Kingston Resources Limited (ASX: KSN) (‘Kingston’ or ‘the Company’) is pleased to provide an
update on its strategy for a 25,000m drilling program planned for FY27 at Mineral Hill. The
program aims to materially increase the scale of the Mineral Resources, improve geological
confidence and support conversion of Mineral Resources to Ore Reserves. Kingston’s priority
over the next twelve months is to build the resource scale and technical confidence required
to support a longer-life underground operation and potential future production growth.
Highlights
• 25,000m of drilling planned for FY27 – the largest program at Mineral Hill since
the initial resource drill-out by Triako in 1999
• Targeting a material expansion of the Mineral Resources and supporting
conversion to an updated Ore Reserve and a future underground restart
decision.
• Drilling will be completed with the existing underground drill rig and
complemented by a surface drill rig, completing a 6,575m surface program over
October and November.
• Key targets:
▪ Southern Ore Zone (SOZ) – A-Lode extensions to the north
▪ SOZ Footwall Lodes – test potential extensions to existing high-grade
mineralisation
▪ Jack’s Hut – follow up historical high-grade depth extensions
▪ Red Terror – test northern extensions of recent high-grade results
▪ Parker’s Hill East – targeting new discovery within mining lease
▪ Infill drilling at SOZ to upgrade Inferred portions of planned stopes
• Targeted outcomes of the program:
▪ Grow Mineral Resources and support Ore Reserve conversion.
▪ Establish additional ore sources.
▪ Improve geological confidence and support mine planning.
▪ Support potential future mine life and production growth.
KINGSTONRESOURCES.COM.AU | ASX: KSN 2
The program combines underground extension and infill drilling alongside surface
exploration across eight priority target areas. These target areas represent a significant step-
out along trend from existing high-grade resources and new discoveries or extensions at
depth that have not been properly tested to date. Other outcomes being pursued include the
establishment of additional mining fronts and supporting studies to maximise the mine life
and scale of Mineral Hill.
The planned program is for 15,000m of extension drilling and 10,000m of infill drilling.
Managing Director and CEO, Andrew Corbett commented:
“This program is about discovery, scale and conversion. We are targeting growth in the
Mineral Hill Resource base while building the geological confidence and technical
information needed to support conversion of Mineral Resources into Ore Reserves and
a larger, long-life mine plan.
By drilling across multiple established mineralised areas and near-mine targets, we
aim to establish additional mining fronts and provide the mine plan that will extend
the mine life and grow the annual production at Mineral Hill. ”
Mineral Hill Drilling History
Since acquiring Mineral Hill in January 2022, Kingston has made significant progress in
advancing numerous orebodies into production and building the size of the Mineral
Resource base. Figure 1 shows the increase in resource scale over the years and the
corresponding investment in exploration and resource development drilling. The
Company has expanded total Mineral Resources from 5.9Mt to 12.1Mt, while processing
approximately 2Mt of material over the same period.
The planned FY27 drilling program represents the largest annual drilling campaign since
the drilling completed by Triako in 1999 (see Figure 2).
KINGSTONRESOURCES.COM.AU | ASX: KSN 3
Figure 1: Mineral Resource growth and corresponding drilled metres per year at Mineral Hill.
Figure 2: Metres drilled per year at Mineral Hill since 1965, by operator, with Kingston’s planned FY27 program
shown for comparison.
KINGSTONRESOURCES.COM.AU | ASX: KSN 4
FY27 Drilling Strategy
The FY27 program allocates approximately 60% of planned metres to underground extension
and surface extension/exploration drilling, with the remaining 40% allocated to infill drilling.
Extension and exploration drilling will test opportunities to grow the Mineral Resource base
and establish additional potential ore sources. Infill drilling is intended to increase geological
confidence in areas relevant to future mine planning and support subsequent Ore Reserve
conversion work.
Figure 3 shows a map of the planned drill holes in relation to the existing Mineral Resources
at Mineral Hill. The targets being drilled have either been identified from recent drilling or
from historical high-grade intersections.
Figure 3: FY27 planned drilling at Mineral Hill, looking northeast.
