Jack’s Hut Resource Drilling Results
Key Highlights:
• Excellent infill drilling results at Jack’s Hut confirms the existing
geological interpretation
• Results will inform a Mineral Resource update, targeting an additional
ore source for the Ore Reserve update.
• Surface drilling in October will test depth extensions below the existing
Jack’s Hut Mineral Resource.
KSNDDH091
13.00m @ 2.80% Pb, 2.48% Zn, 0.76% Cu, 0.88g/t Au, 16g/t Ag (2.9% CuEq) from 165.0m
KSNDDH092
5.00m @ 2.00% Cu, 0.15g/t Au, 16g/t Ag (2.7% CuEq) from 93.0m
29.10m @ 1.16% Pb, 0.49% Zn, 0.43% Cu, 0.70g/t Au (1.6% CuEq) from 142.8m, including:
• 4.00m @ 0.30% Cu, 1.83g/t Au (2.5% CuEq) from 145.0m
• 4.85m @ 4.59% Pb, 1.90% Zn, 1.51% Cu, 1.07g/t Au, 23g/t Ag (4.2% CuEq) from 167.0m
KSNDDH093
9.30m @ 3.08% Pb, 3.62% Zn, 0.97% Cu, 0.71g/t Au, 15g/t Ag (3.2% CuEq) from 180.1m
KSNDDH094
13.00m @ 0.91% Cu, 1.04g/t Au, 4g/t Ag (2.2% CuEq) from 106.0m, including:
• 2.05m @ 2.39% Cu, 5.44g/t Au, 8g/t Ag (8.7% CuEq) from 113.0m
KSNDDH096
2.45m @ 4.94% Pb, 2.47% Zn, 19g/t Ag (2.0% CuEq) from 141.6m
KSNDDH097
15.00m @ 2.59% Pb, 1.93% Zn, 14g/t Ag (2.5% CuEq) from 128.0m , including:
• 3.50m @ 5.26% Pb, 3.33% Zn, 27g/t Ag (3.0% CuEq) from 128.0m
KSNDDH098
14.50m @ 3.02% Pb, 0.83% Zn, 16g/t Ag (2.4% CuEq) from 137.0m
Kingston Resources Limited (ASX: KSN) (‘Kingston’ or ‘The Company’) is pleased to report
results from infill drilling at the Jack’s Hut deposit, immediately south of existing
underground development at Mineral Hill. The drilling was designed to increase drill
density and confirm the existing geological interpretation in areas being evaluated for
potential future underground mining.
8 September 2026
2
KINGSTONRESOURCES.COM.AU | ASX: KSN
The results summarised in Table 1 support the existing geological interpretation and
provide additional confidence in the location, continuity and grade tenor of
mineralisation around the conceptual stope areas targeted by the program.
Managing Director and CEO, Andrew Corbett commented:
“We are aiming to make Jack’s Hut our second underground ore source at Mineral Hill.
These results confirm the location of the mineralisation where we expected it and give
us greater confidence in the existing conceptual stopes. We will now incorporate the
drilling results into an updated resource model and mine-planning work.
The surface drilling we are about to undertake is very exciting! The holes are a large step
out from the existing resource and will test the potential down dip extensions. We see
an opportunity to test Jack’s Hut for extensions at depth and along strike. Jack’s Hut has
its own underground portal and decline, separate from the Southern Ore Zone and we
see this as a significant operational benefit and something that could support an
expansion in production.”
Table 1: Selected significant intersections from Jack’s Hut infill drilling.
The full list of significant intercepts is included in the section titled “Drill Hole Collars and Significant Assays.”.
