Annual Report to Shareholders
Released
Released
Announcement PDF
KINGSTON RESOURCES LIMITED
& its Controlled Entities
KINGSTON RESOURCES LIMITED
ABN 44 009 148 529
Annual Financial Report
For the year ended 30 June 2023
CONTENTS
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Contents
Page No.
Corporate Directory ...................................................................................................................................... 2
Chairman’s Letter ......................................................................................................................................... 3
Directors’ Report .......................................................................................................................................... 4
Lead Auditor’s Independence Declaration ................................................................................................. 29
Consolidated Statement of Financial Position ............................................................................................ 30
Consolidated Statement of Profit or Loss and Other Comprehensive Income ........................................... 31
Consolidated Statement of Changes in Equity ........................................................................................... 32
Consolidated Statement of Cash Flows ...................................................................................................... 33
Notes to the Financial Statements .............................................................................................................. 34
Directors’ Declaration ................................................................................................................................ 60
Independent Auditor’s Report .................................................................................................................... 61
Corporate Governance Statement .............................................................................................................. 66
Additional Information ............................................................................................................................... 67
CORPORATE DIRECTORY
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Corporate Directory
DIRECTORS
Mick Wilkes (B Eng (Hons), MBA, GAICD)
Non-Executive Chairman
Andrew Corbett (B Eng (Mining, Hons), MBA)
Managing Director
Anthony Wehby (MAICD)
Non-Executive Director
Stuart Rechner (BSc, LLB, MAIG, MAusIMM, GAICD)
Non-Executive Director
COMPANY SECRETARY
Robyn Slaughter
REGISTERED OFFICE AND
PRINCIPAL PLACE OF BUSINESS
Suite 202 – 201 Miller Street
North Sydney NSW 2060
AUSTRALIA
Telephone
Email
Website
(02) 8021 7492
info@kingstonresources.com.au
www.kingstonresources.com.au
AUDITORS
Hall Chadwick Chartered Accountants
SHARE REGISTRY
Automic Group
BANKERS
Australia & New Zealand Banking Group Limited
Macquarie Group Limited
Bank of South Pacific
SOLICITORS
Cowell Clarke Commercial Lawyers
Ashurst Australia
STOCK EXCHANGE
Australian Securities Exchange (ASX)
Secondary Listing - Frankfurt Stock Exchange
ASX CODE
KSN
-2-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Chairman’s Letter
To our valued shareholders and other stakeholders
Welcome to the Annual Report for 2023.
It has been a successful year for Kingston marked by the first full year of gold production and cash flow. The
Mineral Hill operation sold over 16koz of gold at an All in Sustaining Cost of under $1700/oz producing strong
operating cash flows of over $15m, underpinning a full year after tax profit for the Company of just under
$10m. This is an outstanding result which exceeded our expectations. As evidenced by these results, the
strength and quality of the people within the business continues to grow and full credit goes to Andrew Corbet
and his team at Mineral Hill.
In addition to the successful delivery of operating targets, the Company completed a feasibility study for the
reopening of open pit and underground mine at Mineral Hill, including the refurbishment of the crusher,
grinding mill and flotation circuits. The study has produced a 5-year mine plan with strong economics, and the
Board approved the project in June this year.
Work has already progressed significantly, with much of it being done in house, building on our philosophy
to self-perform activities as far as is practical to minimise risk and maintain control of the cost outcomes. The
projects and maintenance teams at Mineral Hill have moved quickly to finalise contracts for refurbishment of
the plant, place orders for long leads items, and complete site preparations.
Open pit mining plans for the Pearse deposits have progressed with a short-term mining contract tendered.
Plans for reopening the underground at the Southern Ore Zone (SOZ) have also progressed with
commencement of dewatering, recruitment of mining personnel and purchase of underground mining
equipment.
At Misima having completed a high quality DFS and environmental and social assessments, which highlighted
its economic viability, we are exploring our strategic options to progress the project to development.
Discussions are continuing with interested parties and we will continue to seek value creation for our
shareholders from this fantastic gold project.
I wish to thank all of you for your support and look forward to continuing to grow the Company for all our
stakeholders.
