Equity Raising Presentation
Released
Released
Announcement PDF
Step change in cash
flow with open pit
mining
Equity Raising
Presentation
Accelerating exploration to
expand Mineral Hill Gold and
Copper production
Drill to expand the
resource base
December 2024
Realise value with a
Misima transaction
ASX: KSN
Important notices and disclaimer
Forward Looking Statements
Mineral Hill Gold Bar
Certain statements contained in this presentation, including information as to the future financial or operating performance of KSN and its projects, are
forward looking statements. Such forward looking statements: include, among other things, statements regarding incomplete and uncertain proposals or
targets, production and prices, operating costs and results, capital expenditures, and are or may be based on assumptions and estimates related to future
technical, economic, market, political, social and other conditions; are necessarily based upon a number of estimates and assumptions that, while considered
reasonable by KSN, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies; and
involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or
results reflected in such forward looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements, whether as a result of new information, future events or results or
otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”, “intends”, “continue”, “budget”, “estimate”,
“may”, “will”, “schedule” and similar expressions identify forward looking statements. All forward looking statements made in this presentation are qualified
by the foregoing cautionary statements. Recipients are cautioned that forward looking statements are not guarantees of future performance and accordingly
investors are cautioned not to put undue reliance on forward looking statements due to the inherent uncertainty therein.
Disclaimer
No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and
conclusions contained in this presentation. To the maximum extent permitted by law, none of KSN, its directors, employees or agents, nor any other person
accepts any liability, including, without limitation, any liability arising out of fault of negligence, for any loss arising from the use of the information contained
in this presentation. In particular, no representation or warranty, express or implied is given as to the accuracy, completeness or correctness, likelihood of
achievement or reasonableness or any forecasts, prospects or returns contained in this presentation nor is any obligation assumed to update such
information. Such forecasts, prospects or returns are by their nature subject to significant uncertainties and contingencies.
The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or
other financial products. The information contained in this presentation is not investment or financial product advice and is not intended to be used as the
basis for making an investment decision. The presentation has been prepared without taking into account the investment objectives, financial situation or
particular needs of any particular person. Before making an investment decision, you should consider, with or without the assistance of a financial adviser,
whether an investment is appropriate in light of your particular investment needs, objectives and financial circumstances. Past performance is no guarantee
of future performance.
For further information on the Life of Mine at Mineral Hill referred to in this Presentation, refer to the Company’s ASX Announcement dated 27 June 2023 and
30 September 2024
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
2
Important notices and disclaimer
Exploration by Other Explorers
This presentation contains information sourced from the reports of other Explorers. References to the original reports are provided as footnotes where the information is cited in this
presentation. KSN does not vouch for the accuracy of these reports. KSN has taken the decision to include this information as it is in the public domain and as we assess it to be of relevance to
shareholders and investors.
Production Target
The LOM plan includes Mineral Resource Estimates for Pearse pits, the Southern
Ore Zone (SOZ) and Jack’s Hut to estimate the Production Target. All Ore
Reserves and Mineral Resources underpinning this LOM plan have been prepared
by Competent Persons in accordance with the 2012 JORC reporting guidelines.
The Production Target comprises 51% Ore Reserves, 11% Measured & Indicated
Resources and 38% Inferred Resources. The first 12 and 36 months of the
Production Target are underpinned by 89% and 80% of Measured and Indicated
Resources respectively
There is a low level of confidence associated with Inferred Mineral Resources and
there is no certainty that further exploration work will result in the determination
of Indicated Mineral Resources or that the production target itself will be realised.
The stated production target is based on the Company’s current expectations of
future results or events and should not be solely relied upon by investors when
making investment decisions. Further evaluation work and appropriate studies
are required to establish sufficient confidence that this target will be met. The
Company notes that the Project forecasts a positive financial performance and is
therefore satisfied that the use of Inferred resources in production target
reporting and forecast financial information is not the determining factor in
overall Project viability and that it is reasonable to report the LOM plan with
Inferred Resources.
