Mineral Hill Operational Update & Capital Raising
Kingston Resources Limited (ASX: KSN) (Kingston or the Company) provides the
following update on the mining operations at Mineral Hill, a planned drilling program and
capital raising.
Pearse South Open Pit Update
On 1 June 2026, site personnel identified a wall failure in the Pearse South open pit. As
tension cracks were visible in the access ramp open pit mining was immediately
suspended. All personnel were kept safe and all equipment was removed from the pit.
Over the subsequent days, the tension cracks continued to open resulting in vertical
slumping of the access ramp, rendering it unsafe for use. Due to the limited scale of the
pit there is only one access ramp.
This is the second geotechical incident at the Pearse South open pit. The first incident
occurred in late 2025 in the northern end of the pit.1
The Pearse South open pit was
scheduled to be mined for another four (4) months and produce approximately 100,000
tonnes of ore before closure.
Kingston has undertaken an intensive technical assesment of the incident, including
engaging external geotechnical experts. The instability has been attributed to a soft
graphitic shale recently uncovered in the base of the pit that has interacted with
structures and been exacerbated by rainfall. Use of the existing ramp has been deemed
unsafe. Before any re-entry to the pit can be considered, stabilisation of the ramp and
impacted area is required. Potential remediation options would take several weeks and a
ramp redesign would sterilise a material amount of the remaining ore.
Kingston has evaluated the potential restart of mining the Pearse South open pit and it is
now evident that the risks and costs of regaining access outweigh the benefits of mining
the remaining ore at this time. The graphitic shale has also been attributed with poor
metallurgical recoveries during the quarter.
On this basis, Kingston will not resume mining the Pearse South open pit.
See Appendix A for images of the Pearse South pit.
Mineral Hill Strategic Pivot
After careful consideration of the optimal approach to realising the value of the Mineral
Hill underground and having regard to the cashflow impact of mining cessation at Pearse
South, the Kingston Board has made the decision to pause underground development
and delay commencement of underground production in favour of undertaking an
intensive resource and near mine exploration drilling program.
1
See KSN ASX announcement dated 22 January 2026 - KSN Quarterly Activities Report 31 December 2025.
11 June 2026
KINGSTONRESOURCES.COM.AU | ASX: KSN 2
Mineral Hill's long-term value has always been centred on realisation of the high grade
polymetallic underground deposits via the fully approved processing plant located in the
highly prospective Cobar basin.
The Company’s immediate work plan comprises:
• 25,000m of infill and extensional drilling – utilising a full-time underground
diamond rig with surface diamond and RC rigs for step-out drilling focused on
o Southern Ore Zone (SOZ) – extensions in G/H Lode and Upper A Lode areas.
o SOZ Footwall discovery and further depth extensions.
o Jack’s Hut – down-dip and along strike extensions.
o Jack’s Hut-Iodide Link Zone – southern continuation of Jack’s Hut.
o Jack’s Hut – EOZ Link Zone – test near-surface potential.
o Parker’s Hill East – test potential new target.
• Mineral Resource updates – for the Southern Ore Zone (SOZ) and Jack’s Hut to
grow the underground Measured and Indicated Resources;
• Plant expansion studies – to evaluate and support an expanded operation
targeting 700ktpa ; and
• Delivery of a larger Ore Reserve - to support underground mining and processing
plant restart and underpin the future expansion potential of Mineral Hill.
The work plan is designed to grow the underground Mineral Resource and Ore Reserves
to support a larger operation with an extended mine life, and a clear pathway to increase
the production rate.
Figure 1: View of the Mineral Hill underground deposits with key extensions targets highlighted.
KINGSTONRESOURCES.COM.AU | ASX: KSN 3
Figure 2: Plan map of drill targets.
People Impact
As part of Kingston’s strategic pivot, the Company staffing requirements will materially
change. Kingston will retain approximately 24 site personnel for an interim period with
approximately 120 redundancies and the loss of 18 contractors. Employee entitlements
and redundancies will be paid in full and the Company will support personnel with the
transition. Kingston is working closely with all impacted employees and providing regular
updates. Kingston recognises that this situation will impact many people and we are
committed to supporting all employees through this period. An Employee Assistance
Program (EAP) is available for confidential counselling and support.
Cashflow Impact
The estimated costs of the open pit closure, redundancies and fleet demobilisations are
estimated at $5 million over the coming months. The Pearse South open pit closure has
resulted in an estimated gross revenue reduction of approximately $39 million through
the June to September period.