Your sincerely
Mick Wilkes
Non-Executive Chair
14 September 2023
-3-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Directors’ Report
The Directors present their report together with the financial statements of the Consolidated Entity (or
‘Group’), being Kingston Resources Limited (‘Kingston” or the “Company’) and its subsidiaries, for the
financial year ended 30 June 2023 and the independent auditor’s report thereon.
PRINCIPAL ACTIVITIES
The Company is an Australian-based Company listed on the ASX. The principal activity of the Group during
the period was mineral production and exploration.
OPERATING RESULTS AND REVIEW OF OPERATIONS FOR THE YEAR
Operating Results
Kingston reported a statutory after tax profit of $9,787,333 (2022: loss $2,046,430). The increase in the FY23
profit relative to FY22 loss is due to successful operations at Mineral Hill.
Review of Operations
Kingston had its first full year of production from the Mineral Hill operations and was successful in increasing
gold production and cash flow over the term. Other major achievements included:
Gold production of 16,520oz from the Tailings Project at Mineral Hill.
Multiple phases of exploration and geotechnical drilling at deposits within the current mine plan and
near mine targets within the mining lease.
Updates on the Mineral Resource Estimates for the Southern Ore Zone and Jack’s Hut.
Mineral Resource and Ore Reserve Updates for the Pearse open pits.
Completion of IP geophysics to the south of Mineral Hill mining leases and subsequent identification
of 15 high priority targets.
Successful in receiving NSW Government’s Critical Minerals and High-Tech Metals Activation Fund
– Stream 1: Project Activation Studies towards the development of Mineral Hill feasibility study work
totaling $500,000 of which $250,000 was received as at reporting date.
Delivery of the LOM update, incorporating open pit and underground mining out to 2027.
The growth outlook for the Company is now well underpinned through existing gold production at Mineral
Hill, and the work currently underway to establish a plus five-year mine plan beyond the existing tailings
processing operation. This complements the longer-term opportunities offered by the Misima Gold Project.
-4-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Mineral Hill Mine
Kingston had a successful year at Mineral Hill in terms of gold production and cash flow performance. Gold
sales from the Tailings Project were 16,068oz at an average sales price of A$2,750/oz. Cost management was
also a highlight with all-in-sustaining cost (AISC) falling by 39% in FY23 to A$1,686/oz. In comparison to
FY22 gold production and sales increased 256% and 245% respectively.
Table 1: FY23 production results and performance relative to FY22.
FY22 actuals1
FY23 Actuals
Y on Y Δ
310,906
627,994
102%
Average Feed Grade (g/t)
0.95
1.36
43%
Gold Production (oz)
4,639
16,520
256%
Gold Sales (oz)
4,656
16,068
245%
Silver Sales (oz)
7,514
16,898
125%
AISC (A$/oz)
2,753
$1,686
-39%
Sales (A$m)
$12.3
$44.7
263%
Operating Cashflow (A$m)
-$0.7
$16.9
2,514%
Tonnes Processed (t)
1 Kingston completed the Mineral Hill transaction on 16 January 2022, FY22 actuals are from 16 June 2022 to 30 June 2022
Gold Sold (oz)
AISC (A$/oz)
Gold Price A$/oz
5,000
4,500
Gold Sales (oz) and AISC (A$/oz)
4,000
3,500
3,000
2,534
2,770
2,629
2,968
2,500
2,000
2,079
1,770
1,500
1,543
1,494
MarQ FY23
Jun Q FY23
1,000
500
SepQ FY23
DecQ FY23
Figure 1: Quarterly gold sales, AISC and average realised gold price
-5-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Kingston has been completing capital works on Tailings Storage Facility 2 (TSF2) during the year, including
an embankment raise (Lift 4) to build storage capacity for open pit and underground ore processing. Mineral
Hill is well placed in terms of TSF storage capacity for the LOM.
An updated life of mine was released in June 2023, comprising a continuation of the Tailings Project, open pit
mining from the Pearse deposits and then recommencing underground mining at the Southern Ore Zone. The
current life of mine (LOM) for the project is four years, with high potential for extending the underground
resource laterally and at depth.