The Company has concluded that it is has a reasonable basis for providing the
forward-looking statements included in this announcement. The detailed reasons
for that conclusion are outline throughout this presentation.
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
3
Table of Contents
1
Kingston Resources Overview
2
Equity Raising
3
Mineral Hill – NSW Gold/Copper Production
4
Misima – PNG Value Realisation
5
Appendix
6
Reserves and Resources
7
Key Risks
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
4
1. Kingston
Resources Overview
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
5
Kingston Resources overview
Vision
To become a mid-tier gold/copper miner with multiple producing assets
Cash flow from
open pit mining
Misima value
realisation
Mineral Hill Mine (100%) NSW
• Operating mine at 350-400ktpa with approvals in place to
operate at 700ktpa
• Currently producing gold and silver. Copper production in FY26.
• Initial six-year LOM plan at ~35kozpa (AuEq).
Plant expansion
potential
Exploration drilling
Misima Gold Project (100%) PNG
• Strategic process to realise value against backdrop of:
• Strength in gold price
• Increasing interest in PNG; and
• Recent track record of strong outcomes being achieved in
transactions involving material gold assets
• Entering the resource growth stage with exploration drilling to
underpin the doubling of production
• Historical production: 3.7Moz Au and 22Moz Ag
• 8Mt Resource base with multiple extension opportunities
• Mineral Resource 3.8Moz Au, Ore Reserve 1.9Moz Au
• Multiple high priority exploration targets
• 20-year mine life (DFS1)
• Growth options in Cobar Basin - operating polymetallic plant
with a CIL
• Pre-tax NPV A$956m, IRR 22% (base case gold price of
A$2517/oz). Pre-tax NPV of A$2.7bn at spot gold price
www.kingstonresources.com.au I ASX: KSN
1. See KSN ASX announcements on 6 June 2022 for further detail
Kingston Resources - Equity Raise Presentation - December 2024
6
Corporate snapshot
Shares on issue
1-Year Share Price Performance
Market Volume('000) RHS
707m
Warrants & options2,3
170.4m
Share price
$0.09
Market cap
$64m
Cash @ 30 Nov 20241
$5.0m
Restricted cash for environmental bond
$7.4m
Debt4
$15m
Close Price (A$) (LHS)
0.12
0.11
0.1
0.09
0.08
0.07
0.06
0.05
0.04
0.03
0.02
0.01
0
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
Shareholder Structure
Delphi 15%
Quintana 9.4%
Winchester 9.1%
Farjoy 6.7%
Other 59.8%
1. Estimated Cash balance, as at 30 Nov 2024, excludes $7.4m cash backed environmental bond.
2. 38m unlisted options @ $0.14, exp 31 July 25.
3. 25m unlisted warrants @ $0.0846, exp 07 July 2027, 35.7m unlisted warrants @ $0.0846 exp 29 June 2028. 69.7m unlisted
warrants @ 0.118 exp 23 Feb 2028.
4. Debt payback - $5m matures 7 July 2026, $5m matures 23 February 2027,$5m matures 29 June 2027
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
7
Highly experienced and well-regarded Executive Team / Board
Significant experience across the development life cycle through to production
Mick Wilkes
Andrew Corbett
Tony Wehby
Stuart Rechner
Non-Executive Chairman
Managing Director
Non-Executive Director
Non-Executive Director
Mick is a seasoned mining
professional with 35 years’
experience in the industry,
primarily in gold and base
metals. He has specialised in
sustainable project
development, construction, and
operations throughout his
career.
Andrew is a highly experienced
mining engineer with over 25
years in mine management and
financial markets. His
operational experience has
included senior management
roles with contractor and ownermining operations. He was also
previously Co-Portfolio Manager
of the Global Resource Fund at
Perpetual Investments.
Tony is a highly experienced
board member and chairman,
previously Non-Executive
Chairman of Tellus Resources
Limited and Aurelia Metals
Limited, and a Director of
Ensurance Ltd.
Stuart is an experienced
company director and geologist
with a background in project
generation and acquisition in
Australia and overseas. Mr
Rechner holds degrees in both
geology and law.