Hole ID
Cutoff
(%)
From
(m)
To (m)
Length
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
CuEq
(%)
KSNDDH091 0.5 159.00 178.00 19.00 0.65 11 0.56 2.05 1.79 2.14
Including 1.0 165.00 178.00 13.00 0.88 16 0.76 2.80 2.48 2.92
KSNDDH092 0.5 93.00 98.00 5.00 0.15 16 2.00 0.41 1.01 2.71
KSNDDH092 0.5 142.75 171.85 29.10 0.70 7 0.43 1.16 0.49 1.61
Including 1.0 145.00 149.00 4.00 1.83 3 0.30 0.34 0.16 2.51
Including 1.0 167.00 171.85 4.85 1.07 23 1.51 4.59 1.90 4.18
KSNDDH093 0.5 105.00 110.30 5.30 0.25 11 1.07 0.74 0.99 1.85
Including 1.0 106.00 110.30 4.30 0.28 11 1.21 0.86 1.11 2.06
KSNDDH093 0.5 180.10 190.00 9.90 0.68 14 0.93 2.93 3.42 3.02
Including 1.0 180.10 189.40 9.30 0.71 15 0.98 3.08 3.62 3.17
KSNDDH094 0.5 106.00 119.00 13.00 1.04 4 0.91 0.11 0.14 2.21
Including 1.0 106.00 108.00 2.00 0.34 11 1.81 0.23 0.19 2.45
Including 1.0 113.00 115.05 2.05 5.44 8 2.39 0.13 0.06 8.72
KSNDDH094 0.5 136.00 145.00 9.00 0.31 4 0.72 0.35 0.10 1.21
Including 1.0 142.00 144.25 2.25 0.47 6 1.57 0.46 0.16 2.31
KSNDDH094 0.5 148.00 162.00 14.00 0.23 5 0.30 0.59 1.07 0.95
Including 1.0 152.00 156.00 4.00 0.28 14 0.84 1.32 2.24 2.02
KSNDDH095 0.5 134.00 135.00 1.00 9.43 6 2.27 0.01 0.04 13.06
KSNDDH096 0.5 86.00 86.85 0.85 0.13 11 3.90 0.01 0.09 4.26
KSNDDH096 0.5 141.55 145.00 3.45 0.34 15 0.10 3.61 1.86 1.63
Including 1.0 141.55 144.00 2.45 0.30 19 0.14 4.94 2.47 2.02
KSNDDH097 0.5 128.00 143.00 15.00 0.5 14 0.32 2.59 1.93 1.88
Including 2.5 128.00 131.50 3.50 0.60 27 0.46 5.26 3.33 3.02
KSNDDH098 0.5 137.00 151.95 14.95 0.89 16 0.44 2.93 0.81 2.32
High Grade
3
KINGSTONRESOURCES.COM.AU | ASX: KSN
Jack’s Hut geological interpretation
The mineralisation at Jack’s Hut dips approximately 65° to the west and the metals of
interest are zoned both along and across strike. The key zones along the Jack’s Hut
trend (north to south) consist of:
• Ashes - gold-silver-arsenic sulphide mineralisation hosted in shears and
breccias within the hanging wall of Jack’s Hut.
• Jack’s Hut - copper-gold sulphide mineralisation hosted in veins and
breccia infill, commonly associated with quartz, pyrite and chalcopyrite.
• Iodide - polymetallic lead-zinc-silver-copper-gold mineralisation occurring
as vein and breccia infill and replacement mineralisation.
The drilling reported in this announcement is located at the southern end of Jack’s Hut,
approaching the Iodide zone.
The results support the existing interpretation of two components to the main lode: an
eastern copper-gold-dominant component and a western component with elevated
lead, zinc and silver. Chalcopyrite, galena and sphalerite are the dominant economic
minerals often occurring in bands. Mineralisation and alteration are frequently
associated with shearing and quartz veining.
The program returned significant downhole intersections of up to 15m, broadly
supporting the interpreted location and grade tenor of mineralisation in the targeted
areas. KSNDDH093 illustrates the style of polymetallic mineralisation encountered in the
area, as shown in the core photographs in Figure 5. The hole returned 9.30m @ 3.08%
Pb, 3.62% Zn, 0.97% Cu, 0.71g/t Au, 15g/t Ag from 180.1m (3.2% CuEq).
The surface drill rig is expected to arrive at Mineral Hill in October 2026 to test potential
extensions below the existing Jack’s Hut Mineral Resource. The infill results will be
incorporated into an updated geological model, with an updated Jack’s Hut Mineral
Resource estimate targeted for the March quarter of 2027.
4
KINGSTONRESOURCES.COM.AU | ASX: KSN
Figure 1: Plan view of the Jack’s Hut Infill drill holes.
Figure 2: Oblique view looking down the dip of the mineralisation (looking towards -55°->326°). Viewing the
results in this way shows the alignment of the intersections along the two main lode trends.
5
KINGSTONRESOURCES.COM.AU | ASX: KSN
Figure 3: Jack’s Hut cross-section at 1130mN showing the pre-existing Mineral Resource lode interpretation
and conceptual stope design.
Figure 4: Long-section looking west showing the recent Jack's Hut drilling results alongside the existing
Mineral Resource.
6
KINGSTONRESOURCES.COM.AU | ASX: KSN
Figure 5: Core photos KSNDDH093, 179m - 192.15m, showing chalcopyrite, galena, sphalerite mineralisation.
This release has been authorised by the Kingston Resources Limited Board.
