Investor Presentation - Noosa Mining Conference
Released
Released
Announcement PDF
Long-term, Diversified GoldCopper Producer
Noosa Mining Conference
July 2023
Andrew Corbett, Managing Director
✓ Mineral Hill delivering growth in gold and copper production
✓ 3.8Moz Misima Gold Project Definitive Feasibility Study complete
ASX: KSN
Important Notices and Disclaimer
Forward looking statements: Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects, are forward
looking statements. Such forward looking statements:
include, among other things, statements regarding incomplete and uncertain proposals or targets, production and prices, operating costs and results, capital expenditures, and are or may be
based on assumptions and estimates related to future technical, economic, market, political, social and other conditions;
are necessarily based upon a number of estimates and assumptions that, while considered reasonable by KSN, are inherently subject to significant technical, business, economic,
competitive, political and social uncertainties and contingencies; and
involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward
looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or otherwise. The words “believe”,
“expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward
looking statements. All forward looking statements made in this presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements
are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty therein.
Disclaimer: No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in
this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other person accepts any liability, including, without limitation, any
liability arising out of fault of negligence, for any loss arising from the use of the information contained in this presentation. In particular, no representation or warranty, express or implied is
given as to the accuracy, completeness or correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation
assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products. The
information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. The presentation has
been prepared without taking into account the investment objectives, financial situation or particular needs of any particular person. Before making an investment decision, you should
consider, with or without the assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances. Past
performance is no guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral
Hill Production Expansion.
Exploration by Other Explorers
This presentation contains information sourced from the reports of Other Explorers. References to the original reports are provided as footnotes where the information is cited in this
presentation. KSN does not vouch for the accuracy of these reports. KSN has taken the decision to include this information as it is in the public domain and as we assess it to be of
relevance to shareholders and investors.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
2
Important Notices and Disclaimer
Underground Production Target
The LOM plan includes Mineral Resource Estimates from the Southern Ore Zone (SOZ) and Jack’s Hut to estimate the Production Target. All Ore Reserves and Mineral Resources
underpinning this LOM plan have been prepared by Competent Persons in accordance with the 2012 JORC reporting guidelines. Probable Ore Reserve provides 46% of the total LOM
processing plant feed tonnage. The Underground production target is based on Mineral Resource estimates and comprises Measured (7%), Indicated (31%), Inferred (56%) and unclassified
(6%) material.
There is a low level of confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of Indicated Mineral
Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of future results or events and should not be solely relied upon by investors when making investment decisions.
Further evaluation work and appropriate studies are required to establish sufficient confidence that this target will be met. The Company notes that the Project forecasts a positive financial
performance and is therefore satisfied that the use of Inferred resources in production target reporting and forecast financial information is not the determining factor in overall Project
viability and that it is reasonable to report the LOM plan with Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the forward-looking statements included in this announcement. The detailed reasons for that conclusion are
outline throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
3
Company vision
Becoming a leading ASX-listed mid-tier gold and copper producer, pioneering excellence and delivering
sustainable value to stakeholders
Two advanced 100%-owned gold & copper projects
Management team; jurisdictional experience and a track record of success
Long-term diversified gold-copper producer in NSW
Exceptional growth opportunity; exploration upside & regional acquisition
Existing approvals and extensive infrastructure
AU$18+ million cash and existing operating cashflow for growth expansion
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
4
A diversified portfolio of gold and copper projects
Unleashing exponential growth and value
Misima Gold Project, PNG (100%)
• DFS Validation: Affirming the potential for a robust, scalable, and low-cost open pit operation.
• Production Potential: Anticipated gold production of ~2.4Moz over a 20-Year Mine Life (Avg.
128kozpa).
• Strong Financial Viability: Pre-Tax Net Present Value (NPV) of A$956 Million (based on a
US$1,800/oz Gold Price).
• Gold Price Sensitivity: Highly leveraged to the upside of the gold price, amplifying potential returns.
• Current Focus: Prioritizing ESIA reports, strategic funding & development strategies.
Mineral Hill Mine, NSW (100%)
• Well-funded: Estimated cash balance of AU$18.2M and existing operating cash flow from the Tailings
Project.
