource Estimates that have been prepared by a Competent Person in accordance
with the JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the information has
not materially changed since it was last reported. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone Mineral Resource
estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes created by the site survey
department at the time of mining. These wireframes represent the mining activities at these deposits to the best of Kingston’s
knowledge although they are not to be viewed as complete or accurate in their entirety and therefore mining depletion may be
revised when Kingston is able to produce revised determinations on more complete data and verification thereof. Information
pertaining to Mineral Resource Estimates (MRE) and Ore Reserves (OR) in this presentation has been previously released to the
public. The tables on this page indicate the authors of the historical Resources/Reserves and the dates they were initially
published. Kingston is not reporting these estimates as its own with exception of the MRE and OR for the TSF which has not been
reported previously by any other company. The other original reports are available through the ASX website.
TSF
2012
KSN 18/11/2021
Jeremy Peters
Burnt Shirt
Pearse North
2012
KSN 15/03/2023
John Wyche
AMDAD
Pearse South
2012
KSN 15/03/2023
John Wyche
AMDAD
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 15/09/2021
Stuart Hayward
KSN
TSF
2012
KSN 18/11/2021
Troy Lowien
Groundwork Plus
Pearse South
2012
KSN 15/03/2023
Stuart Hayward
KSN
Pearse North
2012
KSN 15/03/2023
Stuart Hayward
KSN
Southern Ore Zone
2012
KSN 24/11/2022
Stuart Hayward
KSN
Jack’s Hut
2012
KSN 21/03/2023
Stuart Hayward
KSN
Parkers Hill
2004
KBL 13/09/2011
Anthony Johnston
KBL
The Competent Person (JORC 2012) for the TSF Ore Reserve is Mr Jeremy Peters (BSc, BEng) a Fellow of the Australasian
Institute of Mining and Metallurgy and Chartered Professional Geologist and Mining Engineer of that organisation. Mr Peters is a
full-time employee of Burnt Shirt Pty Ltd and has sufficient relevant experience to act as Competent Person.
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who
has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the
inclusion in this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and context in which it
appears.
www.kingstonresources.com.au I ASX: KSN
Kingston confirms that it is not aware of any new information or data that materially affects the information included in all ASX
announcements referenced in this release, and that all material assumptions and technical parameters underpinning the
estimates in these announcements continue to apply and have not materially changed.
Ore Reserve
Mineral Resource
Corporate Update February 2024
26
Mine
Share your feedback
Discover