Capital Raising Presentation
Released
Released
Announcement PDF
Step change in cash
flow with open pit
mining
Capital Raising
Presentation
Accelerating to hard rock
mining
Infill and expand the
underground resources
March 2024
Begin underground
drilling and
development
ASX: KSN
Important notices and disclaimer
Forward Looking Statements
Mineral Hill Gold Bar
Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects,
are forward looking statements. Such forward looking statements: include, among other things, statements regarding incomplete and uncertain
proposals or targets, production and prices, operating costs and results, capital expenditures, and are or may be based on assumptions and estimates
related to future technical, economic, market, political, social and other conditions; are necessarily based upon a number of estimates and assumptions
that, while considered reasonable by KSN, are inherently subject to significant technical, business, economic, competitive, political and social
uncertainties and contingencies; and involve known and unknown risks and uncertainties that could cause actual events or results to differ materially
from estimated or anticipated events or results reflected in such forward looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or
results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”,
“estimate”, “may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking statements made in this
presentation are qualified by the foregoing cautionary statements. Recipients are cautioned that forward looking statements are not guarantees of
future performance and accordingly investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty
therein.
Disclaimer
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other
person accepts any liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the
information contained in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or
correctness, likelihood of achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation
assumed to update such information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue,
securities or other financial products. The information contained in this presentation is not investment or financial product advice and is not intended
to be used as the basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives,
financial situation or particular needs of any particular person. Before making an investment decision, you should consider, with or without the
assistance of a financial adviser, whether an investment is appropriate in light of your particular investment needs, objectives and financial
circumstances. Past performance is no guarantee of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June
2023, $6.5m Capital Raising or Mineral Hill Production Expansion.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
2
Important notices and disclaimer
Exploration by Other Explorers
This presentation contains information sourced from the reports of Other Explorers.
References to the original reports are provided as footnotes where the information is cited
in this presentation. KSN does not vouch for the accuracy of these reports. KSN has taken
the decision to include this information as it is in the public domain and as we assess it to be
of relevance to shareholders and investors.
Underground Production Target
The LOM plan includes Mineral Resource Estimates from the Southern Ore Zone (SOZ) and
Jack’s Hut to estimate the Production Target. All Ore Reserves and Mineral Resources
underpinning this LOM plan have been prepared by Competent Persons in accordance with
the 2012 JORC reporting guidelines. Probable Ore Reserve provides 46% of the total LOM
processing plant feed tonnage. The Underground production target is based on Mineral
Resource estimates and comprises Measured (7%), Indicated (31%), Inferred (56%) and
unclassified (6%) material.
There is a low level of confidence associated with Inferred Mineral Resources and there is
no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of future
results or events and should not be solely relied upon by investors when making investment
decisions. Further evaluation work and appropriate studies are required to establish
sufficient confidence that this target will be met. The Company notes that the Project
forecasts a positive financial performance and is therefore satisfied that the use of Inferred
resources in production target reporting and forecast financial information is not the
determining factor in overall Project viability and that it is reasonable to report the LOM
plan with Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the forwardlooking statements included in this announcement. The detailed reasons for that
conclusion are outline throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
3
Kingston Resources: key highlights
1
Successful completion of the Mineral Hill Tailings Project in the Cobar Basin: The Tailings Project has been a highly successful
operation for the company. Operating cash of $24m has set the stage for the re-commencement of open pit mining.
2
Near term expansion of cash flow: High grade gold and silver from the open pits is forecast to increase cash flow substantially.
Payable1,2 metal is expected to grow 133% YOY in FY25 to ~7kt CuEq.
3
Plant refurbishment and expansion options: Refurbishment of the processing plant for concentrate production is in the final stages.
Crushing and grinding of oxide ore to commence in Q2 2024. Internal work on plant expansion options to 700ktpa.
4
Growth in resources and reserves: Initial underground Ore Reserve due in Q3 2024 and drilling for underground expansions in Q4
2024. Other underground deposits with existing development to be advanced and added to the mining inventory.
5
Strategic value of existing processing capacity granted MLs: As the owner of one of only two polymetallic plants in the Cobar
Basin, Kingston is very well placed to participate in potential regional consolidation.