• Mining Expansion: Open pit and underground mining scheduled out to the end of 2027.
• Significant Upside: Current life of mine only utilizes 22% of the current 8.9Mt of Mineral Resources.
• Infrastructure Excellence: Extensive existing infrastructure with all permits approvals in place.
• Exploration Potential: Exceptional upside within current Mining Leases (ML) and Exploration Licenses
(EL).
• Current Focus: Maximizing returns through Tailings Project gold production, proactive exploration
drilling, and strategic underground re-entry efforts.
www.kingstonresources.com.au I ASX: KSN
1.
2.
See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion
See ASX Announcement dated 3 July 2023, Additional funding received from PURE Asset Management
Corporate Presentation July 2023
5
Corporate snapshot
Current
Share Price1
$0.08
Directors & Management
Mick Wilkes
Non-Executive Chairman
35+ years experience
Shares on Issue
468.6M
Andrew Corbett
Managing Director
25+ years experience
Market Capitalisation
$38.4M
Stuart Rechner
Non-Executive Director
20+ years experience
Enterprise Value
$30.2M
Tony Wehby
Non-Executive Director
35+ years experience
Cash2
$18.2M
Stuart Hayward
Chief Geologist
30+ years experience
Debt
$10.0M
Geoff Merrell
GM Mineral Hill
25+ years experience
12 month Share Price Performance
Shareholder Structure
MarketVolume ('000) (RHS)
Close Price (A$) (LHS)
$0.16
8,000
$0.14
7,000
$0.12
6,000
$0.10
5,000
$0.08
4,000
$0.06
3,000
$0.04
2,000
$0.02
1,000
$0.00
Jun-22
0
Aug-22
Oct-22
Dec-22
Feb-23
● Quintana
● Delphi
● Winchester Investments
● Farjoy
● BNP Paribas Nominees
● Other shareholders
11.7%
13.1%
7.4%
6.8%
4.1%
56.9%
Apr-23
1. Close of trading 18 July 2023. 2. Estimated Cash balance, as at 30 June 2023
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
6
Mineral Hill
Overview
Corporate Presentation July 2023
7
Mineral Hill – Evolution and Growth Phases
Long life, strategic asset in the southern Cobar region
Phase 3
Phase 2
Phase 1
Open-pit and Underground Mining
Grow and Expand
•
Extend the LOM.
•
Add quality throughput to maximise
free cash flow.
•
Target flotation plant expansion from
350ktpa to 500ktpa.
•
Current LOM out to 2027+
Tailings Project Cash Flow
•
Targeting 30 - 35kozpa+ AuEq.
•
Aspiration of 50kozpa+ AuEq.
•
Continuing gold dore production
from the Tailings Project.
•
Dore, gold concentrate, copper, lead
and zinc concentrate.
•
Grow through regional acquisition.
•
Refurbish the existing processing
plant and underground
infrastructure.
•
Organically grow the resource base.
•
Pipeline of resources development
targets beyond LOM inventory.
•
Build the resource and refine mine
planning.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
8
Mineral Hill – strategic location
Significant organic and regional resource growth opportunities
Abundance of gold-silver and polymetallic Cobar-style
deposits within approved ML’s and within trucking distance
of Mineral Hill processing plant
Wonawinta
Federation
Manuka
Aurelia
Location
516km W of Sydney NSW in Cobar Basin
Ownership
100%: 20 ML’s (4.85km2) and 2 EL’s (335km2)
Reserves (recovered)1,2
53,000 AuEq oz
Resources (recovered)1,2 795,000 AuEq oz (40% Cu, 30% Au)
Orebody
Structure controlled polymetallic vein and
epithermal Au
Mining Methods
Open pit and underground long-hole stoping
Water
Supplied from underground and site storage
Power
Mains with grid upgrade
Historical Production
396koz Au, 33kt Cu (plus Pb, Zn concentrate)
1. Gold equivalent ounces calculated based on consensus commodity prices with adjustments based on company
expectations. See Appendix for equivalency calculations
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for
additional Mineral Hill Resource and Reserve information.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
9
Mineral Hill – mining lease and infrastructure
Extensive existing infrastructure enables accelerated path to
gold-silver dore, copper, lead and zinc production
EL1999
Pearse Nth
• History of underground and open pit mines.