Open Pit and Underground Forecast
Table 2 shows the open pit mining forecast and Figure 2 shows the designs for the two pits. Open pit mining
at Pearse consists of two pits; Pearse North and Pearse South. Pearse North is a new development while Pearse
South is a deepening and cut-back of the existing pit.
Figure 2: Pit designs for Pearse North and South.
The underground production target utilises the existing development at the Southern Ore Zone and Jack’s Hut
to enable the production of separate copper, lead and zinc concentrates. There is already substantial
underground development in place at the proposed mining areas, and this reduces the required capital
expenditure over the life of mine. The Scoping Study on the LOM was announced on the ASX platform on 29
June 2023.
-6-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Table 2: Mining & processing physicals for open pit mining.
Mining Physicals
Oxide Tonnes
Sulphide Tonnes
Total Ore Tonnes
Gold Grade
Silver Grade
Metal
Gold
Silver
Material Movement
Waste Tonnes
Total Material Movement
Strip Ratio
Processing
Metallurgical Recovery
Recovered Gold
Recovered Silver
Unit
kt
kt
kt
g/t
g/t
Open Pit
7.8
250
258
3.7
58
koz
koz
31
470
kt
kt
W:O
2,674
2,933
10
%
koz
koz
65%
20
322
Mining Physicals
Mining
Development Ore Tonnes
Stope Ore Tonnes
Grades (Dev & Stope)
Gold
Silver
Copper
Lead
Zinc
Metal
Gold
Silver
Copper
Lead
Zinc
Material Movement
Waste Tonnes
Ore Tonnes
Total Material Movement
Lateral Development
Capital Development
Unit
Underground
kt
kt
112
773
g/t
g/t
%
%
%
1.7
18
0.9%
1.6%
1.3%
koz
koz
kt
kt
kt
47
503
8
14
11
kt
kt
kt
309
885
1,194
m
1,509
Operating Development
Total Lateral Development
m
m
6,845
8,354
Table 3: Underground mining physicals.
-7-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Figure 3: Long section at Mineral Hill showing the proposed stopes (blue).
Plant Refurbishment and Underground Re-Entry
Transitioning to open pit and underground ore feed will require refurbishment of the crushing, grinding and
flotation circuits. Refurbishment of these components of the processing plant is already well advanced.
Additionally, the company has been pumping water from the underground decline and reinstating the safety
and services of the development. Underground diamond drilling will commence in the fourth quarter of this
year to infill and extend the underground Mineral Resources and deliver an initial Ore Reserve by June 2024.
Exploration and Development
Kingston’s main focus on exploration drilling during the financial year was on the Pearse gold-silver deposits,
SOZ polymetallic deposits and the Jack’s Hut trend. The primary aim of the drilling was to infill the existing
drilling and provide data for updating the Mineral Resources, Ore Reserves and LOM plan.
The Pearse North drilling confirmed the high-grade tenor of the mineralisation and the results demonstrated
high grade gold and silver starting from surface. Significant results include:
39m @ 4.2g/t Au and 37g/t Ag from 37m from DDH hole 001, including:
o
3m @ 26.7g/t Au, 27g/t Ag from 38m
10m @ 6.0g/t Au and 33g/t Ag from 72m from DDH hole 003
3m @ 5.5g/t Au and 55g/t Ag from 55m from DDH hole 004
4.3m @ 2.4g/t Au and 16g/t Ag from 142m from DDH hole 005
12m @ 3.68g/t Au, 9g/t Ag from 14m from DDH002 including:
o
17m @ 2.7g/t Au, 11g/t Ag from 15m from RC hole 013 including:
o
7m @ 5.69g/t Au, 13g/t Ag from 15m
11m @ 4.0g/t Au, 15g/t Ag from 20m
8m @ 5.6g/t Au, 66g/t Ag from 120m from RC hole 008 including:
o
3m @ 14.2g/t Au, 177g/t Ag from 125m
-8-
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Figure 4: Significant gold – silver intercepts at Pearse North relative to USD$1800 Au Ore Reserve pit design.