For all enquiries, please contact Managing Director, Andrew Corbett, on +61 2 8021 7492.
7
KINGSTONRESOURCES.COM.AU | ASX: KSN
Metal Equivalents
This announcement quotes metal equivalent grades as defined by Kingston Resources. Price assumptions
used are based on market consensus forecasts, with adjustments to account for reasonable prospects for
eventual economic extraction (RPEEE), as guided by JORC reporting guidelines. Copper equivalent (CuEq)
conversion factors are used within the announcement and are calculated by multiplying the grades for each
contributing metal by their respective metal price and recovery and dividing by the multiplication of the
copper price and copper recovery.
Metallurgical recoveries are based on historical production (2010-2016) as well as recent metallurgical test
work and are applied to the Resource and Reserve calculated grades for each commodity. The Company is of
the opinion that all the elements included in the metal equivalent calculations have a demonstrated potential
to be recovered and sold. Mineral Hill has a fully approved mine and processing plant, capable of producing
metal concentrates and dorѐ (from the flotation and CIL circuits). The Company is targeting a
recommencement of mining and processing to produce copper, lead and zinc concentrates as well as
precious metal dorѐ.
Commodity Unit *Price Deposit Commodity Recovery (%) CuEq Factor
Gold US$/oz 5,074 SOZ/JH Gold 83 1.132
Silver US$/oz 76.1 Silver 88 0.018
Copper US$/lb 6.16 Copper 88 1.000
Lead US$/lb 1.08 Lead 75 0.149
Zinc US$/lb 1.51 Zinc 66 0.184
* Metal price assumptions are based on long-term market consensus averages and marked up 15% to account for the
JORC guidelines of allowing for reasonable prospects of eventual economic extraction.
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is based on
information compiled by Mr. Stuart Hayward BAppSc (Geology) MAIG, of 360 Geoscience Pty Ltd, a
Competent Person who is a member of the Australian Institute of Geoscientists. Mr. Hayward has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Hayward
confirms that the information in the market announcement provided is an accurate representation of the
available data and studies for the material mining project and consents to the inclusion in this report of the
matters based upon the information in the form and context in which it appears.
The Competent Person signing off on the overall underground SOZ Ore Reserves Estimate is Mr. Steven
Weckert BE ME (Min) CP, of Australian Mine Design and Development Pty Ltd, who is a Member of the
AusIMM and who has sufficient relevant experience in operations and consulting for underground
metalliferous mines. Mr. Weckert consents to the inclusion in this report of the information pertaining to the
Mineral Hill SOZ Ore Reserve in the form and context in which it appears. The Mineral Hill Mineral Resource
estimates included in this announcement were released in ASX announcements on 15 March 2023 (Pearse
South), 21 March 2023 (Jack’s Hut) and 13 November 2025 (Red Terror and Parker’s Hill) and 24 June 2026
(Southern Ore Zone). The Ore Reserve estimate for the Southern Ore Zone was released in ASX
announcements on 30 September 2024. Further information is included within the original
announcements.
Kingston is not aware of any new information or data that materially affects the information included in this
announcement. All material assumptions and technical parameters underpinning the Mineral Resource
estimates and production targets continue to apply and have not materially changed.
CuEq % = Cu % + (1.132 * Au g/t) + (0.018* Ag g/t) + (0.149 * Pb %) + (0.184 * Zn)
8
KINGSTONRESOURCES.COM.AU | ASX: KSN
Mineral Resources and Ore Reserves
Mineral Hill Mineral Resource and Ore Reserve - JORC Reporting (2012 Ed.).
