Investor Presentation - Noosa Mining Conference
Released
Released
Announcement PDF
Noosa Mining
Conference
Commencement of
Open Pit Mining
July 2024
Important notices and disclaimer
Forward Looking Statements
Mineral Hill Gold Bar
Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects,
are forward looking statements. Such forward looking statements: include, among other things, statements regarding incomplete and uncertain
proposals or targets, production and prices, operating costs and results, capital expenditures, and are or may be based on assumptions and estimates
related to future technical, economic, market, political, social and other conditions; are necessarily based upon a number of estimates and assumptions
that, while considered reasonable by KSN, are inherently subject to significant technical, business, economic, competitive, political and social
uncertainties and contingencies; and involve known and unknown risks and uncertainties that could cause actual events or results to differ materially
from estimated or anticipated events or results reflected in such forward looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or
results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”,
“estimate”, “may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking statements made in this
presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements are not guarantees of
future performance and accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty
therein.
Disclaimer
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other
person accepts any liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the
information contained in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or
correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation
assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue,
securities or other financial products. The information contained in this presentation is not investment or financial product advice and is not intended
to be used as the basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives,
financial situation or particular needs of any particular person. Before making an investment decision, you should consider, with or without the
assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial
circumstances. Past performance is no guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June
2023, $6.5m Capital Raising or Mineral Hill Production Expansion.
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
2
Important notices and disclaimer
Exploration by Other Explorers
This presentation contains information sourced from the reports of Other Explorers.
References to the original reports are provided as footnotes where the information is cited
in this presentation. KSN does not vouch for the accuracy of these reports. KSN has taken
the decision to include this information as it is in the public domain and as we assess it to be
of relevance to shareholders and investors.
Underground Production Target
The LOM plan includes Mineral Resource Estimates from the Southern Ore Zone (SOZ) and
Jack’s Hut to estimate the Production Target. All Ore Reserves and Mineral Resources
underpinning this LOM plan have been prepared by Competent Persons in accordance with
the 2012 JORC reporting guidelines. Probable Ore Reserve provides 46% of the total LOM
processing plant feed tonnage. The Underground production target is based on Mineral
Resource estimates and comprises Measured (7%), Indicated (31%), Inferred (56%) and
unclassified (6%) material.
There is a low level of confidence associated with Inferred Mineral Resources and there is
no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of future
results or events and should not be solely relied upon by investors when making investment
decisions. Further evaluation work and appropriate studies are required to establish
sufficient confidence that this target will be met. The Company notes that the Project
forecasts a positive financial performance and is therefore satisfied that the use of Inferred
resources in production target reporting and forecast financial information is not the
determining factor in overall Project viability and that it is reasonable to report the LOM
plan with Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the forwardlooking statements included in this announcement. The detailed reasons for that
conclusion are outline throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
3
Kingston Resources: Investment highlights
Mining Commenced: First blast at Pearse open pits,
high-grade gold/silver production in FY25.
Processing Plant Expansion: Crushing starts July 2024,
internal expansion studies underway.
Strategic Advantage: Owns key polymetallic plant in
Cobar Basin and Misima Gold Project potential.
Growth: Increasing gold production from open pit
mining and copper from underground mining.