The Company confirms it currently has $9.45 million in unrestricted cash and will receive
a $10 million cash payment in July via deferred consideration from the sale of the Misima
Gold Project2
. The Company also holds $7.4 million in restricted cash for the
environmental bonds.
2
See KSN ASX announcement dated 11 July 2025 – Kingston Receives $50 million from Misima Divestment.
KINGSTONRESOURCES.COM.AU | ASX: KSN 4
Strategic Value
Mineral Hill continues to hold strategic value, it is fully permitted, with processing
(flotation & CIL), and multi-metal production capability. Located in the proven NSW
mining district, Mineral Hill benefits from established infrastructure being one of only two
polymetallic plants in the region. Kingston intends to undertake engineering studies on
a potential plant expansion up to 700ktpa during FY27, following the commencement of
a ~25,000m drilling program to unlock the maximum value from its existing
infrastructure and strategic location.
Figure 3: South Cobar map with operating processing plants.
KINGSTONRESOURCES.COM.AU | ASX: KSN 5
Capital Raising
To support the strategy and new work plan, Kingston is undertaking a capital raising to
raise approximately $11.6 million (before cost), comprising:
• a firm commitment for a $2.55 million placement (before costs) to investors
including Kingston’s largest shareholder Farjoy via the issue of approximately 36.4
million new Kingston shares at an issue price of $0.07 per share (Issue
Price)(Placement); and
• an fully underwritten non-renounceable entitlement offer to raise approximately
$9.1 million (before costs) via the issue of approximately 129.5 million new Kingston
shares at the Issue Price (Entitlement Offer), (the Placement and Entitlement
Offer together, the Capital Raising).
The Placement shares will be issued under the Company’s existing capacity to issue
securities under ASX Listing Rule 7.1.
The Issue Price represents a:
• 19.5% discount to the last closing price of $0.087 as at 1 June 2026; and
• 18.9% discount to the 5-day VWAP of $0.086 up to and including 1 June 2026.
Kingston will offer the opportunity to participate in the Entitlement Offer on the basis of
two (2) new Kingston shares for every thirteen (13) existing Kingston shares held at the
record date.
Only Kingston shareholders with a registered address in Australia, New Zealand, the
European Union (excluding Austria), Hong Kong and Singapore will be eligible to
participate in the Entitlement Offer (Eligible Shareholders).
The proposed record date for the Entitlement Offer is 5:00pm AEST on Tuesday, 23 June
2026 (refer to the Indicative Timetable set out below for further information).
The Entitlement Offer is non-renounceable, meaning that the rights cannot be traded on
the ASX and are not otherwise transferable. New shares issued under the Placement and
Entitlement Offer will rank equally with the Company’s existing shares.
Further information on the Entitlement Offer will be contained in an offer booklet,
scheduled to be despatched to Eligible Shareholders on Friday, 26 June 2026. Eligible
Shareholders should consider the offer booklet carefully before deciding whether to
participate in the Entitlement Offer and consult with their professional advisers if they
have any queries.
Argonaut Corporate Finance Limited (Argonaut) has agreed to fully underwrite the
Entitlement Offer pursuant to an underwriting agreement entered between Argonaut
and the Company. The obligations of Argonaut to underwrite the Entitlement Offer are
subject to the satisfaction of certain conditions precedent. A summary of the conditions
precedent and termination events is set out in Annexure 1 to this announcement.
KINGSTONRESOURCES.COM.AU | ASX: KSN 6
In addition, Farjoy has agreed to sub-underwrite the Entitlement Offer up to a maximum
of $8.0 million. Mick Wilkes, the Chairman and Stuart Rechner, Non-Executive Director
have committed to take up their entitlements in full, representing approximately 0.9
million shares for approximately $65k.
The Offer Booklet will contain a shortfall dispersion policy which will include the ability of
Eligible Shareholders to apply for additional shares, subject to pro rata scale-back relative
to the applicant’s shareholding if the applications by Eligible Shareholders for additional
shares is oversubscribed, and, if determined appropriate, based on the quantum of any
remaining shortfall, an institutional placement undertaken by the underwriter to
institutional/exempt investors (at the discretion of the Company), prior to allocation to
sub-underwriters and then the underwriter pursuant to the underwriting agreement.
Farjoy presently has an interest in approximately 17.6% of the shares in the Company, and
following the Placement will have an interest in approximately 19.7% of the shares in
Kingston on an enlarged basis post the Placement. If no Eligible Shareholders were to
take up their entitlements and the maximum shortfall of $8.0 million was allocated to
Farjoy, the maximum voting power of Farjoy would increase to approximately 28.5%.