Mineral Deposit
Resource
Category
Tonnes
(kt)
Grade Metal
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 2,418 1.07 0.81 1.69 1.55 19 83 20 41 37 1,477.1
Inferred 3,490 0.96 0.78 0.83 0.86 11 108 27 29 30 1,178.2
Sub-Total 6,538 1.08 0.83 1.13 1.09 14 227 54 74 71 2,889.0
Jack's Hut
Indicated 608 1.53 1.28 0.50 0.38 7 30 8 3 2 133.7
Inferred 1,032 1.09 0.70 1.05 0.76 28 36 7 11 8 917.1
Sub-Total 1,640 1.25 0.91 0.84 0.62 20 66 15 14 10 1,050.8
Red Terror
Indicated 83 0.58 2.02 - - 4 2 2 - - 9.5
Inferred 131 1.38 1.14 - - 2 6 1 - - 10.2
Sub-Total 214 1.07 1.48 - - 3 7 3 - - 19.7
Parker's Hill
Indicated 2,923 0.17 1.04 1.73 0.81 44 16 30 51 24 4,172.0
Inferred 643 0.16 0.69 1.39 0.93 37 3 4 9 6 758.0
Sub-Total 3,566 0.17 0.98 1.67 0.83 43 19 35 60 30 4,930.0
Pearse South
Indicated 77 3.86 - - - 93 10 - - - 231.0
Inferred 36 2.45 - - - 5 3 - - - 5.4
Sub-Total 113 3.41 - - - 65 12 - - - 236.4
Total Mineral
Resources
Measured 629 1.81 1.14 0.65 0.62 12 37 7 4 4 238.6
Indicated 6,109 0.71 0.99 1.57 1.05 30 140 60 95 64 6,023.2
Inferred 5,332 0.91 0.76 0.92 0.83 17 156 40 49 44 2,869.0
Grand
Total
12,071 0.85 0.90 1.23 0.93 23 332 107 147 111 9,126.0
Mineral Deposit
Reserve
Category
Tonnes
(kt)
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
(g/t) % % % (g/t) (koz) (kt) (kt) (kt) (koz)
Southern Ore Zone Probable 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
TOTAL 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
1. Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
2. Probable Ore Reserves are derived from Indicated Mineral Resources.
3. The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
4. The Ore Reserves form part of the Mineral Resources.
KINGSTONRESOURCES.COM.AU | ASX: KSN 9
Drill Hole Collars and Significant Assays
Table 2: Drillhole collar information.
Hole ID
Local
East
Local
North
Local
RL
MGA20 z55
East
MGA20 z55
North
Elevation
(AHD) Dip
Azimuth
(Local)
Total
Depth (m)
Assay
Status
KSNDDH091 1107.1 1126.4 1256.2 498569.5 6395735.0 256.1 -28 272 230 Final
KSNDDH092 1107.1 1126.4 1256.2 498569.5 6395735.0 256.1 -23 284 223.2 Final
KSNDDH093 1107.1 1126.4 1256.2 498569.5 6395735.0 256.1 -30 284 232 Final
KSNDDH094 1107.1 1126.4 1256.2 498569.5 6395735.0 256.1 -21 291 234.8 Final
KSNDDH095 1104.9 1127.1 1257.6 498567.4 6395734.0 257.6 -20 297 215.3 Final
KSNDDH096 1104.6 1124.9 1257.7 498568.7 6395732.2 257.7 -18 272 179.7 Final
KSNDDH097 1105.1 1124.5 1257.6 498569.4 6395732.3 257.6 -15 265 175 Final
KSNDDH098 1105.4 1124.4 1257.3 498569.7 6395732.4 257.2 -17 259 196.5 Final
Table 3: Full list of significant intercepts (ETW – estimated true width).
Hole ID Cutoff (%) From (m) To (m) Length (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CuEq (%) ETW (m)
KSNDDH091 0.5 101.00 104.00 3.00 0.09 2 0.69 0.01 0.06 0.84 1.68
