Mineral Hill delivering growth in gold and copper production
3.8Moz Misima Gold Project Definitive Feasibility Study complete
ASX: KSN
Disclaimer
Forward Looking Statements
Disclaimer
Certain statements contained in this presentation, including
information as to the future financial or operating performance of
Kingston Resources Limited (“KSN”) and its projects, are forward
looking statements. Such forward looking statements:
No representation or warranty, express or implied, is made as
to the fairness, accuracy, completeness or correctness of the
information, opinions and conclusions contained in this
presentation. To the maximum extent permitted by law, none
• include, among other things, statements regarding incomplete and of KSN, its directors, employees or agents, nor any other
person accepts any liability, including, without limitation, any
uncertain proposals or targets, production and prices, operating
liability arising out of fault of negligence, for any loss arising
costs and results, capital expenditures, and are or may be based
from the use of the information contained in this
on assumptions and estimates related to future technical,
presentation. In particular, no representation or warranty,
economic, market, political, social and other conditions;
express or implied is given as to the accuracy, completeness
• are necessarily based upon a number of estimates and
or correctness, likelihood of achievement or reasonableness
assumptions that, while considered reasonable by KSN, are
or any forecasts, prospects or returns contained in this
inherently subject to significant technical, business, economic,
presentation nor is any obligation assumed to update such
competitive, political and social uncertainties and contingencies;
information. Such forecasts, prospects or returns are by their
and
nature subject to significant uncertainties and
• involve known and unknown risks and uncertainties that could
contingencies.
cause actual events or results to differ materially from estimated
The information contained in this presentation is for
or anticipated events or results reflected in such forward looking
informational purposes only and does not constitute an offer
statements.
to issue, or arrange to issue, securities or other financial
KSN disclaims any intent or obligation to update publicly any forward
looking statements, whether as a result of new information, future
events or results or otherwise. The words “believe”, “expect”,
“anticipate”, “indicate”, “contemplate”, “target”, “scope”, “plan”,
“intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule”
and similar expressions identify forward looking statements. All
forward looking statements made in this presentation are qualified by
the foregoing cautionary statements. Recipients are cautioned that
forward looking statements are not guarantees of future performance
and accordingly investors are cautioned not to put undue reliance on
forward looking statements due to the inherent uncertainty therein.
www.kingstonresources.com.au I ASX: KSN
products. The information contained in this presentation is
not investment or financial product advice and is not
intended to be used as the basis for making an investment
decision. The presentation has been prepared without taking
into account the investment objectives, financial situation or
particular needs of any particular person. Before making an
investment decision, you should consider, with or without the
assistance of a financial adviser, whether an investment is
appropriate in light of your particular investment needs,
objectives and financial circumstances. Past performance is
no guarantee of future performance.
Exploration by Other Explorers
This presentation contains information sourced from
the reports of Other Explorers. References to the
original reports are provided as footnotes where the
information is cited in this presentation. KSN does
not vouch for the accuracy of these reports. KSN has
taken the decision to include this information as it is
in the public domain and as we assess it to be of
relevance to shareholders and investors.
Diamond Drilling at Pearse North
Corporate Presentation June 2023
2
Company vision
Becoming a leading ASX-listed mid-tier gold and copper producer, pioneering excellence and delivering
sustainable value to stakeholders
Two advanced 100%-owned gold & copper projects
Management team; jurisdictional experience and a track record of success
Aiming to double production and extend mine life from current resources
Exceptional gold & copper exploration upside
Existing approvals and infrastructure
Exceptional growth opportunity; strategic regional acquisition
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
3
A diversified portfolio of gold and copper projects
Unleashing exponential growth and value
Misima Gold Project, PNG (100%)
• DFS Validation: Affirming the potential for a robust, scalable, and low-cost open pit operation.
• Production Potential: Anticipated gold production of ~2.4Moz over a 20-Year Mine Life (Avg.
128kozpa).
• Strong Financial Viability: Pre-Tax Net Present Value (NPV) of A$956 Million (based on a
US$1,800/oz Gold Price).
• Gold Price Sensitivity: Highly leveraged to the upside of the gold price, amplifying potential
returns.
• Current Focus: Prioritizing ESIA reports, strategic funding & development strategies.