• Numerous gold-silver and polymetallic Cobar style mineral deposits all
within approved mining leases.
Mineral Resources
Additional Deposits
• Current cash flow from reprocessing historical tailings, owner miner.
• Full mine approvals, environmental permits & biodiversity offset,
tailings facilities, water and power all in place.
Pearse Sth
Hut
Processing Infrastructure
• CIL with 700ktpa
capacity.
GD140
Parker’s Hill
• Flotation plant capacity
of 350ktpa.
• 3 x separate base metal
concentrates; copper,
lead and zinc (superior
payability compared to
bulk concentrate).
www.kingstonresources.com.au I ASX: KSN
Parker’s Hill
East
TSF
SOZ
EL1999
Corporate Presentation July 2023
10
Mineral Hill – Initial LOM to 2027
Key stages in implementing transformational growth at Mineral Hill
Calendar Year
2023
2024
2025
2026
2027
Cash flow from Tailings Project
Processing plant refurbishment
Underground re-access works
Underground resource drilling
Open pit mining
Open pit processing
Underground mining
Underground processing
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
11
Mineral Hill – production outlook
Zinc
Transitioning to open pit and underground mining
Lead
• Successful Tailing project delivering platform for
growth.
FY261
• LOM production target out to 2028.
• Transition to open pit production in April 2024.
Copper
Silver
• High grade gold and silver from open pit mining.
• Underground mining to produce high-tech
critical metals, with first copper concentrate in
CY2025.
Silver
Lead
Gold
Zinc
• High potential to add mining inventory from
exploration within the current mining leases.
FY251
Copper
Gold
Gold
FY241
Silver
1. Pie sectors based on proportion of payable metal.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
12
Mineral Hill – leveraging existing gold production from the Tailings Project
Tailings processing with CIL capacity up to 700ktpa
• Optimised the Tailings Project; increased
throughput rates and increased recovery.
Quarterly Gold Production
• Gold production increased significantly, leading to
reduced unit costs since the start of the project.
Gold Sold (oz)
AISC (A$/oz)
6,000
5,000
• Owner mining focus to drive down costs.
4,500
Gold Sales (oz) and AISC (A$/oz)
• Mining of the tailings facility allows it to be rebuilt
for future tailings storage.
4,777
5,000
4,431
4,000
3,500
3,705
3,000
3,153
3,000
2,000
1,000
4,000
2,500
2,000
2,079
1,770
1,500
1,543
1,494
1,000
500
-
-
Figure: Tailings Mining Project – current high margin gold production
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
13
Mineral Hill – Open Pit and Underground Mining
Open Pit
Underground
• New pit at Pearse North.
• Production target1 using the Southern
Ore Zone (SOZ) and Jack’s Hut MREs.
Deepening and cutback of Pearse
South.
• Existing decline development reduces
capital expenditure.
• All permits and approvals in place.
• High-grade gold/silver ore (4.4g/t • Underground access has commenced.
AuEq).
• Resource drilling in Q2FY24. Initial Ore
Reserve by Q4FY24.
• Owner mining strategy to be
employed.
• Jack’s Hut prospective for MRE growth
• Exploring for additional deposits.
along strike
Pearse North and South pit designs
Underground longitudinal projection looking east – Jack’s Hut and Southern Ore Zone
www.kingstonresources.com.au I ASX: KSN
1.
See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key
assumptions.
Corporate Presentation July 2023
14
Near Mine Drill Targets
Multiple drill targets to be tested within EL1999
• 15 new near mine targets with potential to significantly
expand contained copper and gold.
• Multiple untested targets: none of the exploration
targets have been previously drill-tested.
• Focus on expanding mineral inventory for Mineral Hill’s
processing plant and extending LOM.
• Geochemical anomalies coincident with IP chargeability
anomalies.
• Lead is the primary pathfinder element for polymetallic
mineralisation.
• Targeted drill testing planned for July 2023.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
15
Regional exploration
Broader exploration strategy within EL8334
• Drilling to target coincident geophysical
targets (gravity and induced polarisation).
• Highly prospective geology and regional
scale structures.
• Lead in soil anomalies to be drill tested.