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
8
Key achievements
Building the Company’s operating capability to enable scaling of the business
• Self managing – in-house planning and execution to meet delivery at all stages of the mining cycle
• Self performing – owner-operator focused, with local employment and a problem-solving attitude
TSF Mining
Complete
• Kingston’s first cash
producing asset
• Reprocessed 1.6 Mt of
tailings
• Generated $99m in sales
and $26m in operating
cashflow
Plant Refurbishment
Complete
Open Pit Mining
Commenced
Underground Mining
Preparations
• Refurbishment of the
Mineral Hill process
plant for $13.5m
• Recommenced hard
rock mining in June 2024
• Underground drilling to
commence in Jan 2025
• Mining rate now
meeting plant
nameplate
• High value, polymetallic
orebodies
• Independently managed
and executed
• High capital efficiency
• Locally employed
mining team trained up
• The long-term future of
Mineral Hill
Potential to lift production and underpin a long term precious and base metals business
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
9
2. Equity Raising
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
10
Equity Raising Summary
Equity Raising will fund surface and underground exploration. Cash flow from Mineral Hill open pit mining to be
dedicated to expansion projects
Offer size and
structure
• c.A$8.4 million institutional Placement (“Placement”) at A$0.075 per share (“Offer Price”)
• The Placement will consist of the issue of a total of c. 85 million shares (“New Shares”) utilising the
Company’s existing placement capacity under ASX Listing Rules 7.1 and 7.1A
• The Company will also conduct a Share Purchase Plan (“SPP”), raising up to A$2.0 million at the same price
as the Offer Price
Placement
pricing
• New Shares will be issued at the Offer Price, which represents a discount of:
• 16.7% to the last closing price of A$0.09 per share on 5 December 2024
• 17.1% discount to the 15-day VWAP of A$0.09 as at 5 December 2024
Use of proceeds
• Proceeds will be used to fund surface and underground exploration drilling at Mineral Hill with a view to
facilitating expansion of Mineral Hill gold/copper production.
Ranking
• New Shares issued under the Placement will rank equally in all respects with existing ordinary shares
Syndicate
• Blue Ocean Equities Pty Ltd is acting as Lead Manager and Bookrunner for the Placement
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
11
Indicative Equity Raising Timeline
Event
Date
Trading halt - Placement Offer opens
6 December 2024
Record date for the SPP
6 December 2024
Trading Halt lifted, trading resumes
9 December 2024
Settlement of New Shares issued under the Placement
13 December 2024
Allotment of New Shares issued under the Placement
16 December 2024
SPP offer Opening Date
16 December 2024
SPP offer Closing Date
15 January 2025
Allotment of securities issued under SPP
22 January 2025
Allotment of securities issued under SPP
23 January 2025
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
12
Sources and Uses of Funds (excl. Op. Cash Flow from Pearse)
Equity Raising to accelerate exploration with a view to leveraging the Mineral Hill plant and targeting a doubling
of gold/ copper production
Multilple valuation drivers: free cash flow, drilling,
Misima process
• The Equity Raising will accelerate the exploration strategy at
Mineral Hill to grow the resource base and underpin our target to
double production.
• Along with the Equity Raising proceeds, production from the
Pearse open pits is expected to generate material free cash flow
in CY2025.
• Value realisation from a successful Misima transaction provides
the opportunity to further transform the Kingston balance sheet.
• The versatile processing plant provides strategic options to
expand within the Cobar region (three concentrates and dore).
• The Mineral Hill plant is currently operating at 350-400ktpa.
Approved to produce at 700ktpa.
Sources of Funds (excl. Op. Cash Flow from Pearse)
A$m
Placement proceeds
$6.4
SPP Proceeds
$2.0
Cash estimated as at 30 Nov 2024
$5.0
Total Sources of Funds
(excl. Op. Cash Flow from Pearse)
$13.4
Uses of Funds (excl. Op. Cash Flow from Pearse)
A$m
Underground resource development drilling
$2.0
Underground exploration drilling
$2.0
Regional surface drilling
$3.0
Working capital
Total Uses of Funds
$6.4
$13.4
Strategy to transform the Kingston balance sheet
and position the company for regional expansion
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
13
Pearse North November 2024
3. Mineral Hill
Gold and Copper Mine
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
14
Kingston extends Mineral Hill Mine life out to 2030
Six-year mine life extension with updated Ore Reserves 1,2
• Extended Mine Life: Life of mine now six
years, extended to +2030.