Mineral Hill Mine, NSW (100%)
• Sustained Cashflow: Leveraging gold and silver production for ongoing financial success.
• Infrastructure Excellence: Extensive CIL & flotation processing plant and advanced
underground development.
• Mining Expansion: Targeting resumption of open pit and underground operations during 2024.
• Exploration Potential: Exceptional upside within current Mining Leases (ML) and Exploration
Licenses (EL).
• Current Focus: Maximizing returns through Tailings Project gold production, proactive
exploration drilling, and strategic underground re-entry efforts.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
4
Corporate snapshot
Current
Share Price1
$0.11
Directors & Management
Mick Wilkes
Non-Executive Chairman
35+ years experience
Shares on Issue
415.6M
Andrew Corbett
Managing Director
25+ years experience
Market Capitalisation
$45.7M
Stuart Rechner
Non-Executive Director
20+ years experience
Enterprise Value
$40.7M
Tony Wehby
Non-Executive Director
35+ years experience
Cash2
$9.5M
Stuart Hayward
Chief Geologist
30+ years experience
Debt
$5.0M
Geoff Merrell
GM Mineral Hill
25+ years experience
12 month Share Price Performance
Shareholder Structure
MarketVolume ('000) (RHS)
Close Price (A$) (LHS)
$0.16
8,000
$0.14
7,000
$0.12
6,000
$0.10
5,000
$0.08
4,000
$0.06
3,000
$0.04
2,000
$0.02
1,000
$0.00
Jun-22
0
Aug-22
Oct-22
Dec-22
Feb-23
● Quintana
● Delphi
● Winchester Investments
● Farjoy
● BNP Paribas Nominees
● Other shareholders
13.2%
13.4%
8.1%
4.9%
4.5%
55.9%
Apr-23
1. Close of trading 13 June 2023. 2. Last reported cash balance, as at 31 Mar 2023
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
5
Mineral Hill
Overview
Corporate Presentation June 2023
6
Mineral Hill – strategic location
Significant organic and regional resource growth opportunities
Abundance of gold-silver and polymetallic Cobar-style
deposits within approved ML’s and within trucking distance
of Mineral Hill processing plant
Location
516km W of Sydney NSW in Cobar Basin
Ownership
100%: 20 ML’s (4.85km2) and 2 EL’s (335km2)
Reserves (recovered)1,2
53,000 AuEq oz
Resources (recovered)1,2 795,000 AuEq oz (40% Cu, 30% Au)
Orebody
Structure controlled polymetallic vein and
epithermal Au
Mining Methods
Open pit and underground long-hole stoping
Water
Supplied from underground and site storage
Power
Mains with grid upgrade
Historical Production
396koz Au, 33kt Cu (plus Pb, Zn concentrate)
1. Gold equivalent ounces calculated based on consensus commodity prices with adjustments based on company
expectations. See Appendix for equivalency calculations
2. See KSN ASX announcements on 18 November 2021, 24 November 2022, 15 March 2023, 21 March 2023 for
additional Mineral Hill Resource and Reserve information.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
7
Mineral Hill – mining lease and infrastructure
Extensive existing infrastructure enables accelerated path to
gold-silver dore, copper, lead and zinc production
EL1999
Pearse Nth
• History of underground and open pit mines
• Numerous gold-silver and polymetallic Cobar style mineral deposits all
within approved mining leases.
Mineral Resources
Additional Deposits
• Current cash flow from reprocessing historical tailings, owner miner.
• Full mine approvals, environmental permits & biodiversity offset,
tailings facilities, water and power all in place.
Pearse Sth
Hut
Processing Infrastructure
• CIL with 700ktpa
capacity
GD140
Parker’s Hill
• Flotation plant capacity
of 350ktpa
• 3 x separate base metal
concentrates; copper,
lead and zinc (superior
payability compared to
bulk concentrate).
www.kingstonresources.com.au I ASX: KSN
Parker’s Hill
East
TSF
SOZ
EL1999
Corporate Presentation June 2023
8
Mineral Hill – dynamic project pipeline
Initial LOM out to the end of 2028
2023
2024
2025
2026
2027
2028
Tailings reprocessing – Au & Ag
Unhedged gold production to March 2024
Processing plant refurbishment
Recommission crushing, grinding and flotation
Open pit mining
Pearse North & South
Open pit processing – Au & Ag
Gold concentrate & dore
Underground mining (SOZ & Jack’s Hut)
Two declines in place
Underground processing – Cu, Pb, Zn & Au/Ag
Cu, Pb and Zn concentrates
Parker’s Hill / GD140 / Red Terror
Resource estimate updates in CY23
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
9
Mineral Hill Mine – Resources & Reserves
Attractive commodity base with significant growth potential
• High grade Pearse open pit Mineral Resources.