Use of Proceeds
The Capital Raising proceeds will be applied towards drilling, delivering Mineral Resource
and Ore Reserve updates, redundancy and fleet demobilisation costs, care and
maintenance costs and general working capital purposes.
Sources
Current Cash - 11 June 2026 $m 9.4
Placement Proceeds (before costs) $m 2.5
Entitlement Offer Proceeds (before costs) $m 9.1
Deferred Cash Consideration – 11 July 20263
$m 10.0
Total Sources $m 31.0
Uses
Drilling & Plant Expansion Studies $m 12.2
Redundancy & Fleet Demobilisation Costs $m 5.0
C&M Costs $m 6.7
Capital Raising Costs $m 0.8
Working Capital & Corporate $m 6.3
Total Uses $m 31.0
3
See KSN ASX announcement dated 11 July 2025 – Kingston Receives $50 million from Misima Divestment.
KINGSTONRESOURCES.COM.AU | ASX: KSN 7
Capital Structure on Completion of the Capital Raising
Upon completion of the Capital Raising, the Company’s indicative capital structure is set
out below, subject to rounding and reconciliation on Entitlements:
Capital Structure
Pre-Capital
Raising
Post-Capital
Raising
Share Price $/sh 0.070 0.070
Existing Shares on Issue m 841.9 841.9
Shares Issued under Placement m 36.4
Shares Issued Under Entitlement Offer m 129.5
Shares on Issue Post Completion m 841.9 1,007.9
Options on Issue m 25.4 25.4
Warrants on Issue m 130.4 130.4
Total Options and Warrants m 155.8 155.8
Implied Market Capitalisation (Undiluted) $m 58.9 70.6
Cash $m 9.4 21.1
Debt (Equipment Loans) $m 6.0 6.0
Enterprise Value $m 55.5 55.5
Deferred Misima Payment
To be received on 11 July 2026 $m 10
Indicative Timetable
Event Date
Announcement of Placement and Intention to undertake
Entitlement Offer, Lodgement of Appendix 3B with ASX
Thursday, 11 June 2026
Lodgement of Offer Booklet, Appendix 3B and Notice under section
708AA(2)(f) of the Corporations Act for Entitlement Offer
Thursday, 18 June 2026
Ex Date for Entitlement Offer Monday, 22 June 2026
Record Date for Entitlement Offer (7:00pm AEST) Tuesday, 23 June 2026
Settlement of Placement Wednesday 24 June 2026
Lodge Appendix 2A and Cleansing Notice under Section 708A for
Placement
Thursday, 25 June 2026
Offer Booklet and Application Forms Dispatched to Eligible
Shareholders and Announcement of Dispatch
Opening Date of the Entitlement Offer
Friday, 26 June 2026
Last Day to Extend the Closing Date o f the Entitlement Offer Thursday, 2 July 2026
Entitlement Offer Closes (5:00pm AEST) Tuesday, 7 July 2026
Shares for Entitlement Offer quoted on a Deferred Settlement Basis Wednesday, 8 July 2026
Entitlement Offer Shortfall Notice Deadline Date Thursday, 9 July 2026
Last Day for the Company to Issue the shares under the Entitlement
Offer and Lodge an Appendix 2A
Tuesday, 14 July 2026
Note: The timetable shown is indicatively only and subject to change.
KINGSTONRESOURCES.COM.AU | ASX: KSN 8
Advisers
Argonaut is acting as Underwriter in respect of the Entitlement Offer. Argonaut Securities
Pty Ltd is acting as Lead Manager on the Capital Raising. HopgoodGanim is acting as legal
adviser to the Company on the Capital Raising.
Kingston Resources Managing Director and CEO, Andrew Corbett comments:
“These are disappointing circumstances for the Company as we were preparing to realise
the value of the work we had put in to developing the Mineral Hill operation for over four
years. The safety of our people is our highest priority and not something we will
compromise.
I want to acknowledge and apologise for the impact on our local stakeholders,
shareholders, employees and the township of Condobolin. The Kingston board has made
a difficult decision which will ensure value protection for shareholders and provide the
basis of a long-life mining operation at Mineral Hill.
We remain committed to Mineral Hill and the local community.