• Increased Ore Reserves: Increased open pit
Ore Reserves, plus maiden underground Ore
Reserves.
• Owner Mining: Focused on local employment,
with a hands-on training approach to develop
our own operators.
• Approved and operating mine: Leveraging
the fully approved mine, multi commodity
plant to grow our production and cashflow.
1. See ASX Announcement dated 2 April 2024 , 27 June 2023 & 30 Sept 2024, for further detail and key assumptions
2. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Pearse North open pit mining operations
Kingston Resources - Equity Raise Presentation - December 2024
15
Open pit mining – Pearse North
Pearse North mining commenced in late June 2024 – mining rate now > 3Mtpa
80000
70000
60000
50000
40000
30000
20000
10000
0
3 June
10 June
17 June
24 June
1 July
8 July
15 July
22 July
29 July
5 Aug
12 Aug
19 Aug
26 Aug
2 Sep
9 Sep
16 Sep
23 Sep
30 Sep
7 Oct
14 Oct
21 Oct
28 Oct
4 Nov
11 Nov
18 Nov
Tonnes (ore and waste)
60-70k tonnes trucked per week = 3Mtpa of ore and waste
Weeks
Tonnes Mt
Grade
Au g/t
Grade
Ag g/t
Pearse North
0.24
3.2
33
24
250
Pearse South
0.13
4.3
85
19
370
Total Open Pits
0.37
3.6
52
43
620
Reserve*
Metal Au Metal Ag
koz
koz
* Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
1. See ASX Announcement dated 30 September 2024
www.kingstonresources.com.au I ASX: KSN
Pearse North and South pit designs
Kingston Resources - Equity Raise Presentation - December 2024
16
Maiden underground ore reserve
Significantly improved metallurgy resulting in
more payable metal
• Copper and gold recovery increased to 88% and 81%
respectively2.
• LOM AuEq payable ounces increased from 123koz to 200koz.
• Existing underground development and flotation plant
minimises capital costs.
Southern Ore Zone Underground Mineral Resources3
Class
Tonnes
Mt
Cu
%
Pb
%
Zn
%
Au
g/t
Ag
g/t
Cu
kt
Pb
kt
Zn
kt
Au
koz
Ag
koz
Total
3.78
1.0
1.3
1.1
1.83
17 37
51
40
222 2,038
Southern Ore Zone Underground Ore Reserve3
Class
Probable
1.
2.
3.
Tonnes
Mt
Cu
%
Pb
%
Zn
%
Au
g/t
Ag
g/t
Cu
kt
Pb
kt
Zn
kt
Au
koz
Ag
koz
0.7
0.8
1.9
1.6
1.4
20 5.5
13
11
30
450
See ASX Announcement dated 30 September 2024
In comparison to the 30 September 2024 ASX Production Target forecast to the 27/06/2023 ASX Production Target.
Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric tonnes.