KSNDDH091 0.5 111.00 112.00 1.00 0.11 2 0.51 0.01 0.03 0.68 0.56
KSNDDH091 0.5 115.00 116.00 1.00 0.10 2 0.66 0.00 0.07 0.82 0.56
KSNDDH091 0.5 119.00 120.00 1.00 0.09 3 0.54 0.02 0.10 0.71 0.56
KSNDDH091 0.5 151.00 152.00 1.00 0.14 3 0.10 0.77 1.10 0.63 0.56
KSNDDH091 0.5 153.00 154.00 1.00 0.11 3 0.07 0.64 1.20 0.55 0.56
KSNDDH091 0.5 159.00 178.00 19.00 0.65 11 0.56 2.05 1.79 2.14 10.62
KSNDDH091 Incl. 1.0 165.00 178.00 13.00 0.88 16 0.76 2.80 2.48 2.92 7.27
KSNDDH091 Incl. 2.5 166.00 176.00 10.00 0.94 18 0.89 3.25 2.81 3.27 5.59
KSNDDH091 0.5 182.00 189.00 7.00 0.27 3 0.07 0.78 0.99 0.73 3.91
KSNDDH091 Incl. 1.0 184.00 185.30 1.30 0.13 9 0.05 2.64 1.59 1.05 0.73
KINGSTONRESOURCES.COM.AU | ASX: KSN 10
Hole ID Cutoff (%) From (m) To (m) Length (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CuEq (%) ETW (m)
KSNDDH091 Incl. 1.0 188.00 189.00 1.00 0.58 3 0.26 0.43 1.40 1.30 0.56
KSNDDH092 0.5 93.00 98.00 5.00 0.15 16 2.00 0.41 1.01 2.71 3.21
KSNDDH092 Incl. 2.5 94.00 96.00 2.00 0.23 26 3.04 0.73 1.34 4.11 1.29
KSNDDH092 0.5 101.00 115.50 14.50 0.32 4 0.37 0.20 0.19 0.87 9.32
KSNDDH092 Incl. 1.0 101.00 102.00 1.00 0.69 7 0.37 0.20 0.10 1.33 0.64
KSNDDH092 Incl. 1.0 105.00 109.00 4.00 0.27 6 0.61 0.47 0.36 1.17 2.57
KSNDDH092 Incl. 1.0 112.00 113.20 1.20 0.99 1 0.19 0.01 0.12 1.36 0.77
KSNDDH092 0.5 127.50 128.50 1.00 0.30 3 0.20 0.17 0.04 0.63 0.64
KSNDDH092 0.5 137.50 138.40 0.90 0.18 2 0.29 0.09 0.02 0.55 0.58
KSNDDH092 0.5 142.75 171.85 29.10 0.70 7 0.43 1.16 0.49 1.61 18.70
KSNDDH092 Incl. 1.0 145.00 149.00 4.00 1.83 3 0.30 0.34 0.16 2.51 2.57
KSNDDH092 Incl. 1.0 155.00 161.00 6.00 0.74 5 0.34 0.72 0.27 1.42 3.86
KSNDDH092 Incl. 2.5 155.00 156.00 1.00 2.61 15 0.55 3.30 0.45 4.34 0.64
KSNDDH092 Incl. 1.0 167.00 171.85 4.85 1.07 23 1.51 4.59 1.90 4.18 3.12
KSNDDH093 0.5 105.00 110.30 5.30 0.25 11 1.07 0.74 0.99 1.85 2.89
KSNDDH093 Incl. 1.0 106.00 110.30 4.30 0.28 11 1.21 0.86 1.11 2.06 2.34
KSNDDH093 Incl. 2.5 107.00 108.00 1.00 0.30 19 1.94 1.77 2.72 3.38 0.54
KSNDDH093 0.5 119.00 126.00 7.00 0.09 6 0.44 0.52 0.38 0.79 3.81
KSNDDH093 Incl. 1.0 119.00 120.00 1.00 0.13 13 0.84 0.40 0.78 1.43 0.54
KSNDDH093 Incl. 1.0 122.00 123.00 1.00 0.17 8 0.70 0.61 0.88 1.29 0.54
KSNDDH093 Incl. 1.0 125.00 126.00 1.00 0.12 9 0.69 1.53 0.11 1.23 0.54
KSNDDH093 0.5 130.00 134.00 4.00 0.09 2 0.56 0.02 0.05 0.70 2.18
KSNDDH093 Incl. 1.0 132.00 133.00 1.00 0.19 3 0.88 0.03 0.05 1.16 0.54
KSNDDH093 0.5 180.10 190.00 9.90 0.68 14 0.93 2.93 3.42 3.02 5.39
KSNDDH093 Incl. 1.0 180.10 189.40 9.30 0.71 15 0.98 3.08 3.62 3.17 5.06
KSNDDH093 Incl. 2.5 180.10 183.00 2.90 1.07 22 1.51 4.05 5.48 4.73 1.58
KSNDDH093 Incl. 2.5 187.00 189.40 2.40 0.74 18 1.10 4.47 3.20 3.51 1.31
KINGSTONRESOURCES.COM.AU | ASX: KSN 11
Hole ID Cutoff (%) From (m) To (m) Length (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CuEq (%) ETW (m)