• Polymetallic underground Mineral Resources.
• Additional resource areas to be estimated in CY23
(Parker’s Hill & Red Terror)
TSF
Total Probable Reserve Inventory
Pearse South
Deposit
Ag
(g/t)
Cu
%
Pb
%
Zn
%
Au
(Koz)
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
1,171
1.07
0
40
204
3.77
70
25
456
Pearse North
239
2.97
25
23
190
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
34
60
54
1,171
1.07
Pearse South
140
4.00
84
18
375
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
Pearse North
120
3.40
25
13
95
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
1,431
1.6
57
71
470
TOTAL
8,901
1.13
26
1.0%
1.6%
1.1%
323
6,566
72
113
81
www.kingstonresources.com.au I ASX: KSN
Ag (Koz)
Au
(g/t)
Au (g/t)
TOTAL
Au (Koz)
Kt
Kt
TSF
Ag (g/t)
Total Mineral Resources
Deposit
40
Corporate Presentation June 2023
10
Mineral Hill – leveraging existing gold production from the Tailings Project
Tailings processing with CIL capacity up to 700ktpa
• Optimised the Tailings Project; increased
throughput rates and increased recovery.
Gold Production
oz
Gold Sold (oz)
• Gold production increased significantly, leading
to reduced costs since the start of the project.
A$/oz
• Owner mining focus to drive down costs.
2,000
AISC (A$/oz)
• Mining of the tailings facility allows it to be rebuilt
for future tailings storage.
1,500
1,000
500
0
Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23
Figure: Tailings Mining Project – current high margin gold production
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
11
Open pit Ore Reserve: high grade gold & silver
The first component of the LOM plan to recommence hard rock mining
• Updated Ore Reserve1 in 2022.
• Metal pricing of US$1800/oz for gold, US$24/oz for silver and
exchange rate (AUD/USD) of 0.70.
• Pearse South will be a cutback and deepening of the existing pit.
• Pearse North is a new pit.
• Both pits are fully permitted with all management plans and
environmental approvals in place.
• Gold recovered via dore and gold concentrate.
Mineral Resource
Figure: Pearse North and South pit designs
Tonnes (kt)
Au g/t
Ag g/t
Au koz
Ag koz
Pearse South
204
3.77
70
25
456
Pearse North
239
2.97
25
23
190
Ore Reserve
Tonnes (kt)
Au g/t
Ag g/t
Au koz
Ag koz
Pearse South
140
4.0
84
18
375
Pearse North
120
3.4
25
13
95
1. See KSN ASX announcement on 15 March for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
12
Underground Mineral Resources
Southern Ore Zone and Jack’s Hut (Cu-Au-Zn-Pb-Ag)
• Polymetallic Mineral Resources estimated for the
Southern Ore Zone (SOZ) and Jack’s Hut1.
• Targeting recommencement of underground mining,
leveraging the existing decline development and
infrastructure for low-cost restart.
• Substantial Mineral Resource growth potential at
depth and along strike with additional drilling.
Mineral
Resource
Tonnes (Mt)
Au g/t
Ag g/t
Cu %
Pb %
Zn %
3.80
1.29
19
0.9
1.6
1.4
Mineral
Resource
Tonnes
(Mt)
Au g/t
Ag g/t
Cu %
Pb %
Zn %
Jack’s Hut
1.60
1.25
20
0.9
0.8
0.6
SOZ
Open
Open
Figure: SOZ- long section demonstrates the infrastructure advantage of the SOZ with existing decline and level development
1. See KSN ASX announcements on 24 November 2022, 21 March 2023 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
13
Advanced near mine development plan
5
Resource expansion strategy and near mine
exploration
EL1999
Pearse Nth
• Drilling at Pearse North to test Inferred and for pit slope
analysis.