www.kingstonresources.com.au I ASX: KSN
Long-hole open stopes
Oblique view of the Southern Ore Zone planned stopes
Kingston Resources - Equity Raise Presentation - December 2024
17
Increase scale at Mineral Hill
Strategy on expanding Mineral Resources within the mine
GD140
target
EOZ high
grade Au
target
Plan:
• Underground drilling
at SOZ
• Update Mineral
Resource estimates
Red Terror
target
• Extend the LOM
Jacks Hut
Infill & Extension
SOZ MRE1
update
12.5m @
3.41% CuEq
Underground Mineral Resource Estimates2
Resource
Tonnes (Mt)
Cu %
Pb %
Zn %
Au g/t
Ag g/t
Southern Ore Zone
3.78
1.0
1.3
1.1
1.83
17
Jack’s Hut
1.60
0.9
0.8
0.6
1.25
20
Parker’s Hill
1.80
1.3
2.1
0.9
0.19
43
Total Underground
7.3
1.0
1.4
0.9
1.28
24
1. SOZ – Southern Ore Zone, MRE – Mineral Resource Estimate
2. See ASX Announcement dated 21 March 2023 and 30 September 2024 for MRE announcements
www.kingstonresources.com.au I ASX: KSN
Parkers Hill
MRE update
and extensions
G-H Lode Infill
New Lode
Extension
Kingston Resources - Equity Raise Presentation - December 2024
18
Add projects within trucking distance to Mineral Hill
Mineral Hill is the only processing facility in the southern Cobar Basin
Grow resources to expand grinding and flotation
700
Approved
for
700ktpa
380
Current
Expansion Potential
Resource growth strategy
Mineral Hill
Extensions
Regional
Acquisition
Increase
grinding &
flotation
capacity
Regional Exploration
EL8334
www.kingstonresources.com.au I ASX: KSN
1. See ASX Announcement dated 2 April 2024 & 27 June 2023, for further detail and key assumptions
Kingston Resources - Equity Raise Presentation - December 2024
19
on EL8334
4
Adding inventory with near mine
exploration
5
EL1999
Near mine advanced targets
• Underground drilling to commence in Q1 2025.
• Resource growth opportunities within the ML.
• Focus on extending the mine life.
• Grow high margin feed stock adjacent to the plant.
2.5km
3
1
SOZ infill & extension drilling.
2
Parkers Hill – GD140 resource updates.
3
Jacks Hut and EOZ extensions.
4
Bogong target – drilling.
5
Regional exploration on EL8334- Webers Gossan Long
Panel and China Workings.
2
EL1999
www.kingstonresources.com.au I ASX: KSN
1
Kingston Resources - Equity Raise Presentation - December 2024
EL1999
20
Grow the operating scale with regional exploration
Highly prospective drill targets and geochemical signatures
Shift to creating value with
exploration
• Extension potential within the ML
• Near mine targets within EL1999
(Bogong target)
Advancing untested targets in
EL8334
• Kingston’s ELs highly prospective
• Targeting Mineral Hill repeats and
Federation style deposits
• Extensive lead-in-soil anomalies
• Coincident geophysical anomalies
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
21
Exploration potential at depth and regionally
Mineral Hill remains open at depth and along the regional trends
Extension potential
at depth and
regionally:
• Depth of drilling at
Mineral Hill less
than 500m depth
• Key mineral
deposits in Cobar
extend to ~1.8km
• Numerous
regional targets on
Kingston’s
exploration tenure
13km
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
22
Misima Gold Mine – circa 1995
4. Misima
Gold Project
Kingston Resources - Equity Raise Presentation - December 2024
23
Misima – high value growth asset
Large scale, long-life, low-cost open pit gold and silver mine
• Forecasting 128koz gold per annum over 20-years
Item
• Base case NPV of A$956m1 (US$1,800/oz gold price)
Unit
Base
Spot
Gold Price
USD/oz
US$1,800/oz
US$2,700/oz
• Gold price scenario of $2,700/oz lifts NPV to $2.7bn
Exchange Rate
AUD:USD
US$0.70
US$0.66
• Formal process being managed by Argonaut to bring
about value realisation
LOM Revenue
A$m
6,116
9,730
LOM Free Cash Flow (pre-tax)
A$m
2,726
6,367
• Potential transaction to crystallise asset value and
allow Kingston build additional value in the Cobar Basin
NPV (7% real) pre-tax
A$m
956
2,696
NPV (7% real) post-tax
A$m
624
1,859
IRR pre-tax
%
22%
46%
IRR post-tax
%
18%
37%
SIMBERI
6
PNG Mines and Projects
Estimated Gold Endowment
AuEq Moz
66
LIHIR
17
FRIEDA RIVER
24
PORGERA
17 OK TEDI
23 PANGUNA
KAINANTU
2
DFS Highlights
27
WOODLARK
WAFI-GOLPU
HIDDEN VALLEY
4
Papua
New Guinea
TOLUKUMA
2
PORT
MORESBY
www.kingstonresources.com.au I ASX: KSN
2
1.6
GOLD RIDGE
2.4Moz
7
Misima
1. See KSN ASX announcements on 6 June 2022 for further detail
LOM gold
production
128koz pa
average gold
production
(yrs 2-18)
$2.7bn
pre-tax FCF
20-year
mine life –
production target
Kingston Resources - Equity Raise Presentation - December 2024
24
Exploration Upside Potential and Site Layout
• Potential for additional high-grade
inventory by targeting the Umuna
corridor.