UG Infill
UG Extension
Surface
Drilling
Iodide
Jack’s Hut
(extension)
PH East
SOZ Nth SOZ
South
SOZ Upper
A-Lode
SOZ D,E,G,H Infill
SOZ Sth West
Red Terror
KINGSTONRESOURCES.COM.AU | ASX: KSN 5
Table 1: Descriptions of the key drilling targets for FY27.
Target Program Rationale
SOZ Upper A-
Lode
Surface +
UG
Tests eastern and southern extensions of Upper A-Lode
mineralisation intersected by KSNDDH085
SOZ South
(Footwall Lodes)
Surface +
UG
Tests extensions to footwall mineralisation intersected in
KSNDDH017 and KSNDDH019, with the objective of supporting
future Resource growth.
SOZ Southwest UG Sterilisation drilling to test for significant mineralisation near the
proposed decline alignment.
Red Terror UG Tests potential northern and down-dip extensions to Red Terror
mineralisation identified in recent drilling, including
KSNDDH080, towards GD140.
Parker’s Hill East Surface Tests for primary sulphide mineralisation beneath the historical
K5A supergene zinc intersection.
Jack’s Hut West Surface
(RCD)
Four surface holes testing the main Jack’s Hut lode
approximately 200m down-dip of the existing Resource
interpretation.
Iodide Surface
(RCD)
Surface RCD drilling to test whether polymetallic mineralisation
continues at depth.
Bogong Diamond Diamond drilling to test the Bogong target at depth on EL1999,
approximately 2km from the processing plant.
Figure 4: Jack's Hut long section looking west showing the historical intersections in drill holes GD1 and
TMH216, alongside planned surface drilling targeting depth extensions. Refer to the ASX announcement
released on 21 March 2023 (Jack's Hut - Mineral Resource Update) for the related JORC Table 1 disclosure on
Jack’s Hut historical drilling.
TMH216
4.20m @ 4.85% Cu from 405.8m
Jack’s Hut
Planned
Holes
GD1
6.09m @ 0.59% Cu, 1.31g/t Au
Iodide
Planned
Holes
200m
Extension
Target
Zone
KINGSTONRESOURCES.COM.AU | ASX: KSN 6
Figure 5: Mineral Hill long section looking west with the planned drilling for FY27.
Jack’s Hut Depth
Extension Target
PH East
Prospect
Iodide
Red
Terror
SOZ
North
SOZ
South
SOZ
Upper
A-Lode
Pearse
South
Pearse
North
EOZ Pit UG Portals
This release has been authorised by the Kingston Resources Limited Board.
For all enquiries, please contact Managing Director, Andrew Corbett, on +61 2 8021 7492.
KINGSTONRESOURCES.COM.AU | ASX: KSN 7
About Kingston Resources
Kingston is focused on building scale and extending mine life through organic
exploration growth at its Mineral Hill gold and copper mine in NSW.
Mineral Hill is a gold and copper mine located in the Cobar Basin of NSW. The Company’s
aim is to extend the mine’s life through organic growth and consider regional deposits
that could be processed at Mineral Hill’s processing plant.
The Mineral Hill Mineral Resource estimates included in this announcement were
released in ASX announcements on 15 March 2023 (Pearse South), 21 March 2023 (Jack’s
Hut) and 13 November 2025 (Red Terror and Parker’s Hill) and 24 June 2026 (Southern Ore
Zone). The Ore Reserve estimate for the Southern Ore Zone was released in ASX
announcements on 30 September 2024. Further information is included within the
original announcements.
Kingston is not aware of any new information or data that materially affects the
information included in this announcement. All material assumptions and technical
parameters underpinning the Mineral Resource, Ore Reserve and Production Target
estimates continue to apply and have not materially changed.
Mineral Hill Mine, NSW (100%)
• Intensive drilling program to grow resources and
reserves.
• Significant upside: Measured and Indicated Resources
comprise 56% of the 12.1 Mt resource – substantial
opportunity for conversion to Ore Reserves.
• Excellent Infrastructure: Processing plant capable of
producing multiple concentrates and precious metal dorѐ.
• Exploration potential: Exceptional upside within current
Mining Leases (ML) and Exploration Licenses (EL).