6
Mineral Hill supporting the Energy Transition: Transition to underground at Mineral Hill will result in increasing production of
foundational base metals, essential for the Energy Transition.
7
Misima’s leverage to the gold price: Large, low-cost 20-year gold project with A$1.3Bn2 NPV at a gold price US$2,000/oz. Potential
for significant value realisation and growth acceleration.
1. See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions
2. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
4
Corporate snapshot
3-Year Share Price Performance
Shares on issue
497.9m
Warrants & options2 and 3
98.7m
Share price @ 26 March 2024
$0.09
Market cap @ 26 March 2024
$44.8m
0.15
Cash
$3.3m
0.10
Market Volume('000) RHS
Close Price (A$) (LHS)
0.25
Restricted cash for environmental bond
$7.3m
Debt ($5m mature 7 July 2026, $5m matures 29 June 2027)
$10m
1,500
0.20
1,000
500
0.05
Mar 24
Dec 23
Sep 23
Jun 23
Mar 23
Dec 22
Sep 22
Jun 22
Mar 22
Dec 21
Sep 21
Jun 21
Mar 21
-
Shareholder Structure
● Quintana
● Delphi
● Winchester Investments
● Farjoy
● Other shareholders
13.4%
12.7%
7.1%
6.4%
60.5%
1. Estimated Cash balance, as at 28 Mar 2024, excludes $7.27m cash backed environmental bond
2. 38m unlisted options @ $0.14, exp 31 July 25, 25m unlisted warrants @ $0.20, exp 07 July 2027, 35.7m unlisted warrants @ $0.14 exp 29 June 2028
3. Exercise price of the warrants to be repriced post capital raise
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
5
Regional setting and increasing production of foundational base metals
• Strategic advantage from ownership of flexible
processing capacity and 8.9Mt of polymetallic resources
• Clear path to underground mining sees increasing levels
of copper and zinc production
Zinc
Lead
Gold
Silver
FY24
FY27
Copper
Silver
Gold
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
6
Highly experienced and well-regarded Executive Team
Significant experience across the development life cycle through to production
Mick Wilkes
Andrew Corbett
Tony Wehby
Stuart Rechner
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Mick is a seasoned mining
professional with 35 years’
experience in the industry,
primarily in gold and base
metals. He has specialised in
sustainable project
development, construction, and
operations throughout his
career.
Andrew is a highly experienced
mining engineer with over 25
years in mine management and
financial markets. He has an indepth understanding of mining,
equity markets, business
development and corporate
strategy.
Tony is a highly experienced
board member and chairman,
previously Non-Executive
Chairman of Tellus Resources
Limited and Aurelia Metals
Limited, and a Director of
Harmony Gold (Aust) Pty Ltd.
Stuart is an experienced
company director and geologist
with a background in project
generation and acquisition in
Australia and overseas. Mr
Rechner holds degrees in both
geology and law.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
7
Equity Raising Summary
Offer size and
structure
• c.A$8.1 million institutional placement (“Placement”) and a c.A$5.4 million Accelerated Non-Renounceable Entitlements Offer (“ANREO”) raising up to
c.A$13.5 million (together, “Offer”) at A$0.065 per share (“Offer Price”). The Offer is not underwritten.
• The Offer will constitute the issue of a total of c.208 million shares (“New Shares”).
• The Placement will consist of the issue of up to c.124.5 million New Shares at A$0.065 per share to raise c.A$8.1 million, utilising the Company’s existing
placement capacity under ASX Listing Rule 7.1 and ASX Listing Rule 7.1A.
• The ANREO will be conducted on the basis of 1 New Share for every 6 Kingston shares (up to c.83 million New Shares).
Placement
pricing
• New Shares will be issued at the Offer Price, which represents a discount of:
• 27.8% to the last closing price of A$0.09 per share on 26 Mar 2024.
• 25.2% discount to the 5-day volume weighted average price (“VWAP”) of A$0.087 as at 26 Mar 2024.