485,000
475,000
Abundant Exploration Targets
480,000
Excellent infrastructure and proven accessibility
N
8,825,000
• Extension potential at depth and along
strike.
• New discovery potential between
Ewatinona pit and process plant location
(Abi-Kila).
8,820,000
Misima Gold Project Plant Layout
• Simple layout, utilising previous plant
location.
• Leveraging existing land topography and
historical footprint.
Exploration prospects and targets relative to proposed mining and processing infrastructure locations.
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
25
Misima Project history
5
High leverage to the gold price
4
Gold Price
3
$2,500.00
2
1
2017 - KSN
commences
Misima earn-in
$2,000.00
2019 – KSN
completes
100%
ownership
2021
Resource
grows to
3.8Moz
KSN initiates
sale/JV
process
2022
Misima
DFS
5
4
3
2
$1,500.00
1
1988
Commencement of
mining
$1,000.00
2004
Misima
decommissioned by
Placer Dome
Placer Dome Mining Period
4.0Moz AuEq over 15 years
$500.00
$0.00
1970 1972 1974 1976 1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
26
Summary: Focus on executing our clearly defined strategy
Leveraging the existing gold-copper asset base while advancing future growth opportunities
Experienced Management Team: Focused on multiple value
drivers; Mineral Hill cash flow, exploration and Misima value
realisation
Prime Cobar Basin Location: Accelerating drilling of highly
prospective copper & gold targets
Free cash flow from Mineral Hill: Expanding cashflow and
production from open pit mining and moving into
underground mining
Strategic Advantage: Fully approved and operating
processing plant with multiple drill targets and growth
options
Misima Gold Project: Formal strategic process provides
potential for material transformation of the balance sheet
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
27
Appendix
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
28
Mineral Hill – social license
Environmental and social licence to operate
Permits in place for mining and processing
Cash backed environmental bonds
Tailings capacity in place and expansion plans scheduled
Biodiversity offset established
www.kingstonresources.com.au I ASX: KSN
Kingston Resources - Equity Raise Presentation - December 2024
29
Competent Person Statement
Competent Person’sStatement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
Competent Person’sStatement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on and fairly represents,
information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a Member of the Australian
Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited. Mr. Hayward has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Hayward confirms that the information in the market announcement provided is an accurate representation of the available data
and studies for the material mining project and consents to the inclusion in this report of the matters based upon the information in the form and
context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings are presented have not
been materially modified from the original report.
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly represents, information
and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a Member of the Australian Institute of
Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources Limited. Mr. Hayward has sufficient experience relevant to the
style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward
confirms that the information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form and context in which it
appears. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially
modified from the original report.
Competent Person’sStatement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
Competent Person’sStatement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward (BAppSc (Geology))
MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston Resources Limited. Mr Hayward has
sufficient experience in the style of mineralisation and types of deposit under consideration and to the activity he is undertaking to qualify as a
Competent Person as defined in the 2004 Edition of the ‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr. Hayward confirms that the information in the market announcement provided is an accurate representation of the available data
and studies for the material mining project and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears. All Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004 and are an accurate
representation of the available data and studies for the Mineral Hill Mine. This information has not been updated since to comply with the JORC
Code 2012 on the basis that the information has not materially changed since it was last reported. Work will commence on close of acquisition by
the Company to bring each of the Mineral Resourcesinto line with the JORC Code 2012.
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian Mine Design and
Share your feedback
Discover