Surface drilling was completed into the upper sections of the SOZ during the year. High grade polymetallic
mineralisation was intersected, with extensions being made up-dip from the current mine workings and to the
north. Significant intersections include:
19m @ 1.15% Cu, 5.5% Pb, 5.5% Zn, 0.4g/t Au, 44g/t Ag from 150m in DDH006 including:
o
10m @ 2.12% Cu, 10.3% Pb, 10.4% Zn, 0.5g/t Au, 81g/t Ag from 150m
39m @ 1.1% Cu, 0.7% Pb, 0.8% Zn, 0.93g/t Au, 12g/t Ag from 161m, in DDH011
9.8m @ 4.22g/t Au, 0.7% Cu, 3.2% Pb, 3.2% Zn, 30g/t Ag from 165.5m in DDH012
8.5m @ 0.4% Cu, 4.2% Pb, 4.2% Zn, 1.23g/t Au, 28g/t Ag from 232m in DDH009
7.0m @ 0.7% Cu, 2.9% Pb, 2.6% Zn, 1.31g/t Au, 26g/t Ag from 154m in DDH008
8.1m @ 0.9% Cu, 8.3% Pb, 3.3% Zn, 0.97g/t Au, 60g/t Ag from 157.9m in DDH007
-9-
KINGSTON RESOURCES LIMITED
& its Controlled Entities
120m
75m
DIRECTORS’ REPORT
Figure 5: Plan and section view of Southern Ore zone (MH Mine Grid).
Figure 6: Section view of Southern Ore zone on Section 2
- 10 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
High grade copper-gold assay results were also returned from the maiden Jack’s Hut drilling program at
Mineral Hill. Five drill holes were designed to test the exploration potential within a dilation zone along the
Jack’s Hut trend. The program has delivered near surface, high grade copper intercepts, within a 2.2km
mineralised trend, and in close proximity to our operating mill. Key results included:
77m @ 0.93% Cu, 0.16g/t Au from 7m in KSNDDH014, including:
o
7.4m @ 5.7% Cu, 0.40g/t Au from 16.4m
o
9.3m @ 1.3% Cu, 0.39g/t Au from 43.7m
27m @ 1.02% Cu, 0.18g/t Au from 14m in KSNDDH015, including:
o
4.2m @ 4.5% Cu, 0.41g/t Au from 21.8m
54.5m @ 0.65% Cu, 0.06g/t Au, from 45m in KSNDDH015, including:
o
9.3m @ 2.2% Cu,0.18g/t Au from 63m
10.0m @ 1.56% Cu, 0.76g/t Au, from 37m in KSNRC018, including:
o
6m @ 2.20% Cu, 1.22g/t Au from 37m
Additional drilling at Pearse North and SOZ commenced in April 2023. The primary purpose of the Pearse
North drilling was to collect geotechnical data for open pit wall slope designs. The assay results again
confirmed the high-grade nature of the deposit and also added confidence to the existing geological
interpretation. The intersections concurred with the 3D wireframes shapes of the mineralisation and were
consistent with the grades of previous drill holes.
The earlier drilling results from Pearse, SOZ and Jack’s Hut were then incorporated into updated Mineral
Resource Estimates (MRE) for all three projects. Additionally, an Ore Reserve Estimate was delivered for the
Pearse North and Pearse South deposits. Significantly, the SOZ MRE resulted in a 114% increase in total
tonnage and increases of 54% and 64% in contained gold and copper respectively. The MREs for SOZ and
Jack’s Hut are shown in Table 4 and Table 5.
Table 4: Southern Ore Zone (SOZ) Mineral Resource Estimation for November 2022.
Grade
Metal
Tonnage
Resource Category
(Kt)
Au (g/t) Ag (g/t)
Cu %
Pb %
Zn % Au (koz) Ag (koz) Cu (kt) Pb (kt) Zn (kt)
Measured
228
2.11
10.9
1.3%
0.5%
0.3%
15.5
80
3,000
1,200
700
Indicated
1,622
1.28
19.9
1.0%
1.8%
1.5%
66.8
1,038 16,200 28,500 24,200
Inferred
1,954
1.20
20.0
0.7%
1.6%
1.5%
75.4
1,256 14,500 30,500 28,900
Total
3,804
1.29
19.2
0.9%
1.6%
1.4%
157.6
2,349 33,600 60,200 53,800
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
Table 5: Jack’s Hut Mineral Resource Estimate for March 2023.