• 24.3% discount to the 10-day VWAP of A$0.086 as at 26 Mar 2024.
Committed
support
• The Company has received commitments from two of the top shareholders, representing c.27% of the Placement offer and that they will participate so as
to maintain their pro rata position.
Use of
proceeds
• Proceeds will be used to transition to Pearse open pit mining, underground resource development drilling, processing plant commissioning and general
working capital.
Update to
Quintana
payment
• Under the Mineral Hill Share Sale Agreement, a final milestone payment of c.US$2.85 million is payable to Quintana on reaching 30,000oz of gold sales.
Quintana and Kingston are in discussions to reduce this payment to US$285,000 in consideration for an 1.25% LOM Net Smelter Royalty (NSR). Kingston
has an option to buy back 50% of this agreed NSR before the 16th January 2027.
Ranking
• New Shares issued under the Placement and ANREO will rank equally in all respects with existing ordinary shares.
Syndicate
• Blue Ocean Equities Pty Ltd and Wilsons Corporate Finance Limited are acting as Joint Lead Managers and Bookrunners to the Placement and ANREO.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
8
Indicative Equity Raising Timeline
Event
Date
Trading halt
Wednesday, 27 March 2024
Announcement of the Placement and ANREO
Thursday, 28 March 2024
Trading halt lifted, trading resumes on an ex-entitlement basis
Tuesday, 2 April 2024
Record date for the Entitlement Offer
7:00pm (Sydney time) on
Wednesday, 3 April 2024
Settlement of New Shares issued under the Placement and the accelerated component of the ANREO
Friday, 5 April 2024
Allotment of New Shares issued under the Placement and the accelerated component of the ANREO
Monday, 8 April 2024
Retail Entitlement Offer opens and dispatch of offer booklet
Monday, 8 April 2024
Retail Entitlement Offer closes
5:00pm (Sydney time) on
Wednesday, 8 May 2024
Allotment and trading of securities issued under the Retail Entitlement Offer
Wednesday, 15 May 2024
The above timetable is indicative only. The Company or Lead Managers may vary any of the above dates without notice, subject to the Corporations Act, the ASX Listing Rules and other applicable law.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
9
Sources and Uses of Funds (excl. Op. Cash Flow from Pearse)
Setting the foundation for a long-term mining operation and increasing production of base metals, essential for
the energy transition
• Substantial value being built from a fully approved and
operating processing plant one of two operating in the
Cobar region that can produce multiple concentrates and
precious metal dore
• Low capital intensity for forecast annual production of
~7ktpa CuEq. Total capital for plant refurbishment of $12.5m
($5m remaining)
Sources of Funds (excl. Op. Cash Flow from Pearse)
A$m
Equity raising proceeds
~$13.5
Cash as at 28 Mar 2024
$3.3
Total Sources of Funds
(excl. Op. Cash Flow from Pearse)
~$16.8
Uses of Funds
A$m
• Forecast Pearse open pit production of 258kt @ 3.72g/t
gold and 57g/t silver (at A$2571/oz gold price and AISC
A$1,339/oz)1
Underground resource development drilling
$2.0
Pearse open pit waste stripping
$5.0
Processing plant commissioning
$5.0
• At current spot prices of $3,200/oz, Pearse open pit margin
increases to $1,861/oz, providing the opportunity to
materially transform the balance sheet
Working capital
Total Uses of Funds
$4.8
• Updated Mineral Resource and Ore Reserve estimates are
underway
• Further drilling from underground platforms to infill and
expand the resource base
~$16.8
Image
1. See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
10
Mineral Hill
Growth strategy for
2024 and beyond
Growth Strategy for 2024
and Beyond
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
11
Extensive existing infrastructure
Targeting a mine plan beyond 10 years
Mineral Hill Processing Capacity
Production set to increase 133% in FY25
700 ktpa
Phase 1
Complete the Tailings
Project
Phase 3
Regional acquisition
potential to expand
the processing
capacity
350 ktpa
Today
The Future
Float capacity
CIL capacity
8,000
3.14
3.18
3.03
6,000
4,000
4.0
3.0
2.0
0.86
2,000
1.0
-
0.0
FY24
FY25
FY26
CuEq Grade (%)
Phase 2
Lift production in
FY25 , commence
