Extension to SPP closing date
Released
Released
Announcement PDF
ASX/Media Announcement
14 December 2021
Extension of SPP Closing Date
Kingston Resources Limited (ASX: KSN) (Kingston or the Company) advises the Board has resolved to
extend the closing date of the Share Purchase Plan (SPP) as per the timetable lodged with the ASX on 18
November 2021.
Share Purchase Plan
Kingston is pleased to offer existing eligible shareholders the opportunity to participate in a Share Purchase
Plan to raise up to $4,000,000 at the same issue price as the Placement announced to the ASX on 18
November 2021, being $0.20 per share.
The SPP is now scheduled to close at 5:00pm (AEST) on 31 January 2022.
Indicative SPP Timetable*
Event
SPP Record Date
SPP Offer Documents Dispatched
SPP Opening Date
Revised SPP Closing Date
Revised Announcement of results
Revised Issue of New Shares and lodgment of Appendix 2A
Date
17 November 2021
22 November 2021
22 November 2021
31 January 2022
4 February 2022
7 February 2022
*The timetable above is indicative only and may be subject to change. The commencement of trading of new
shares is subject to confirmation from the ASX.
ASX: KSN
Shares on Issue: 357M
Market Cap: A$59M
Cash: A$7.5M (30 September
2021)
201/110 Pacific Hwy,
North Sydney, NSW 2060
+61 2 8021 7492
info@kingstonresources.com.au
www.kingstonresources.com.au
@KSNResources
This release has been authorised by the Kingston Resources Limited Board. For all enquiries please contact Managing
Director, Andrew Corbett, on +61 2 8021 7492.
About Kingston Resources
Kingston Resources is a metals exploration company
which is focused on exploring and developing the worldclass Misima Gold Project in PNG. Misima hosts a JORC
Resource of 3.8Moz Au and an Ore Reserve of 1.35Moz.
Misima was operated as a profitable open pit mine by
Placer Pacific between 1989 and 2001, producing over
3.7Moz before it was closed when the gold price was below
US$300/oz. Kingston has concluded a Pre-Feasibility
Study for Misima and is continuing to advance
development activities. The Misima Project also offers
outstanding potential for additional resource growth
through exploration success targeting extensions and
additions to the current Resource base. Kingston’s interest
in Misima is held through its PNG subsidiary Gallipoli
Exploration (PNG) Limited.
The Misima Mineral Resource and Ore Reserve estimate outlined below was released in an ASX announcement on 24
November 2020 and 15 September 2021. Further information relating to the resource is included within the original
announcement.
Resource Category
Cut-off (g/t Au)
Tonnes (Mt)
Gold Grade (g/t Au)
Silver Grade (g/t Ag)
Au (Moz)
Ag (Moz)
Indicated
0.3
97.7
0.79
4.3
2.5
13.4
Inferred
0.3
71.3
0.59
3.8
1.4
8.7
Total
0.3
169
0.71
4.1
3.8
22.1
Reserve
Cut-off (g/t Au)
Tonnes (Mt)
Gold Grade (g/t Au)
Silver Grade (g/t Ag)
Au (Moz)
Ag (Moz)
Probable
0.3
48.3
0.87
4.2
1.35
6.48
Misima JORC 2012 Mineral Resource & Ore Reserve summary table
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr.
Stuart Hayward BAppSc (Geology) MAIG, a Competent Person who is a member of the Australian Institute of Geoscientists. Mr.
Hayward is an employee of the Company. Mr. Hayward has sufficient experience that is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Hayward confirms
that the information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form and context
in which it appears.
The Competent Person signing off on the overall Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian Mine Design
and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has sufficient relevant
experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the inclusion in this report of the
matters based upon the information in the form and context in which it appears.
Kingston confirms that it is not aware of any new information or data that materially affects the information included in all ASX
announcements referenced in this release, and that all material assumptions and technical parameters underpinning the estimates
in these announcements continue to apply and have not materially changed.
www.kingstonresources.com.au
2
Share your feedback
Discover