Class
Indicated
Inferred
Total
Mass Au g/t
(kt)
608
1.53
1,032
1.09
1,640
1.25
Ag g/t
Grade
Cu %
Pb %
Zn %
7
28
20
1.3%
0.7%
0.9%
0.5%
1.0%
0.8%
0.4%
0.8%
0.6%
Au
koz
30
36
66
Ag
koz
134
917
1,051
Metal
Cu kt
Pb kt
Zn kt
7.8
7.2
15.0
3.0
10.8
13.8
2.3
7.8
10.1
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
- 11 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Kingston undertook a new Induced Polarisation (IP) survey during the year to expand coverage to the southeastern edge of EL1999. This data has enhanced the evidence already provided by gravity geophysics in this
region. The existing mineral deposits at Mineral Hill lie at the intersection of IP chargeability highs and gravity
gradients (i.e. zones of transition from gravity highs to gravity lows). Extending this knowledge to the south
of Mineral Hill has helped to identify 15 additional priority targets (see Figure 7) and drilling of these has
already commenced, with results pending.
Figure 7: Recently generated geophysical targets in the vicinity of the mining licences.
Misima Gold Project
Kingston undertook a strategic review of Misima with a view of to maximising value from the project. The
company has been actively engaged in discussions with numerous groups to find ways to bring the project into
production. Work on site consisted of background environmental monitoring as part of the Environmental and
Social Impact Assessment (ESIA) as well as work to progress the Mining Licence application.
- 12 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
MINERAL RESOURCES TABLE
Mineral Hill (NSW, Australia)
Table 6: Mineral Hill Mineral Resource summary, prepared by Mr S. Hayward of Kingston Resources Ltd. Rounding
errors may occur.
Resource
Category
Tonnes
Au
Ag
Cu
Pb
Zn
Au
Ag
Cu
Pb
Zn
kt
g/t
g/t
%
%
%
koz
koz
kt
kt
kt
Measured
Indicated
Inferred
Total
228
5,582
3,091
8,901
2.11
1.06
1.17
1.13
11
28
23
26
1.3%
1.2%
0.7%
1.0%
0.5%
1.7%
1.4%
1.6%
0.3%
1.1%
1.2%
1.1%
15
191
116
323
80
4,244
2,242
6,566
3
47
22
72
1.2
70
42
113
0.7
42
38
81
Table 7: Mineral Hill Mineral Reserve summary, prepared by Mr J. Wyche of Australian Mine Design and Development
Pty Ltd. Rounding errors may occur.
Reserve
Proved
Probable
Total
Tonnes
Au
Ag
Cu
Pb
Zn
Au
Ag
Cu
Pb
Zn
kt
g/t
g/t
%
%
%
koz
koz
kt
kt
kt
1,431
1,431
1.55
1.55
57
57
71
71
470
470
Misima Gold Project (PNG)
Table 8: Misima Gold Project Mineral Resource summary, prepared by Mr S. Hayward of Kingston Resources Ltd.
Rounding errors may occur.
Deposit
Umuna Total
Resource
Umuna TOTAL
Cooktown Stockpile
Cooktown Stockpile
Ewatinona Total
Resource
Ewatinona TOTAL
Misima
Misima TOTAL
Classificati
on
Indicated
Inferred
Cutoff
g/t Au
0.3
0.3
Inferred
0.5
Indicated
Inferred
0.3
0.3
Indicated
Inferred
Tonnes
Mt
93.5
64.1
157.6
3.8
3.8
4.2
3.4
7.6
97.7
71.3
169
Gold
g/t Au
0.78
0.58
0.70
0.65
0.65
0.88
0.74
0.81
0.79
0.59
0.71
Silver
g/t Ag
4.3
3.8
4.1
7.0
7.0
2.6
3.2
2.8
4.3
3.8
4.1
Au Moz
Ag Moz
2.4
1.2
3.6
0.1
0.1
0.12
0.08
0.2
2.5
1.4
3.8
13.1
7.5
20.5
0.9
0.9
0.3
0.3
0.7
13.4
8.7
22.1
Table 9: Misima Gold Project Ore Reserve summary, prepared by Mr J. Wyche of Australian Mine Design and
Development Pty Ltd. Rounding errors may occur.