Importantly, the underground has always been the long-term future of Mineral Hill, and
we are now moving at speed to expand the Resource and Reserves and overall potential
of the underground operations. We are confident this is the best strategy to build a
stronger, more resilient Mineral Hill that delivers lasting value for our shareholders, our
people and our local communities.”
This new direction provides an opportunity to reset and realise the full potential of
Mineral Hill through the drill-bit. We are undertaking the first large-scale exploration
program since the 1980’s, providing the pathway to materially increase our underground
resource and reserve base and derisk the restart of an enlarged, long-life copper and
gold focused operation at Mineral Hill.
Our vision is to expand the Mineral Hill processing rate towards 700ktpa and beyond to
realise the full potential of our assets and this work plan will assist us to deliver on this
vision”
This release has been authorised by the Kingston Resources Limited Board.
For all enquiries, please contact Managing Director, Andrew Corbett, on +61 2 8021
7492.
KINGSTONRESOURCES.COM.AU | ASX: KSN 9
Appendix A: Pearse South Pit Images
Figure 3: Pearse South Open Pit – Southwest area (red box) shows the area of the new geotechnical incident.
Northern area (blue box) shows the area of previous geotechnical incident.
KINGSTONRESOURCES.COM.AU | ASX: KSN 10
Figure 4: Pearse South Open Pit – ramp cracks and vertical displacement
KINGSTONRESOURCES.COM.AU | ASX: KSN 11
Mineral Resources and Ore Reserves
Mineral Hill JORC (2012 Ed.) Mineral Resource and Ore Reserve.
Resource
Category
Tonnes
kt
Grade Metal
Au Cu Pb Zn Ag Au Cu Pb Zn Ag
g/t % % % g/t koz kt kt kt koz
Measured 327 1.90 1.20 0.54 0.33 10 20 4 2 1 109
Indicated 5,658 0.76 1.06 1.69 1.04 32 138 58 93 57 6,083
Inferred 3,999 1.10 0.84 1.13 0.95 21 142 33 45 37 2,661
Total 9,984 0.93 0.97 1.42 0.98 28 300 95.2 139.3 95.4 8,853
Reserve
Category
Tonnes Au Cu Pb Ag Zn Au Cu Pb Zn Ag
kt g/t % % g/t % koz kt kt kt koz
Proved - - - - - -
Probable 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
Total 700 1.40 0.80 1.90 1.60 20 30 6 13 11 450.0
1. Due to rounding to appropriate significant figures, minor discrepancies may occur, tonnages are dry metric
tonnes.
2. Probable Ore Reserves are derived from Indicated Mineral Resources.
3. The Ore Reserves do not include, or depend upon, Inferred Mineral Resources.
4. The Ore Reserves form part of the Mineral Resources.
Competent Persons Statement and Disclaimer
The information in this report that relates to Exploration Results and Mineral Resources is
based on information compiled by Mr. Stuart Hayward BAppSc (Geology) MAIG, a
Competent Person who is a member of the Australian Institute of Geoscientists. Mr.
Hayward is an employee of the Company. Mr. Hayward has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves”. Mr. Hayward confirms that the information in the market announcement
provided is an accurate representation of the available data and studies for the material
mining project and consents to the inclusion in this report of the matters based upon the
information in the form and context in which it appears.
The Competent Person signing off on the overall underground SOZ Ore Reserves
Estimate is Mr Steven Weckert BE ME (Min) CP, of Australian Mine Design and
Development Pty Ltd, who is a Member of the AusIMM and who has sufficient relevant
experience in operations and consulting for underground metalliferous mines. Mr
Weckert consents to the inclusion in this report of the information pertaining to the
Mineral Hill SOZ Ore Reserve in the form and context in which it appears.
The Mineral Hill Mineral Resource estimates included in this announcement were
released in ASX announcements on 15 March 2023 (Pearse South), 21 March 2023 (Jack’s
Hut) and 13 November 2025 (Southern Ore Zone, Red Terror and Parkers Hill). The Ore
Reserve estimate outlined below was released in ASX announcements on 30 September
2024 (Southern Ore Zone). Further information is included within the original
announcements.
KINGSTONRESOURCES.COM.AU | ASX: KSN 12
Kingston is not aware of any new information or data that materially affects the
information included in this announcement. All material assumptions and technical
parameters underpinning the Mineral Resource estimates and production targets
continue to apply and have not materially changed.