copper production
and extend the mine
life
Payable Metal (CuEq t)
Metal Forecast1
FY27
Gold
Silver
Copper
Lead
Zinc
CuEq Grade (%)
1. See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
12
Mineral Hill: a capital efficient growth platform
Strong operational performance; well-positioned for continued growth
• Delivery on the plan - Operating cash flow of $24m since
acquiring Mineral Hill January 2022 ($23m total consideration1)
• Resource growth - Since acquisition resources have grown by
64% to 140kt CuEq2
• Discovery potential - Significant progress made on exploration
and development initiatives, highly prospective tenure
• Critical minerals - NSW Government’s critical minerals grant of
$500k facilitating copper production in 2025
• Extending the Life of Mine (LOM) - incorporating open pit and
underground mining, targeting LOM > 5 years
• Existing infrastructure, approvals and people - the key to
driving value and shareholder upside
1. ASX : Mineral Hill transaction completion 18/1/2022; Acquisition of Mineral Hill Gold and Copper Mine 18/11/2021
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for additional Mineral Hill Resource and Reserve information.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
13
Strong cash flow from the Tailings Project
Successful transition from the Tailings Project to open pit and underground mining underway
• Focus on extracting high-grade in the remaining
months of the Tailings Project
• Production has significantly increased in March
after lower grades and recoveries were experienced
in February
Cumulative Operating Cashflow to 31 December 2023
A$m
$24m
22.5M
17.5M
• Demonstrated capability in mining, processing and
cash flow management
12.5M
• Skilled staff from the Tailings Project to be utilised
in open pit mining
7.5M
2.5M
www.kingstonresources.com.au I ASX: KSN
Nov-23
Sep-23
Jul-23
May-23
Mar-23
Jan-23
Nov-22
Sep-22
Jul-22
May-22
Mar-22
Jan-22
-2.5M
Capital Raising Presentation March 2024
14
Mineral Hill: strategic location in the Cobar Basin
Significant organic and regional resource growth opportunities
Abundance of gold-silver and polymetallic deposits within
trucking distance of Mineral Hill processing plant
Mineral Hill Overview
Wonawinta
Federation
Manuka
Aurelia
Location
516km W of Sydney NSW in Cobar Basin
Ownership
100%: 20 ML’s (4.85km2) and 2 EL’s (335km2)
Reserves (recovered)1,2
53,000 Oz AuEq (Tailings Project and open pit only)
Resources (recovered)1,2
795koz AuEq (140kt CuEq 40% Cu, 30% Au)
Orebody
Structure controlled polymetallic vein and epithermal Au
Mining Methods
Open pit and underground long-hole stoping
Water
Supplied from underground and site storage
Power
Mains with grid upgrade
Historical Production
396koz Au, 33kt Cu (plus Pb, Zn concentrate)
1. Copper equivalent calculated based on consensus commodity prices with adjustments based on company expectations. See
Appendix for equivalency calculations
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for additional Mineral Hill
Resource and Reserve information.
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
15
Refurbished plant scheduled for Q4 FY2024
Transforming Mineral Hill back to a hard rock mining operation
• All approvals in place
• Refurbishment on track
and on budget
• All major equipment
ordered and contractors
in place
• Crushing, grinding and
flotation to commence
in Q2 2024
• Initial feed of oxide ore
and dore production
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
16
Underground and open pit mining
Focus on extending 5-year mine life, producing both precious and base metals
Open pit mining
to commence in
Q2 2024
Underground
refurbishment is
well advanced
Calendar Year
2023
Underground
drilling
to commence
in Q4 2024
2024
Underground
mining to
commence later
in 2024
2025
2026
2027 +
Tailings Project
Open pit mining (Pearse)
Underground resource drilling
Underground mining (SOZ and Jack’s Hut)
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
17
Mineral Hill – Pearse open pit mining
High-grade gold ore with silver credits
• New pit at Pearse North and a cutback at Pearse
South
• Forecast of 258kt @ 3.72g/t gold and 57g/t silver
(at A$2571/oz price and AISC A$1,339)1. Reoptimisation at current gold prices underway