KSNDDH093 0.5 198.00 199.20 1.20 0.82 3 0.45 0.10 0.04 1.45 0.65
KSNDDH094 0.5 37.00 38.00 1.00 0.16 7 2.28 0.02 0.04 2.60 0.66
KSNDDH094 0.5 95.90 103.00 7.10 0.14 5 0.53 0.05 0.05 0.79 4.69
KSNDDH094 Incl. 1.0 99.00 100.00 1.00 0.22 13 0.69 0.11 0.08 1.21 0.66
KSNDDH094 0.5 106.00 119.00 13.00 1.04 4 0.91 0.11 0.14 2.21 8.59
KSNDDH094 Incl. 1.0 106.00 108.00 2.00 0.34 11 1.81 0.23 0.19 2.45 1.32
KSNDDH094 Incl. 2.5 107.00 108.00 1.00 0.41 11 2.44 0.10 0.08 3.13 0.66
KSNDDH094 Incl. 1.0 113.00 115.05 2.05 5.44 8 2.39 0.13 0.06 8.72 1.36
KSNDDH094 Incl. 1.0 118.00 119.00 1.00 0.25 3 0.90 0.01 0.03 1.24 0.66
KSNDDH094 0.5 125.00 126.00 1.00 0.12 5 0.31 0.22 0.26 0.62 0.66
KSNDDH094 0.5 136.00 145.00 9.00 0.31 4 0.72 0.35 0.10 1.21 5.95
KSNDDH094 Incl. 1.0 137.00 138.00 1.00 0.38 4 0.89 0.21 0.04 1.42 0.66
KSNDDH094 Incl. 1.0 142.00 144.25 2.25 0.47 6 1.57 0.46 0.16 2.31 1.49
KSNDDH094 Incl. 2.5 143.00 144.25 1.25 0.41 7 2.22 0.60 0.19 2.94 0.83
KSNDDH094 0.5 148.00 162.00 14.00 0.23 5 0.30 0.59 1.07 0.95 9.25
KSNDDH094 Incl. 1.0 152.00 156.00 4.00 0.28 14 0.84 1.32 2.24 2.02 2.64
KSNDDH094 Incl. 2.5 152.00 153.00 1.00 0.41 22 1.99 1.97 1.77 3.47 0.66
KSNDDH094 0.5 167.00 174.55 7.55 0.26 4 0.22 0.60 1.00 0.85 4.99
KSNDDH094 Incl. 1.0 168.00 169.00 1.00 0.33 3 0.59 0.37 0.11 1.10 0.66
KSNDDH094 Incl. 1.0 171.00 174.55 3.55 0.23 5 0.23 0.95 2.06 1.11 2.35
KSNDDH094 0.5 191.00 193.85 2.85 0.68 5 0.04 0.34 0.76 1.09 1.88
KSNDDH094 Incl. 1.0 191.00 193.00 2.00 0.80 6 0.06 0.44 1.01 1.32 1.32
KSNDDH095 0.5 113.00 116.05 3.05 0.15 5 0.44 0.09 0.06 0.72 2.00
KSNDDH095 Incl. 1.0 115.00 116.05 1.05 0.14 11 0.83 0.20 0.10 1.23 0.69
KSNDDH095 0.5 126.00 127.00 1.00 0.42 1 0.02 0.00 0.00 0.50 0.66
KSNDDH095 0.5 134.00 135.00 1.00 9.43 6 2.27 0.01 0.04 13.06 0.66
KSNDDH095 0.5 137.15 139.00 1.85 0.19 3 1.15 0.01 0.04 1.42 1.22
KINGSTONRESOURCES.COM.AU | ASX: KSN 12
Hole ID Cutoff (%) From (m) To (m) Length (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CuEq (%) ETW (m)
KSNDDH095 Incl. 1.0 138.00 139.00 1.00 0.23 4 1.53 0.01 0.06 1.86 0.66
KSNDDH095 0.5 143.00 144.00 1.00 0.15 2 0.41 0.01 0.03 0.61 0.66
KSNDDH095 0.5 148.00 156.00 8.00 0.20 6 0.56 0.14 0.02 0.93 5.26
KSNDDH095 Incl. 1.0 151.30 156.00 4.70 0.23 9 0.74 0.19 0.03 1.19 3.09
KSNDDH095 0.5 157.40 158.00 0.60 0.20 8 0.70 0.12 0.03 1.09 0.39
KSNDDH095 0.5 171.00 172.00 1.00 0.35 8 0.21 0.99 0.49 0.99 0.66
KSNDDH095 0.5 176.00 181.50 5.50 0.19 9 0.42 1.51 0.32 1.08 3.61
KSNDDH095 Incl. 1.0 180.20 181.50 1.30 0.27 26 1.10 5.08 0.55 2.73 0.85
KSNDDH095 0.5 186.00 187.00 1.00 0.18 2 0.04 0.66 1.63 0.69 0.66
KSNDDH096 0.5 61.00 62.00 1.00 0.04 2 0.74 0.01 0.04 0.83 0.69
KSNDDH096 0.5 86.00 86.85 0.85 0.13 11 3.90 0.01 0.09 4.26 0.59
KSNDDH096 0.5 92.00 93.00 1.00 0.29 4 1.21 0.01 0.09 1.63 0.69
KSNDDH096 0.5 98.00 99.00 1.00 0.04 3 0.41 0.01 0.04 0.51 0.69