Forward Looking Statements
Certain statements contained in this announcement, including information as to the
future financial or operating performance of KSN and its projects, are forward looking
statements. Such forward looking statements: include, among other things, statements
regarding incomplete and uncertain proposals or targets, production and prices,
operating costs and results, capital expenditures, and are or may be based on
assumptions and estimates related to future technical, economic, market, political, social
and other conditions; are necessarily based upon a number of estimates and assumptions
that, while considered reasonable by KSN, are inherently subject to significant technical,
business, economic, competitive, political and social uncertainties and contingencies; and
involve known and unknown risks and uncertainties that could cause actual events or
results to differ materially from estimated or anticipated events or results reflected in such
forward looking statements.
KSN disclaims any intent or obligation to update publicly any forward-looking statements,
whether as a result of new information, future events or results or otherwise. The words
"believe", "expect", "anticipate", "indicate", "contemplate", "target", "scope", "plan", "intends",
"continue", "budget", "estimate", "may", "will", "schedule" and similar expressions identify
forward looking statements. All forward looking statements made in this announcement
are qualified by the foregoing cautionary statements. Forward looking statements are not
guarantees of future performance and accordingly investors are cautioned not to put
undue reliance on forward looking statements due to the inherent uncertainty therein.
KINGSTONRESOURCES.COM.AU | ASX: KSN 13
Annexure 1 - Summary of the conditions precedent and
termination events in Underwriting Agreement
Summary of termination events and conditions precedent to underwriting in the
Underwriting Agreement between the Company and Argonaut Corporate Finance
Limited
Part 1 – Non-materiality qualified Termination Events
(Material Adverse Change) any material adverse change occurs.
(Listing) The Company ceases to be admitted to the official list of ASX or the Shares cease
to be quoted on ASX after the Announcement Date, or it is announced by ASX or the
Company that such an event will occur.
(ASX approval) Unconditional approval by ASX for official quotation of the Entitlement
Shares is refused or is not granted by the time required to conduct the Offer in accordance
with the Timetable or, if granted, is modified or withdrawn.
(Insolvency) The Company or a Subsidiary is Insolvent or there is an act or omission, or a
circumstance arises, which is likely to result in the Company or a Subsidiary becoming
Insolvent.
(Defect) There is a defect or circumstances arise that gives rise to a defect, meaning:
I. a material statement in any Offer Document is a misleading or deceptive
statement;
II. an Offer Document has omitted from it a matter or thing, the omission of which
renders that (or any other) Offer Document misleading in a material respect; or
III. in respect of the cleansing notice, it is defective
(Withdrawal and withdrawal rights) The Company notifies any Underwriter or ASX in
writing that it does not wish to proceed with all or any part of the Offer or the Company
repays monies received pursuant to the Offer or the Company offers applicants under the
Offer the opportunity to withdraw their application for Shares and be repaid their
application money.
(Takeovers Panel) The Takeovers Panel makes, or an application is made to the Takeovers
Panel seeking, a declaration that circumstances in relation to the affairs of the Company
are unacceptable circumstances under Pt 6.10 of the Corporations Act, except in
circumstances where the application has not become public and it has been withdrawn
by the date that is the earlier of:
I. 5 Business Days immediately preceding the Settlement Date; or
II. the date that is two Business Days after the application is received.
(Application) There is an application to a court or Governmental Agency (including the
Takeovers Panel) for an order, declaration (including of unacceptable circumstances) or
KINGSTONRESOURCES.COM.AU | ASX: KSN 14
other remedy in connection with the Offer (or any part of it), except in circumstances
where the application has not become public and it has been withdrawn by the date that
is the earlier of:
I. 5 Business Days immediately preceding the Settlement Date; or
II. the date that is two Business Days after the application is received.
(Offer force majeure) There is an event or occurrence, including any statute, order, rule,
regulation, directive or request of any Governmental Agency, which makes it illegal for
either of the Underwriter to satisfy an obligation of the agreement, or to market, promote
or settle the Offer.
(Board or KMP changes) There is any change to the Board or KMP of the Company, or a
prospective change is announced with regards to the Board or KMP.
(ASIC or ASX correspondence): The Company receives correspondence from ASX or ASIC
which in the reasonable opinion of any or all Underwriter would cause or contribute to a
material adverse change.
(Regulatory action in relation to directors and senior executives):
I. a director or the chief executive officer or chief financial officer of the Company is
charged with an indictable offence or fraudulent conduct;
II. any director of the Company is disqualified under the Corporations Act from
managing a corporation; or
III. any regulatory body (other than the Takeovers Panel) commences any public
action against the Company, or any director or the chief executive officer or chief
financial officer of the Company, or publicly announces that it intends to take any
such action.