• All permits and approvals in place
• First blast scheduled for June 2024, mining over 11
months
• Spot metal pricing – material cash flow
opportunity with potential to transform the
balance sheet
• Setting up the transition to underground mining
1. See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions.
Pearse North and South pit designs
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
18
Mineral Hill – underground mining
Existing decline development minimises capital requirement to access high-grade ore
Long section of Southern Ore Zone looking east
•
Production target1 using the Southern Ore Zone (SOZ) and Jack’s Hut
• Existing decline development reduces capital expenditure
• Access to SOZ underground is complete – pumped out, bolted and
meshed, communication and primary ventilation operating
• Resource update and initial Reserve work due for completion in Q4 2024
• Jack’s Hut is highly prospective with potential to increase Mineral
Resources along the entire Mineral Hill trend
Underground longitudinal projection looking east – Jack’s Hut and Southern Ore Zone
Mineral Resource Estimate for the Southern Ore Zone, November 20222
Tonnes (Mt)
3.80
Au g/t
1.29 g/t
Ag g/t
19 g/t
Cu %
0.9%
Pb %
1.6%
Zn %
1.4%
Pb %
0.8%
Zn %
0.6%
Mineral Resource Estimate for the Jack’s Hut, 21 March 20232
Mineral Hill Trend – 2.5km strike length
1. See ASX Announcement dated 27 June 2023, $6.5m Capital Raising or Mineral Hill Production Expansion for key assumptions.
2. See ASX Announcement dated 24 November 2023 and 21 March 2023 for SOZ MRE announcements
www.kingstonresources.com.au I ASX: KSN
Tonnes (Mt)
1.60
Au g/t
1.25 g/t
Ag g/t
20 g/t
Cu %
0.9%
Capital Raising Presentation March 2024
19
Southern Ore Zone: underground
Multiple orebodies with significant potential for
extensions and new discoveries
• Near mine exploration to extend the underground
mine life
• KSNDDH017 - A New Discovery at Mineral Hill
• 12.5m @ 3.41% CuEq1
Existing
Mineral
Resource
Zone
• Near existing underground development
Potential
Mineral
Resource
Expansion
Zone
1. See ASX Announcement on 1 November 2023: Near mine discovery at Mineral Hill. CuEq = see the slide on Metal Equivalents
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
20
Advanced near mine development
plan
5
EL1999
Resource expansion strategy and near mine
exploration
• Five priority targets within the ML
• Focus on resource expansion and extending the
mine life
1
Southern Ore Zone (SOZ) Extension
2
South Aurum (Pearse Corridor)
3
Ashes Graben
4
Parkers Hill East
5
Bogong Prospect
www.kingstonresources.com.au I ASX: KSN
4
22
3
2.5km
EL1999
1
EL1999
Capital Raising Presentation March 2024
21
Upside opportunities
Resource expansion strategy and near mine exploration
EOZ high
grade Au
target
• Existing
development in
place
Parkers Hill
MRE update and
extensions
Red Terror
target
• Mineralisation
over 2.5km
• Multiple ore
bodies
GD140
target
SOZ MRE1
update
Jacks Hut
Infill & Extension
New Lode
Extension
G-H Lode Infill
1. MRE – Mineral Resource Estimate
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
22
Regional
exploration
Highly prospective
exploration tenure within
EL8334
• Coincident geophysical
features (gravity and
induced polarisation)
• Highly prospective
geology and regional
scale structures
• Lead-in-soil anomalies
adjacent to prospects in
neighbouring tenements
• The only operating
polymetallic processing
plant in southern Cobar
Basin
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
23
Misima
Gold Project
Capital Raising Presentation March 2024
24
Misima – definitive feasibility and ore reserve1
Large scale, long-life, low-cost open pit gold and silver mine
Misima Project
• 600km from Port Moresby
• DFS Complete
• Historically produced 4Moz AuEq over 15 years
• High leverage opportunity on the gold price
• DFS uses $1,800/oz gold price and 0.7 AUD:USD. Gold
price scenario of $2,000/oz lifts LOM NPV to $1.3bn
3.8Moz Gold
22.1Moz Silver
Resource
Resource
• Kingston is running a process to bring about value
realisation through a sale or JV