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions
2. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
4
Corporate snapshot
3-Year Share Price Performance
Shares on issue
707m
Warrants & options2,3
98.7m
Share price @ 15 July 2024
$0.08
0.3
Market cap @ 15 July 2024
$56m
0.2
Cash @ 8 April 20241
$10.7m
0.1
Restricted cash for environmental bond
$7.3m
0
Debt ($5m mature 7 July 2026, $5m matures 29 June 2027)
$10m
Market Volume('000) RHS
Close Price (A$) (LHS)
8000
6000
4000
2000
0
Shareholder Structure
Delphi 15%
Quintana 9.4%
Winchester 9.1%
Farjoy 6.7%
Other 59.8%
1. Estimated Cash balance, as at 8 April 2024, excludes $7.27m cash backed environmental bond
2. 38m unlisted options @ $0.14, exp 31 July 25,
3. 25m unlisted warrants @ $0.20, exp 07 July 2027, 35.7m unlisted warrants @ $0.14 exp 29 June 2028. Exercise price of the warrants to be repriced post capital raise
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
5
Strategic regional setting for foundational base metals1
• Strategic advantage of ownership of flexible processing
capacity and 8.9Mt of polymetallic resources
• Clear path to underground mining sees increasing levels
of copper and zinc production
Zinc
Lead
Gold
Silver
FY24
FY27
Copper
Silver
Gold
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
6
Mineral Hill
Growth strategy for
2024 and beyond
Growth Strategy for 2024
and Beyond
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
7
Extensive existing infrastructure
Targeting a mine plan beyond 10 years
Production set to increase with
open pit mining in FY25
Mineral Hill Processing Capacity
700 ktpa
350 ktpa
Open pit mining
High grade gold and
silver production
Resource growth
Regional acquisition
and organic growth
Today
Float capacity
The Future
CIL capacity
Underground mining
Further resource
drilling in DecQ 2024
Finalise ore reserve
and life of mine plan
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions.
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
8
Plant refurbishment on track and open pit mining ramping up
Increasing gold and silver production with high grade open pits
Ramping up
production:
Plant
refurbishment
on budget with
oxide ore
commissioning
in July.
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
9
Underground and open pit mining
Focus on extending 5-year mine life, producing both precious and base metals
Open pit mining
underway
Underground
access
established
Calendar Year
2023
Underground
drilling
to commence
in Q4 2024
2024
Underground
mining to
commence in
2025
2025
2026
2027 +
Tailings Project
Open pit mining (Pearse)
Underground resource drilling
Underground mining
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
10
Pearse open pit mining: Updated MRE
Significantly larger gold deposit
• Updated Pearse North MRE, with gold and silver increasing
from the previous estimate 30% and 67% respectively
• Both pits contain high grade gold and silver
• All permits and approvals in place
Table 1 Pearse North Mineral Resource Estimate1 at 1.0g/t Au Cut Off
Classification
Total
Tonnes
kt
Grade
Au g/t
Grade
Ag g/t
Metal
Au koz
Metal
Ag koz
292
3.2
33.9
30
318
Table 2 Pearse South Mineral Resource Estimate2 at 1.0g/t Au Cut Off
Classification
Total
Tonnes
kt
Grade
Au g/t
Grade
Ag g/t
Metal
Au koz
Metal
Ag koz
204
3.8
69
25
457
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
1. See ASX Announcement dated 14/5/2024
2. See ASX Announcement dated 15/3/2023
www.kingstonresources.com.au I ASX: KSN
Pearse North and South pit designs
Noosa Mining Conference | July 2024
11
Upside opportunities
Resource expansion strategy and near mine exploration
EOZ high
grade Au
target
• Mineralisation
over 2.5km
GD140
target
Parkers Hill
MRE update and
extensions
• Multiple ore
bodies
Red Terror
target
• Existing
development in
place
SOZ MRE1
update
Jacks Hut
Infill & Extension
New Lode
Extension
Mineral Resource Estimate for the Southern Ore Zone, November 20222
Tonnes (Mt)
Au g/t
Ag g/t
Cu %
Pb %
Zn %
3.80
1.29 g/t
19 g/t
0.9%
1.6%
1.4%
Mineral Resource Estimate for the Jack’s Hut, 21 March 20232
Tonnes (Mt)
Au g/t
Ag g/t
Cu %
Pb %
Zn %
1.60
1.25 g/t
20 g/t
0.9%
0.8%
0.6%
G-H Lode Infill
1. MRE – Mineral Resource Estimate
2. See ASX Announcement dated 24 November 2023 and 21 March 2023 for MRE announcements
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
12
SOZ underground – infill drilling
Infill drilling expands high-grade copper
• New Discovery at Mineral Hill1
• New lode intersected in the footwall (New
Structure #2)
Existing
Mineral
Resource
Zone
• 12.5m @ 3.41% CuEq2 (KSNDDH017)
• Infill drilling confirms main underground lode
over 400m strike3:
• 3m @ 8.13% CuEq (KSNDDH020)
Potential
Mineral
Resource
Expansion
Zone
• 3m @ 6.18% CuEq (KSNDDH022)
• 10.2m @ 2.73% CuEq (KSNDDH023)