• Drilling at SOZ to test Inferred and determine potential
stope spans.
Pearse Sth
• Drilling from underground to test SOZ Inferred and find
extensions.
2
4
3
• Surface RC/diamond drilling at Jack’s Hut – infill shallow
levels and find extensions to modelled structures.
GD140
Jack’s Hut
EOZ
• RC/Diamond drilling near mine geophysical targets
1
Southern Ore Zone (SOZ) Extension.
2
South Aurum (Pearse Corridor).
3
Ashes Graben.
4
Parkers Hill East.
5
Bogong Prospect.
www.kingstonresources.com.au I ASX: KSN
Parker Hill
TSF
SOZ
EL1999
1
EL1999
Corporate Presentation June 2023
14
Exploration within EL1999
Multiple drill targets to be tested
• Several near mine targets with potential to significantly
expand contained copper and gold.
• Lead is the primary pathfinder element for polymetallic
mineralisation.
• Geochemical anomalies coincident with IP chargeability
anomalies.
• Broadly aligned with magnetics linears and domains.
MLs
• Multiple untested targets
IP chargeability
Cyprus Pines Cu geochemistry
Cyprus Pines Pb geochemistry
Au+ soil geochemistry
EL1999
Subtle Pb-Zn-Bi soil geochemistry
Area of interest with multiple overlapping geochemistry & IP signatures
Axis of best in hole RAB geochemistry anomaly
Lithological unit boundary
EL boundary
ML boundary
Road
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
15
Regional exploration
Broader exploration strategy within EL8334
• Drilling to target coincident geophysical
targets (gravity and induced polarisation).
• Highly prospective geology and regional
scale structures.
• Lead in soil anomalies to be drill tested.
• Land access agreements in progress.
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
16
Misima
Gold Project
Corporate Presentation June 2023
17
Misima Gold Project
PNG − home of world-class mines
6
SIMBERI
St Barbara
Moz
66
Moz
LIHIR
Newcrest Mining
17
Moz
FRIEDA RIVER
PanAust
PORGERA
24
Barrick Gold
Moz
2
Moz
23
PANGUNA
Moz
27
Moz
OK TEDI
PNG Govt.
17
Moz
KAINANTU
K92 Mining
WAFI-GOLPU
Morobe Mining JV
HIDDEN VALLEY
Harmony Gold
Papua
New Guinea
WOODLARK
Geopacific
4
2
1.6
Moz
Moz
GOLD RIDGE
Moz
TOLUKUMA
2
Moz
PORT MORESBY
www.kingstonresources.com.au I ASX: KSN
7
Moz
Misima Project
600km from Port Moresby
DFS Complete
Historically produced 4Moz AuEq
over 15 years
Corporate Presentation June 2023
18
Misima – long-life, large scale gold project
1.73Moz Reserve underpins long-life Misima Project1
• Total Mineral Resource of 169Mt @ 0.71g/t Au for 3.8Moz
• Probable Ore Reserve increased by 28% to 76 @ 0.8 g/t for 1.73Moz
• Ore Reserve –mine plan delivers 15-year mine life
• Production Target – mine plan delivers 20-year mine life
Reserve
Probable
Au grade
(gt / Au)
0.79
Tonnes (Mt)
75.6
koz
Au
(Moz)
1.9
Ag grade (gt /Ag)
4.5
Poured gold
Ag
(Moz)
10.9
Recovery
100%
160
140
95%
120
100
90%
80
60
85%
40
20
Figure: Historical photograph C. 1990-1994
80%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
19
Misima – definitive feasibility and ore reserve1
Large scale, long-life, low-cost open pit gold and silver mine
• High leverage opportunity on the gold price.
• DFS uses $1,800/oz gold price and 0.7 AUD:USD.
Gold price scenario of $2,000/oz lifts LOM NPV to
$1.3bn.
3.8Moz Gold
22.1Moz Silver
Resource
Resource
1.73Moz Gold
4.1Moz Silver
Ore Reserve
Ore Reserve
2.4Moz
$956M pre-tax
NPV with
22% IRR
• Work is continuing to find optimal funding and
development options.