KSNDDH096 0.5 127.50 128.50 1.00 0.11 2 0.52 0.02 0.02 0.69 0.69
KSNDDH096 0.5 131.50 136.45 4.95 0.13 4 0.19 0.58 1.82 0.83 3.42
KSNDDH096 Incl. 1.0 134.50 135.50 1.00 0.20 6 0.26 1.33 7.36 2.14 0.69
KSNDDH096 0.5 141.55 145.00 3.45 0.34 15 0.10 3.61 1.86 1.63 2.39
KSNDDH096 Incl. 1.0 141.55 144.00 2.45 0.30 19 0.14 4.94 2.47 2.02 1.69
KSNDDH096 0.5 152.50 158.50 6.00 0.52 4 0.00 0.07 0.22 0.72 4.15
KSNDDH096 Incl. 1.0 156.50 157.50 1.00 1.25 5 0.00 0.02 0.02 1.51 0.69
KSNDDH096 0.5 166.00 167.00 1.00 0.21 7 0.05 0.16 0.63 0.55 0.69
KSNDDH096 0.5 171.15 173.15 2.00 0.08 21 0.01 0.04 0.16 0.51 1.38
KSNDDH097 0.5 54.00 56.00 2.00 0.09 3 1.03 0.01 0.07 1.20 1.40
KSNDDH097 Incl. 1.0 54.00 55.00 1.00 0.13 4 1.47 0.01 0.09 1.71 0.70
KSNDDH097 0.5 72.00 73.00 1.00 0.54 1 0.01 0.00 0.01 0.63 0.70
KSNDDH097 0.5 100.00 101.00 1.00 0.07 2 0.42 0.00 0.06 0.54 0.70
KSNDDH097 0.5 114.00 115.00 1.00 2.98 6 0.53 0.03 0.03 4.02 0.70
KINGSTONRESOURCES.COM.AU | ASX: KSN 13
Hole ID Cutoff (%) From (m) To (m) Length (m) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CuEq (%) ETW (m)
KSNDDH097 0.5 122.00 123.00 1.00 0.68 3 0.16 0.04 0.02 0.99 0.70
KSNDDH097 0.5 128.00 143.00 15.00 0.50 14 0.32 2.59 1.93 1.88 10.52
KSNDDH097 Incl. 2.5 128.00 131.50 3.50 0.60 27 0.46 5.26 3.33 3.02 2.45
KSNDDH097 Incl. 2.5 142.00 142.60 0.60 0.67 50 1.06 10.60 9.59 6.07 0.42
KSNDDH097 0.5 147.00 152.00 5.00 0.16 20 0.00 0.02 0.06 0.56 3.51
KSNDDH097 Incl. 1.0 150.00 151.00 1.00 0.20 47 0.01 0.05 0.14 1.12 0.70
KSNDDH097 0.5 162.00 163.00 1.00 0.50 4 0.00 0.01 0.01 0.64 0.70
KSNDDH098 0.5 88.00 89.00 1.00 0.20 2 0.34 0.01 0.03 0.61 0.65
KSNDDH098 0.5 124.00 128.00 4.00 0.56 1 0.00 0.01 0.02 0.65 2.58
KSNDDH098 Incl. 1.0 124.00 125.00 1.00 1.45 1 0.00 0.00 0.02 1.66 0.65
KSNDDH098 0.5 137.00 151.95 14.95 0.89 16 0.44 2.93 0.81 2.32 9.65
KSNDDH098 Incl. 1.0 137.00 151.50 14.50 0.91 16 0.45 3.02 0.83 2.37 9.36
KSNDDH098 Incl. 2.5 141.00 142.00 1.00 2.10 10 0.89 1.05 1.10 3.81 0.65
KSNDDH098 Incl. 2.5 150.00 151.50 1.50 1.44 116 1.25 24.73 5.69 9.72 0.97
KSNDDH098 0.5 159.00 160.00 1.00 0.20 5 0.10 0.98 0.63 0.68 0.65
KSNDDH098 0.5 174.00 175.00 1.00 0.18 21 0.02 0.02 0.22 0.65 0.65
KINGSTONRESOURCES.COM.AU | ASX: KSN 14
Appendix 1. Jack’s Hut Underground Drilling - JORC Code Table 1
Section 1 Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
• Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
• Aspects of the determination of mineralisation that
are Material to the Public Report.
• In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there
is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Diamond Drilling Sample Collection
• A diamond core drill rig was used to produce rock samples of core. Run length was variable
between 3m and 1m depending on the ground conditions and any expected mineralisation.