• Land access agreements in progress.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
16
Misima
Gold Project
Corporate Presentation July 2023
17
Misima Gold Project
PNG − home of world-class mines
6
SIMBERI
St Barbara
Moz
66
Moz
LIHIR
Newcrest Mining
17
Moz
FRIEDA RIVER
PanAust
PORGERA
24
Barrick Gold
Moz
2
Moz
23
PANGUNA
Moz
27
Moz
OK TEDI
PNG Govt.
17
Moz
KAINANTU
K92 Mining
WAFI-GOLPU
Morobe Mining JV
HIDDEN VALLEY
Harmony Gold
Papua
New Guinea
WOODLARK
Geopacific
4
2
1.6
Moz
Moz
GOLD RIDGE
Moz
TOLUKUMA
2
Moz
PORT MORESBY
www.kingstonresources.com.au I ASX: KSN
7
Moz
Misima Project
600km from Port Moresby
DFS Complete
Historically produced 4Moz AuEq
over 15 years
Corporate Presentation July 2023
18
Misima – long-life, large scale gold project
1.73Moz Reserve underpins long-life Misima Project1
• Total Mineral Resource of 169Mt @ 0.71g/t Au for 3.8Moz
• Probable Ore Reserve increased by 28% to 76 @ 0.8 g/t for 1.73Moz
• Ore Reserve –mine plan delivers 15-year mine life
• Production Target – mine plan delivers 20-year mine life
Tonnes
(Mt)
75.6
Reserve
Probable
koz
Au grade
(gt / Au)
0.79
Ag grade
(gt /Ag)
4.5
Poured gold
Recovery
Au
(Moz)
1.9
Ag
(Moz)
10.9
160
100%
140
120
95%
100
80
90%
60
40
85%
20
Figure: Historical photograph C. 1990-1994
80%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
19
Misima – definitive feasibility and ore reserve1
Large scale, long-life, low-cost open pit gold and silver mine
• High leverage opportunity on the gold price.
• DFS uses $1,800/oz gold price and 0.7 AUD:USD.
Gold price scenario of $2,000/oz lifts LOM NPV to
$1.3bn.
3.8Moz Gold
22.1Moz Silver
Resource
Resource
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
• Work is continuing to find optimal funding and
development options.
Production at AISC
A$1,217/oz
20-year life of mine
LOM Revenue $6.1bn
and
LOM pre-tax FCF
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
20
Summary: focus on executing our clearly defined strategy
Leveraging existing gold-copper asset base while advancing future growth opportunities
Experienced management team focused on maximising
shareholder returns
Mineral Hill holds an extensive Resource base, gold
production and cashflow, outstanding copper potential
Focused gold-copper exploration and long life
development plan at Mineral Hill
Figure: KSNDDH015 - 71.9m: Chalcopyrite vein. Sample
interval 71.6m to 72.3m: 5.5% Cu, 0.5g/t Au, 13g/t Ag.
Misima holds a large-scale, low-cost, long life, production
opportunity as we progress the strategic review
Well-funded with platform for growth from Mineral Hill
cashflow and optionality with the Misima gold project
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
21
Appendix
Corporate Presentation July 2023
22
Mineral Hill Mine – Resources & Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources.
• Polymetallic underground Mineral Resources.
• Additional resource areas to be estimated in CY23
(Parker’s Hill & Red Terror)
Total Mineral Resources
Total Probable Reserve Inventory
Pearse South
Deposit
Au
(g/t)
1,171
1.07
0
40
204
3.77
70
25
Pearse North
239
2.97
25
23
190
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
TSF
Cu
%
Pb
%
Zn
%
Au
(Koz)
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
2349
34
60
54
456
Au (g/t)
1.07
Pearse South
140
4.00
84
18
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
Pearse North
120
3.40
25
13
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
1,431
1.6
57
71
470
TOTAL
8,901
1.13
26
1.0%
1.6%
1.1%
323
6,566
72
113
81
www.kingstonresources.com.au I ASX: KSN
Ag (Koz)
Ag
(g/t)
Kt
TOTAL
Au (Koz)
Kt
1,171
TSF
Ag (g/t)
Deposit
40
Corporate Presentation July 2023
23
Mineral Hill Mine
Environmental and social licence to operate
• Stakeholder engagement – excellent relationship with landholders, community and Condobolin Chamber of Commerce
• Mining Licences (ML) granted
• Environment protection, cyanide and water permits in place
• Environmental Bonds in place with a staged payment schedule
• Development Applications (DA) approvals in place for tailings
(TSF), Pearse pits, SOZ underground
• Mine Operation Plan (MOP) in place for the tailings
retreatment, update required before re-commencing hard rock
mining
• Biodiversity offset in place, review underway to increase offset
by March 2023
• Dam Safety NSW site review complete
• Tailings Dam strategy
• TSF1 currently being re-processed, approval will be sought
for re-use as tailings storage on completion
• TSF2 approved, lift 4 & 5 designed providing storage
capacity for 2.5 years
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation July 2023
24
Competent Person Statement
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on
and fairly represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG
,who is a Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston
Resources Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that
the information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original report.