Ewatinona
Probable
Ewatinona Total
Umuna
Probable
Umuna Total
Probable
Misima Total Reserve
Tonnes
Mt
Gold
Au g/t
Silver
Ag g/t
Au koz
Ag koz
3.9
3.9
0.8
0.8
2.4
2.4
100
100
300
300
71.7
71.7
75.6
75.6
0.8
0.8
0.8
0.8
4.6
4.6
4.5
4.5
1,800
1,800
1,900
1,900
10,600
10,600
10,900
10,900
- 13 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
COMPETENT PERSON’S STATEMENT
The information in this report that relates to Exploration Results and Mineral Resources is based on
information compiled by Mr. Stuart Hayward BAppSc (Geology) MAIG, a Competent Person who is a
member of the Australian Institute of Geoscientists. Mr. Hayward is an employee of the Company. Mr.
Hayward has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Mr. Hayward consents to the inclusion in this report of the matters based upon the information in the form and
context in which it appears.
The Competent Person signing off on the overall Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and
Metallurgy and who has sufficient relevant experience in operations and consulting for open pit metalliferous
mines. Mr Wyche consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears.
Kingston publicly reports Exploration Results and Mineral Resource estimates in accordance with the ASX
Listing Rules and the requirements and guidelines of the 2012 edition of the Australasian Code for Reporting
Exploration Results, Mineral Resources and Ore Reserves – the JORC Code. Kingston’s governance for public
reporting of Exploration Results and Mineral Resource estimates includes important assurance measures. All
reports are signed-off by appropriate JORC Competent Persons with JORC Code Table 1 Checklists as
required. Exploration Results and Mineral Resource estimates are also peer reviewed (either by Kingston
technical staff or suitably qualified external consultants) before Board approval and ASX release.
FINANCIAL POSITION
At the end of the financial year, the Consolidated Entity had net assets of $76,454,900 (2022: $61,130,177)
and held $18,206,767 in cash (2022: $5,589,673).
On 7 July 2022, the Company secured a two tranche $10m debt facility with PURE asset management. Tranche
1 of $5 million was drawn immediately as a 4-year secured loan facility at an interest rate of 9.90% per annum
with 25,000,000 detached warrant shares at an exercise price of $0.20. An establishment fee of $150,000 was
recognised as a reduction in proceeds.
On 29 June 2023, Tranche 2 of $5million was drawn as a 4-year secured loan facility at an interest rate of
9.90% per annum with 35,714,286 detached warrant shares at an exercise price of $0.14. An establishment fee
of $150,000 was recognised as a reduction in proceeds.
On 27 June 2023, the Company announced its intention to undertake a two Tranche Share Placement offer
raising a total of $5,500,000. On 30 June 2023, advanced placement monies totalling $4,500,000 were received
as Tranche 1 of the Placement offer. On 3 July 2023, 52,941,176 Tranche 1 Placement shares were issued at
$0.085.On 17 August 2023, Tranche 1 of the Placement offer was completed upon issuing 26,245,576 unlisted
attaching options expiring on 31 July 2025 with an exercise price of $0.14 on the basis of one option for every
two Placement Share.
- 14 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
Other than reported above in the Review of Results and Operations, there were no significant changes in the
state of affairs of the Company during the reporting period.
MATTERS SUBSEQUENT TO THE END OF FINANCIAL YEAR
On 31 July 2023, the 4,561,810 LTI performance Options were converted to shares raising $45,618.10 and
2,707,994 unvested LTI performance options expired.
On 14 August 2023 Shareholders approved the grant of up to $300,000 MH Project Goal Performance Options
to Andrew Corbett.
On 17 August 2023, Tranche 1 of the Placement offer was completed upon issuing 26,245,576 unlisted
attaching options expiring on 31 July 2025 with an exercise price of $0.14 on the basis of one option for every
two Placement Share.
Also on 17 August 2023:
-
the Company issued 11,764,705 shares at $0.085 to Quintana Holdings LLP under Tranche 2 of the
Placement offer. These proceeds reduce the final deferred consideration payable to Quintana Holdings
LLP upon producing 30,000ozs since the acquisition of Mineral Hill. In addition 5,882,352 unlisted
attaching options expiring on 31 July 2025 with an exercise price of $0.14 were issued on the basis of one
option for every two Placement Share.