• Triple Tube HQ and NQ barrel set up was utilised to maximize recoveries.
• Diamond drill core is orientated where orientation tools provided an outcome that is assessed
as reliable.
• The geologist selects sample intervals based on logged geology (lithology, alteration,
mineralisation, structures) with minimum sample length of 0.3m and maximum of 1.5m. Half
core samples were taken from start to end of hole. All drill core is sampled using an
automated/mechanical core cutting machine with diamond cutting blade. Samples
comprise half core with sample intervals determined by the geologist and recorded as a cut
sheet.
• For orientated drill core a cutting reference line is drawn approximately 15mm offset from the
orientation line. Drill core is cut along the cut line with the orientation line not sampled and
returned to the core box for future reference.
• Non-orientated drill core is cut along a reference line that is the best approximation of the
extensions of the orientation reference line with the intent of ensuring the same half core is
sampled.
• Samples are placed in calico bags and dispatched to ALS laboratory where they are received
and registered with a sample receipt document provided as a record of the chain of custody
process.
Analysis of Geotechnical Samples
• Field point load testing (PLT) was conducted on solid pieces of core >100mm in length from
every 3rd core tray. Different rock type samples were selected to collect a range of data
reflecting varying rock mass strengths throughout each hole.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by
what method, etc).
• This release refers to 8 diamond drill holes that have been completed in the program for
a total of 1686.5 metres.
• The holes were collared in a stockpile off the Jack’s Hut decline.
• All holes were diamond cored with HQ3 with the option to reduce to NQ3 where adverse
ground conditions were encountered.
• All holes were oriented using an Axis North-seeking Gyroscopic tool. During drilling a collar
check survey and a 15m survey was taken, followed by surveys every 30m from 30m depth to
end of hole. Prior to completing each hole, a multi-shot continuous gyro survey was taken.
Each single shot and EOH multi-shot was then uploaded to the cloud-hosted Axis database
KINGSTONRESOURCES.COM.AU | ASX: KSN 15
Criteria JORC Code explanation Commentary
for retrieval and review by Geology.
• Reverse Circulation Drilling
• No Reverse Circulation drilling was completed as part of the program being reported or
depicted in the release.
Drill sample
recovery
• Method of recording and assessing core and chip
sample recoveries and results assessed.
• Measures taken to maximise sample recovery and
ensure representative nature of the samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
• Diamond Drill Core
• Diamond drill core is recovered on a run-by-run basis where the length drilled, and axial
length recovered is recorded by the drilling crew. Run length and recovery are
remeasured and calculated in the core processing area. No significant discrepancies
have been noted between driller and KSN determined runs and recovery.
• Diamond drill core is sampled as half core using a diamond blade auto saw.
• Core loss zones have not been sampled. These ‘gaps’ in sampling have been assigned
zero (0) grade for the purposes of significant interval calculation.
• Reverse Circulation Drilling
• No Reverse Circulation drilling referred to or reported or depicted in the release.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
• Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the relevant
intersections logged.
• A qualified geologist logs all drill core from this program.
• Logging captured, lithological, alteration, mineralisation, structural and weathering
information. Drill core also provided geotechnical data based on physical counts of and
physical measurement of angles, hardness, roughness, of discontinuities and visual
assessment and description of structural features.
• Geological logging is generally qualitative in nature noting the presence of various geological
features and their intensities using a numerical 1-5 scale. Quantitative features of the logging
include structural alpha and beta measurements captured as well as magnetic susceptibility
and bulk density data.
• Bulk density intervals were chosen to represent the range of lithology/alteration and
mineralisation within the hole. The test can only be completed on competent core, so areas
of broken or clayey core are not represented in the bulk density measurements,
• “Dry weight” and “Wet weight” measurements were taken every 3 trays for pieces of core >=
10cm and bulk density calculated using the Archimedes Principal:
• Bulk Density = (Sample Weight in Air) *(Fluid Density) / (Sample Weight in Air) – Sample
Weight in Water).
• The entire set of holes are fully logged and photographed.
• Diamond Core Drilling
• Recoveries were measured by the driller and/or offsider whilst in the splits on the rack
at the rig site using a handheld tape measure. Recoveries were written in permanent
marker on a core block placed in the core tray. The Geologist and/or field assistant
measured the length of recovered core in the trays when meter marking the core.
Recovery is recorded as a percentage per run.
• Drill core recoveries across the drill holes average >95% with 95-100% recovery in mineralised
zones.
• There is no observed relationship between sample recovery and grade.