• Operations have been suspended since June 2026 and
remain on C&M
KINGSTONRESOURCES.COM.AU | ASX: KSN 8
Mineral Resources and Ore Reserves
Mineral Hill Mineral Resource and Ore Reserve - JORC Reporting (2012 Ed.).
Mineral Deposit
Resource
Category
Tonnes
(kt)
Grade Metal
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 2,418 1.07 0.81 1.69 1.55 19 83 20 41 37 1,477.1
Inferred 3,490 0.96 0.78 0.83 0.86 11 108 27 29 30 1,178.2
Sub-Total 6,538 1.08 0.83 1.13 1.09 14 227 54 74 71 2,889.0
Jack's Hut
Indicated 608 1.53 1.28 0.50 0.38 7 30 8 3 2 133.7
Inferred 1,032 1.09 0.70 1.05 0.76 28 36 7 11 8 917.1
Sub-Total 1,640 1.25 0.91 0.84 0.62 20 66 15 14 10 1,050.8
Red Terror
Indicated 83 0.58 2.02 - - 4 2 2 - - 9.5
Inferred 131 1.38 1.14 - - 2 6 1 - - 10.2
Sub-Total 214 1.07 1.48 - - 3 7 3 - - 19.7
Parker's Hill
Indicated 2,923 0.17 1.04 1.73 0.81 44 16 30 51 24 4,172.0
Inferred 643 0.16 0.69 1.39 0.93 37 3 4 9 6 758.0
Sub-Total 3,566 0.17 0.98 1.67 0.83 43 19 35 60 30 4,930.0
Pearse South
Indicated 77 3.86 - - - 93 10 - - - 231.0
Inferred 36 2.45 - - - 5 3 - - - 5.4
Sub-Total 113 3.41 - - - 65 12 - - - 236.4
Total Mineral
Resources
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 6,109 0.71 0.99 1.57 1.05 30 140 60 95 64 6,023.2
Inferred 5,332 0.91 0.76 0.92 0.83 17 156 40 49 44 2,869.0
Grand
Total
12,071 0.85 0.90 1.23 0.93 23 332 107 147 111 9,126.0
Mineral Deposit
Reserve
Category
Tonnes
(kt)
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone Probable 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
TOTAL 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
1. Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
2. Probable Ore Reserves are derived from Indicated Mineral Resources.
3. The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
4. The Ore Reserves form part of the Mineral Resources.
KINGSTONRESOURCES.COM.AU | ASX: KSN 9
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is
based on information compiled by Mr. Stuart Hayward BAppSc (Geology) MAIG, of 360
Geoscience Pty Ltd, a Competent Person who is a member of the Australian Institute of
Geoscientists. Mr. Hayward has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr. Hayward confirms that the information in the market announcement
provided is an accurate representation of the available data and studies for the material
mining project and consents to the inclusion in this report of the matters based upon the
information in the form and context in which it appears.
The Competent Person signing off on the overall underground SOZ Ore Reserves
Estimate is Mr. Steven Weckert BE ME (Min) CP, of Australian Mine Design and
Development Pty Ltd, who is a Member of the AusIMM and who has sufficient relevant
experience in operations and consulting for underground metalliferous mines. Mr.
Weckert consents to the inclusion in this report of the information pertaining to the
Mineral Hill SOZ Ore Reserve in the form and context in which it appears.
Previously Reported Information
All Mineral Resource and Ore Reserve estimates referred to were previously released to the
ASX: 15 March 2023 (Pearse South), 21 March 2023 (Jack’s Hut), 13 November 2025 (Red Terror
and Parker’s Hill), 24 June 2026 (SOZ Mineral Resource increase). Kingston is not aware of any
new information that materially affects those estimates, and all material assumptions
continue to apply.
Forward-Looking Statements
This announcement contains forward-looking statements regarding the Company’s planned
FY27 drilling program, budget, targets and expected timing of Mineral Resource updates.
These are not guarantees of future performance and are subject to risks and uncertainties
that may cause actual results to differ materially. Historical drilling data for periods prior to
Kingston’s ownership (2022) is compiled from Company records and third-party reports and
is presented for illustrative context only.
Share your feedback
Discover