-
the Company issued 11,764,664 shares at $0.085 under a fully underwritten Share Purchase Plan raising
$1,000,000 (before costs). In addition, a total of 5,882,332 unlisted options expiring on 31 July 2025 with
an exercise price of $0.14 was issued on the basis of one option for every two SPP Share.
-
742,826 STI performance rights vested and were converted to shares, and 6,043,019 STI performance
rights lapsed.
-
326,233 service fee options were converted to shares for nil consideration.
-
206,764 shares were issued for nil consideration to an employee as part of their employment contract.
Other than the above, there has been no other matter or circumstance which has arisen since 30 June 2023
that has significantly affected or may significantly affect:
a)
Kingston Resources Limited’s operations in future financial years; or
b)
the results of those operations in future financial years; or
c)
Kingston Resources Limited’s state of affairs in future financial years.
DIVIDENDS OR DISTRIBUTIONS
No dividends were paid during the financial year and the directors do not recommend the payment of a
dividend.
- 15 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
FUTURE DEVELOPMENTS AND EXPECTED RESULTS
The Group will continue its operating activities and evaluation of its mineral projects and undertake generative
work to identify and potentially acquire new resource projects. Due to the nature of the business, the result is
not predictable.
ENVIRONMENTAL REGULATIONS
The mineral tenements granted to the Company pursuant to New South Wales Mining Act 1992 and the Papua
New Guinea Mining Act 1992, are granted subject to various conditions which include standard environmental
requirements. The Company adheres to these conditions and the directors are not aware of any non-compliance
with environmental laws.
INFORMATION ON THE DIRECTORS
The Directors of the Company at any time during or since the end of the financial year are:
Mick Wilkes – Chair (Independent Non-Executive)
Andrew Corbett – Director (Managing)
Anthony Wehby – Director (Independent Non-Executive)
Stuart Rechner - Director (Independent Non-Executive)
Directors have been in office since the start of the financial year to the date of this report unless otherwise
stated.
Mick Wilkes, Non-Executive Chair (B Eng (Hons), MBA, GAICD)
Term of Office
Appointed Non-Executive Chair of Kingston Resources Limited from 1 December
2020; previously Non-Executive Director of Kingston Resources Limited from 6
July 2018 to 1 December 2020.
Skills and Experience:
Mr Wilkes is a mining engineer with over 35 years of broad international experience
with a strong emphasis on operations management and new mine development,
predominantly in precious and base metals across Asia and Australia. He was the
President and CEO of OceanaGold Corporation (ASX:OCG) from 2011 to 2020. In
previous roles he was the Executive General Manager of Operations at OZ Minerals
responsible for the development of the Prominent Hill copper/gold project in South
Australia and General Manager of the Sepon gold/copper project for Oxiana based
in Laos. His earlier experience included 10 years in various project development
roles in Papua New Guinea.
Mr Wilkes was appointed as a Non-Executive Director of Genesis Minerals Ltd in
September 2022. In April 2022 Mr Wilkes was appointed Non-Executive Chair of
Andromeda Metals Ltd (ASX:ADN). Mr Wilkes and was previously Non-Executive
Director of Dacian Gold Ltd (ASX:DCN) from September 2021 then Non-Executive
Chair from March 2022 to July 2022. He was also a Non-Executive Director of
Matador Mining Ltd (ASX:MZZ) from July 2020 to May 2022.
- 16 -
DIRECTORS’ REPORT
KINGSTON RESOURCES LIMITED
& its Controlled Entities
Mr Wilkes holds a Bachelor of Engineering from the University of Queensland, a
Master of Business Administration from Deakin University, and is a member of both
the Australian Institute of Mining and Metallurgy, and the Australian Institute of
Company Directors.
Andrew Corbett, Managing Director (B Eng (Mining, Hons), MBA)
Term of Office:
Managing Director of Kingston Resources Limited since 4 July 2016.
Skills and Experience:
Mr Corbett is Managing Director and CEO of the Company. Mr Corbett is a highly
experienced mining engineer, having operated in the mining
Share your feedback
Discover