1. See ASX Announcement on 1 November 2023: Near mine discovery at Mineral Hill.
2. CuEq = see the slide on Metal Equivalents
3. See ASX Announcement on 9 April 2024 - Southern Ore Zone Confirmed over 400m Strike
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
13
Advanced near mine development
plan
on EL8334
4
5
EL1999
Resource expansion strategy and near mine
exploration
• Five priority targets within the ML and regionally
• Focus on resource expansion and extending the
mine life
2.5km
3
1
SOZ infill & extension drilling
2
Parkers Hill – GD140 resource updates
3
Jacks Hut and EOZ extensions
4
Bogong target – drilling
5
Webers Gossan and Long Panel – regional exploration
www.kingstonresources.com.au I ASX: KSN
2
EL1999
1
EL1999
Noosa Mining Conference | July 2024
14
Exploration tenure
Multiple drill targets, geochemical anomalies and geophysical anomalies
• Several near-mine copper and gold
targets in EL1999
• Multiple untested targets
• Highly prospective geology and
regional scale structures in EL8334
• Extensive lead-in-soil anomalies.
Federation discovered with this tool
• Coincident geochemical, gravity and IP
chargeability anomalies
• Broadly aligned with magnetic
lineaments and domains
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
15
Misima
Gold Project
Noosa Mining Conference | July 2024
16
Misima – definitive feasibility and ore reserve1
Large scale, long-life, low-cost open pit gold and silver mine
• Large, low-cost 20-year gold project with A$956m1
NPV at a gold price US$1,800/oz.
• DFS uses $1,800/oz gold price and 0.7 AUD:USD. Gold
price scenario of $2,000/oz lifts LOM NPV to $1.3bn
Misima Project
• 600km from Port Moresby
• DFS Complete
• Historically produced 4Moz AuEq over 15 years
3.8Moz Gold
22.1Moz Silver
Resource
Resource
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
• Kingston is running a process to bring about value
realisation through a sale or JV
Poured gold
koz
Recovery
160
100%
140
120
95%
Production at AISC
A$1,217/oz
20-year life of mine
100
80
90%
60
40
85%
20
-
80%
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
Years
LOM Revenue $6.1bn
and
LOM pre-tax FCF
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
17
Misima Project history
5
High leverage to the gold price
4
Gold Price
3
$2,500.00
2
1
2017 - KSN
commences
Misima earn-in
$2,000.00
2019 – KSN
completes
100%
ownership
2021
Resource
grows to
3.8Moz
KSN initiates
sale/JV
process
2022
Misima
DFS
5
4
3
2
$1,500.00
1
1988
Commencement of
mining, 4.0Moz AuEq
over 15 years
$1,000.00
2004
Misima
decommissionsed
by Placer Dome
$500.00
$0.00
1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
18
Summary: Focus on executing our clearly defined strategy
Leveraging the existing gold-copper asset base while advancing future growth opportunities
Experienced Management Team: Focus on maximising
returns from Mineral Hill and Misima
Insert mining picture
Prime Cobar Location: Mineral Hill in the heart of Cobar
Basin, rich in copper & gold (clean energy transition)
Excavator/truck
Fast-Track Production Boost: Expanding production from
open pit mining and moving into underground mining
Strategic advantage: Fully approved and operating
processing plant with multiple growth options
Misima Gold Project: Large scale, long-life, low-cost open pit
gold and silver mine
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
19
Appendix
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
20
Highly experienced and well-regarded Executive Team
Significant experience across the development life cycle through to production
Mick Wilkes
Andrew Corbett
Tony Wehby
Stuart Rechner
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Mick is a seasoned mining
professional with 35 years’
experience in the industry,
primarily in gold and base
metals. He has specialised in
sustainable project
development, construction, and
operations throughout his
career.
Andrew is a highly experienced
mining engineer with over 25
years in mine management and
financial markets. He has an indepth understanding of mining,
equity markets, business
development and corporate
strategy.
Tony is a highly experienced
board member and chairman,
previously Non-Executive
Chairman of Tellus Resources
Limited and Aurelia Metals
Limited, and a Director of
Harmony Gold (Aust) Pty Ltd.