(Conduct) The Company or a current director, officer or other current KMP of the
Company or any Group Member commits any act of fraud, wilful or reckless misconduct
or negligence, or which is misleading or deceptive in any respect, whether by act or
omission and whether or not in connection with the Offer or is charged with having
committed any of the foregoing.
(Unable to issue) The Company is unable to issue or prevented from issuing the
Placement Shares or the Entitlement Shares as contemplated by the agreement,
including by virtue of the ASX Listing Rules, applicable laws, a Governmental Agency, or
an order of a court of competent jurisdiction within the period required by the ASX Listing
Rules or Timetable.
(Capital structure) There is an alteration to the Company's capital structure without the
prior consent of the Underwriter or as otherwise provided in the agreement or contained
within the ASX Disclosures.
(Market fall) The S&P/ASX 200 Index on and from the date of the agreement up to and
including the Settlement Date, has fallen to a level that is 12.5% or more below its level as
at the close of trading on the Business Day before the date of the agreement.
KINGSTONRESOURCES.COM.AU | ASX: KSN 15
(ASIC action) ASIC:
I. applies for an order under Part 9.5 in relation to the Offer or any Information
Document; or
II. holds, or gives notice of intention to hold, a hearing or investigation in relation to
the Offer or any Information Document under the Corporations Act or the
Australian Securities and Investments Commission Act 2001 (Cth); or
III. prosecutes or gives notice of an intention to prosecute or commences proceedings
against, or gives notice of an intention to commence proceedings against the
Company or any of its officers, employees or agents in relation to the Offer or any
Information Document,
except in each case in circumstances where the existence of the application, hearing,
inquiry, investigation, prosecution or notice has not become public and it has been
withdrawn by the date that is the earlier of:
IV. 5 Business Days immediately preceding the Settlement Date; or
V. the date that is 2 Business Days after the application, hearing, inquiry, investigation,
prosecution or notice is commenced or received.
(Certificate) A Certificate which is required to be furnished by the Company under the
agreement is not furnished when required, or if furnished is untrue, incorrect or
misleading or deceptive in any respect (including by omission).
(Timetable) Any event specified in the Timetable is delayed by more than two Business
Days.
(Information Documents) Any:
I. statement in an Information Document is or becomes false, misleading or
deceptive in any material respect or likely to mislead or deceive (including by
omission);
II. Information Document does not contain all information required to comply with
all applicable laws; or
III. Information Document is withdrawn.
(Compliance) The Company commits a breach of the Corporations Act, ASX Listing Rules,
its Constitution, or other applicable laws.
(unauthorised change) The Company or a Group Member:
I. disposes, or agrees to dispose, of the whole, or a substantial part, of its business or
property;
II. ceases or threatens to cease to carry on business; or
III. amends its Constitution or other constituent document of a Group Member.
(Representations and warranties) A representation or warranty made or given by the
Company under the agreement is breached or proves to be, or has been, or becomes,
untrue or incorrect or misleading or deceptive.
KINGSTONRESOURCES.COM.AU | ASX: KSN 16
(Regulatory action) Any regulatory body commences any enquiry or public action
against a Group Member.
(New circumstance) A new circumstance arises which is a matter adverse to investors in
Entitlement Shares and which would have been required by the Corporations Act to be
included in the Information Documents had the new circumstance arisen before the
Information Documents were given to ASX.
(Litigation) Litigation, arbitration, administrative or industrial proceedings of any nature
are after the date of the agreement commenced against any Group Member or against
any director of the Company in their capacity as such.
(Offer Documents issued or varied without approval) The Company:
I. issues an Offer Document without the prior approval of the Underwriter (such
approval not to be unreasonably withheld or delayed); or
II. varies an existing Offer Document without the prior approval of the Underwriter
(such approval not to be unreasonably withheld or delayed).
(Contravention of constitution or applicable law) A contravention by a Group Member
of any provision of its constitution, the Corporations Act, the ASX Listing Rules or any other
applicable legislation or any policy or requirement of ASIC or ASX.
(Due Diligence) Any of the documents required to be provided under the Due Diligence
Planning Memorandum having been withdrawn, or varied without the prior written
consent of the Underwriter.
Part 2 – Materiality qualified Termination Events
(Breach) The Company fails to perform or observe any of its obligations under the
agreement including (for the avoidance of doubt) without limitation not receiving or
obtaining consent from the Underwriter wher