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
Poured gold
koz
Recovery
160
100%
Production at AISC
A$1,217/oz
140
120
95%
20-year life of mine
100
80
90%
60
40
85%
LOM Revenue $6.1bn
80%
LOM pre-tax FCF
20
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
Years
and
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
25
Summary: focus on executing our clearly defined strategy
Leveraging the existing gold-copper asset base while advancing future growth opportunities
Experienced management team focused on maximising
returns from Mineral Hill and Misima
Insert mining picture
Material expansion in cash flow with the commencement of
hard rock mining
Excavator/truck
Focused on growing resources and reserves, with potential to
expand processing plant production capacity and EBITDA
Strategic location of the Mineral Hill processing plant
provides options for adding regional inventory
Focused on growing revenue and cashflow from Mineral Hill
and pursuing value realisation alternatives from the Misima
Gold Project
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
26
Appendix
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
27
Building a safety culture and
establishing our ESG
framework
Investing in our people and
our community
Kingston is one of the largest
employers in Condobolin
Kingston’s ESG framework helps
us to operate in a safe, responsible
and sustainable way
Investing in our local and
residential workforce is good for
our business and our local Lachlan
Shire community
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
28
Exploration within EL1999
Multiple drill targets to be tested
• Several near mine targets with potential to
significantly expand contained copper and gold
• Lead is the primary pathfinder element for polymetallic
mineralisation
• Geochemical anomalies coincident with IP
chargeability anomalies
MLs
• Broadly aligned with magnetic lineaments and
domains
• Multiple untested targets
IP chargeability
EL1999
Cyprus Pines Cu geochemistry
Cyprus Pines Pb geochemistry
Au+ soil geochemistry
Subtle Pb-Zn-Bi soil geochemistry
Area of interest with multiple overlapping geochemistry and IP signatures
Axis of best in hole RAB geochemistry anomaly
Lithological unit boundary
EL boundary
ML boundary
Road
www.kingstonresources.com.au I ASX: KSN
Capital Raising Presentation March 2024
29
Mineral Hill Mine – Resources and Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources
• Polymetallic underground Mineral Resources
• Additional resource areas to be estimated in CY23 (Parker’s
Hill and Red Terror)
Total Probable Reserve Inventory
Deposit
Kt
Au (g/t)
TSF
1,171
1.07
Pearse South
140
4.00
84
18
Pearse North
120
3.40
25
13
1,431
1.6
57
71
TOTAL
www.kingstonresources.com.au I ASX: KSN
Ag (g/t)
Au (Koz)
Ag (Koz)
Total Mineral Resources
Deposit
Kt
Au
(g/t)
Ag
(g/t)
Cu
%
Pb
%
Zn
%
Au
(Koz)
TSF
1,171
1.07
0
40
Pearse South
204
3.77
70
25
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
34
60
54
456
Pearse North
239
2.97
25
23
190
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
470
TOTAL
8,901
1.13
26
1.0%
1.6%
1.1%
323
6,566
72
113
81
40
Capital Raising Presentation March 2024
30
Mineral Hill – Social Licence
Environmental and Social Licence to operate
• Stakeholder engagement – excellent relationship with landholders, community and Condobolin Chamber of Commerce
• Mining Licences (ML) granted
• Environment protection, cyanide and water permits in place
• Environmental Bonds in place with a staged payment schedule
• Development Applications (DA) approvals in place for tailings
(TSF), Pearse pits, SOZ underground
• Mine Operation Plan (MOP) in place for the tailings
retreatment and re-commencing hard rock mining
• Biodiversity offset in place, potential to increase offset
• Dam Safety NSW site review complete
• Tailings Dam strategy
• TSF1 currently being re-processed, approval will be sought
for re-use as tailings storage on completion
• TSF2 approved, lift 4 and 5 designed providing storage
capacity for 2.5 years
www.kingstonresources.com.au I ASX: KSN