Stuart is an experienced
company director and geologist
with a background in project
generation and acquisition in
Australia and overseas. Mr
Rechner holds degrees in both
geology and law.
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
21
Building a safe and
sustainable culture
Investing in our people and
our community
A large employer in
Condobolin
ESG framework: safe,
responsible and sustainable
Investing in our local and
residential workforce
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
22
Mineral Hill – Social License
Environmental and Social Licence to operate
• Permits in place for
mining and processing
• Environmental bonds
secured
• Tailings strategy defined
• Biodiversity offset
established
www.kingstonresources.com.au I ASX: KSN
Noosa Mining Conference | July 2024
23
Mineral Hill Mine – Resources and Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources
• Polymetallic underground Mineral Resources
• Additional resource areas to be estimated in CY24 (Parker’s
Hill and Red Terror)
Total Probable Reserve Inventory
Deposit
Kt
Au (g/t)
TSF
437
0.89
Pearse South
140
4.00
84
18
Pearse North
120
3.40
25
13
TOTAL
697
1.9
57
44
www.kingstonresources.com.au I ASX: KSN
Ag (g/t)
Au (Koz)
Ag (Koz)
Total Mineral Resources
Deposit
Kt
Au
(g/t)
Ag
(g/t)
Cu
%
Pb
%
Zn
%
Au
(Koz)
TSF
437
0.89
0
13
Pearse South
204
3.77
70
25
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
34
60
54
456
Pearse North
292
3.18
34
30
318
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
470
TOTAL
8220
1.14
27
1.0%
1.6%
1.1%
302
6693
72
113
81
13
Noosa Mining Conference | July 2024
24
Competent Person Statement
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on and
fairly represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited.
Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in this report of the matters based upon the information in the form and context in which it appears.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly
represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited.
Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in this report of the matters based upon the information in the form and context in which it appears.
The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original report.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
Competent Person’s Statement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward
(BAppSc (Geology)) MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston
Resources Limited. Mr Hayward has sufficient experience in the style of mineralisation and types of deposit under consideration
and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the information in the market
announcement provided is an accurate representation of the available data and studies for the material mining project and
consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. All
Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004 and are an accurate representation of
the available data and studies for the Mineral Hill Mine. This information has not been updated since to comply with the JORC
Code 2012 on the basis that the information has not materially changed since it was last reported. Work will commence on close
of acquisition by the Company to bring each of the Mineral Resources into line with the JORC Code 2012.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian
Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the inclusion in
this report of the matters based upon the information in the form and context in which it appears.
Deposit
JORC
ASX Announcement
Competent Person
Company
Competent Person’s Statement – Ore Reserve Reported in Accordance with JORC Code – Mineral Hill
Misima
2012
KSN 06/06/2022
John Wyche
AMDAD
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code 2012
with exception of the Parkers Hill Mineral Resource Estimates that have been prepared by a Competent Person in accordance
with the JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the information has
not materially changed since it was last reported. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone Mineral Resource
estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes created by the site survey
department at the time of mining. These wireframes represent the mining activities at these deposits to the best of Kingston’s
knowledge although they are not to be viewed as complete or accurate in their entirety and therefore mining depletion may be
revised when Kingston is able to produce revised determinations on more complete data and verification thereof. Information
pertaining to Mineral Resource Estimates (MRE) and Ore Reserves (OR) in this presentation has been previously released to the
public. The tables on this page indicate the authors of the historical Resources/Reserves and the dates they were initially
published. Kingston is not reporting these estimates as its own with exception of the MRE and OR for the TSF which has not been
reported previously by any other company. The other original reports are available through the ASX website.