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly
represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources
Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original report.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
Competent Person’s Statement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward
(BAppSc (Geology)) MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston
Resources Limited. Mr Hayward has sufficient experience in the style of mineralisation and types of deposit under
consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the
‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears. All Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004
and are an accurate representation of the available data and studies for the Mineral Hill Mine. This information has not been
updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was
last reported. Work will commence on close of acquisition by the Company to bring each of the Mineral Resources into line
with the JORC Code 2012.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian
Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the
inclusion in this report of the matters based upon the information in the form and context in which it appears.
Kingston confirms that it is not aware of any new information or data that materially affects the information included in all
ASX announcements referenced in this release, and that all material assumptions and technical parameters underpinning
the estimates in these announcements continue to apply and have not materially changed.
Ore Reserve
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 06/06/2022
John Wyche
AMDAD
TSF
2012
KSN 18/11/2021
Jeremy Peters
Burnt Shirt
Pearse North
2012
KSN 15/03/2023
John Wyche
AMDAD
Pearse South
2012
KSN 15/03/2023
John Wyche
AMDAD
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 15/09/2021
Stuart Hayward
KSN
TSF
2012
KSN 18/11/2021
Troy Lowien
Groundwork Plus
Pearse South
2012
KSN 15/03/2023
Stuart Hayward
KSN
Pearse North
2012
KSN 15/03/2023
Stuart Hayward
KSN
The Competent Person (JORC 2012) for the TSF Ore Reserve is Mr Jeremy Peters (BSc, BEng) a Fellow of the Australasian
Institute of Mining and Metallurgy and Chartered Professional Geologist and Mining Engineer of that organisation. Mr Peters
is a full-time employee of Burnt Shirt Pty Ltd and has sufficient relevant experience to act as Competent Person.
Southern Ore Zone
2012
KSN 24/11/2022
Stuart Hayward
KSN
Jack’s Hut
2012
KSN 21/03/2023
Stuart Hayward
KSN
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and
who has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to
the inclusion in this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and context in which
it appears.
Parkers Hill
2004
KBL 13/09/2011
Anthony Johnston
KBL
Competent Person’s Statement – Ore Reserve Reported in Accordance with JORC Code – Mineral Hill
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code
2012 with exception of the Parkers Hill Mineral Resource Estimates that have been prepared by a Competent Person in
accordance with the JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the
information has not materially changed since it was last reported. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone
Mineral Resource estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes
created by the site survey department at the time of mining. These wireframes represent the mining activities at these
deposits to the best of Kingston’s knowledge although they are not to be viewed as complete or accurate in their entirety and
therefore mining depletion may be revised when Kingston is able to produce revised determinations on more complete data
and verification thereof. Information pertaining to Mineral Resource Estimates (MRE) and Ore Reserves (OR) in this
presentation has been previously released to the public. The tables on this page indicate the authors of the historical
Resources/Reserves and the dates they were initially published. Kingston is not reporting these estimates as its own with
exception of the MRE and OR for the TSF which has not been reported previously by any other company. The other original
reports are available through the ASX website.
www.kingstonresources.com.au I ASX: KSN
Mineral Resource
Corporate Presentation July 2023
25
Mineral Hill – Resources and Reserves
Attractive commodity base with significant grow
Share your feedback
Discover