TSF
2012
KSN 18/11/2021
Jeremy Peters
Burnt Shirt
Pearse North
2012
KSN 15/03/2023
John Wyche
AMDAD
Pearse South
2012
KSN 15/03/2023
John Wyche
AMDAD
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 15/09/2021
Stuart Hayward
KSN
TSF
2012
KSN 18/11/2021
Stuart Hayward
KSN
Pearse South
2012
KSN 15/03/2023
Stuart Hayward
KSN
Pearse North
2012
KSN 7/05/2024
Stuart Hayward
KSN
Southern Ore Zone
2012
KSN 24/11/2022
Stuart Hayward
KSN
Jack’s Hut
2012
KSN 21/03/2023
Stuart Hayward
KSN
Parkers Hill
2004
KBL 13/09/2011
Anthony Johnston
KBL
The Competent Person (JORC 2012) for the TSF Ore Reserve is Mr Jeremy Peters (BSc, BEng) a Fellow of the Australasian
Institute of Mining and Metallurgy and Chartered Professional Geologist and Mining Engineer of that organisation. Mr Peters is a
full-time employee of Burnt Shirt Pty Ltd and has sufficient relevant experience to act as Competent Person.
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who
has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the
inclusion in this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and context in which it
appears.
www.kingstonresources.com.au I ASX: KSN
Kingston confirms that it is not aware of any new information or data that materially affects the information included in all ASX
announcements referenced in this release, and that all material assumptions and technical parameters underpinning the
estimates in these announcements continue to apply and have not materially changed.
Ore Reserve
Mineral Resource
Noosa Mining Conference | July 2024
25
Mineral Hill – resources & reserves
Attractive commodity base with significant growth potential
Total Probable Reserve Inventory
Measured Resource Inventory
Deposit
Au
(g/t)
Kt
Ag
(g/t)
Au
(Koz)
18
Ag
(Koz)
TSF
437
0.89
Pearse South
140
4.00
84
13
Pearse North
120
3.40
25
13
95
TOTAL
697
1.9
57
44
470
375
Total Mineral Resources
Deposit
TSF
Pearse South
•
•
•
•
•
Kt
437
204
Au
(g/t)
0.89
Ag
(g/t)
Cu
%
Pb
%
Zn
%
0
3.77
70
Au
(Koz)
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
25
456
Pearse North
292
3.18
34
30
318
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
TOTAL
8,220
1.14
27
1.0%
1.6%
1.1%
302
6,693
72
34
Cu
%
Pb
%
Southern Ore Zone
228
2.11
11
1.3%
0.5%
TOTAL
228
2.11
11
1.3%
0.5%
Zn
%
Au
(Koz)
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
0.3%
15
79.9
3
1
1
0.3%
15
80
3
1
1
24
Indicated Resource Inventory
TSF
437
0.89
Pearse South
164
4.10
85
22
13
Pearse North
270
3.20
34
28
297
1,622
1.28
20
1.0%
1.8%
1.5%
67
1,038
16
29
Jack's Hut
608
1.53
7
1.3%
0.5%
0.4%
30
134
8
3
2
Parkers Hill
1,793
0.191
42
1.3%
2.1%
0.9%
11
2,443
23
38
16
TOTAL
4,893
1.08
30
1.2%
1.7%
1.1%
169
4,361
47
70
42
450
60
54
15
14
10
Inferred Resource Inventory
23
39
17
Pearse South
40
2
5
3
6
113
81
Pearse North
22
2.92
29
2
21
Southern Ore Zone
1,954
1.20
20
0.7%
1.6%
1.5%
75
1,231
14
30
29
Jack's Hut
1,032
1.09
28
0.7%
1.0%
0.8%
36
917
7
11
8
Parkers Hill
50
0.20
48
0.7%
1.8%
2.4%
0.3
77
0.4
1
1
3,098
1.17
23
0.7%
1.4%
1.2%
117
2,253
22
42
38
Noosa Mining Conference | July 2024
26
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code 2012 with exception of the Parkers
Hill Mineral Resource Estimate, which been prepared by a Competent Person in accordance with the JORC Code 2004 and have not been updated to comply with
the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. Pearse South, Parkers Hill and the Southern Ore Zone
Mineral Resource estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes created by the site survey department at
the time of mining. These wireframes represent the mining activities at these deposits to the best of Kingston’s knowledge although they are not to be viewed as
complete or accurate in their entirety and therefore mining depletion may be revised when Kingston is able to produce revised determinations on more complete
data and verification thereof.
Mineral Resources are reported inclusive of Ore Reserves.
See Competent Person details and year of original release on slide 33.
For full information of Mineral Resource and Ore