Production at AISC
A$1,217/oz
20-year life of mine
LOM Revenue $6.1bn
and
LOM pre-tax FCF
$2.7bn
Extensive
mining history
de-risks development
pathway
1. See KSN ASX announcements on 6 June 2022 for further detail
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
20
Summary: focus on executing our clearly defined strategy
Leveraging existing gold-copper asset base while advancing future growth opportunities
Experienced management team focused on maximising
shareholder returns
Mineral Hill holds an extensive Resource base, gold
production and cashflow, outstanding copper potential
Focused gold-copper exploration and long life
development plan at Mineral Hill
Figure: KSNDDH015 - 71.9m: Chalcopyrite vein. Sample
interval 71.6m to 72.3m: 5.5% Cu, 0.5g/t Au, 13g/t Ag.
Misima holds a large-scale, low-cost, long life, production
opportunity as we progress the strategic review
Platform for growth from Mineral Hill cashflow and
optionality with the Misima gold project
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
21
Appendix
Corporate Presentation June 2023
22
Mineral Hill Mine
Environmental and social licence to operate
• Stakeholder engagement – excellent relationship with landholders, community and Condobolin Chamber of Commerce
• Mining Licences (ML) granted
• Environment protection, cyanide and water permits in place
• Environmental Bonds in place with a staged payment schedule
• Development Applications (DA) approvals in place for tailings
(TSF), Pearse pits, SOZ underground
• Mine Operation Plan (MOP) in place for the tailings
retreatment, update required before re-commencing hard rock
mining
• Biodiversity offset in place, review underway to increase offset
by March 2023
• Dam Safety NSW site review complete
• Tailings Dam strategy
• TSF1 currently being re-processed, approval will be sought
for re-use as tailings storage on completion
• TSF2 approved, lift 4 & 5 designed providing storage
capacity for 2.5 years
www.kingstonresources.com.au I ASX: KSN
Corporate Presentation June 2023
23
Competent Person Statement
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Mineral Hill
The information in this report that relates to the reporting of the Mineral Hill Mine Mineral Resource Estimate is based on
and fairly represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG
,who is a Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston
Resources Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of
the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that
the information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original report.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2004 JORC Code – Mineral Hill
The information in this release that relates to Mineral Resources is based on information reviewed by Mr. Stuart Hayward
(BAppSc (Geology)) MAIG, who is a Member of The Australian Institute of Geoscientists and a full-time employee of Kingston
Resources Limited. Mr Hayward has sufficient experience in the style of mineralisation and types of deposit under
consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the
‘Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in the report of the matters based on his information in the form and
context in which it appears. All Mineral Resource estimates were prepared and first disclosed under the JORC Code 2004
and are an accurate representation of the available data and studies for the Mineral Hill Mine. This information has not been
updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was
last reported. Work will commence on close of acquisition by the Company to bring each of the Mineral Resources into line
with the JORC Code 2012.
Competent Person’s Statement – Ore Reserve Reported in Accordance with JORC Code – Mineral Hill
The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code
2012 with exception of the Parkers Hill Mineral Resource Estimates that have been prepared by a Competent Person in
accordance with the JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the
information has not materially changed since it was last reported. Pearse, Parkers Hill, Jacks Hut and the Southern Ore Zone
Mineral Resource estimates and Ore Reserves have been adjusted by mining depletion using the production wireframes
created by the site survey department at the time of mining. These wireframes represent the mining activities at these
deposits to the best of Kingston’s knowledge although they are not to be viewed as complete or accurate in their entirety and
therefore mining depletion may be revised when Kingston is able to produce revised determinations on more complete data
and verification thereof. Information pertaining to Mineral Resource Estimates (MRE) and Ore Reserves (OR) in this
presentation has been previously released to the public. The tables on this page indicate the authors of the historical
Resources/Reserves and the dates they were initially published. Kingston is not reporting these estimates as its own with
exception of the MRE and OR for the TSF which has not been reported previously by any other company. The other original
reports are available through the ASX website.
The Competent Person (JORC 2012) for the TSF Ore Reserve is Mr Jeremy Peters (BSc, BEng) a Fellow of the Australasian
Institute of Mining and Metallurgy and Chartered Professional Geologist and Mining Engineer of that organisation. Mr Peters
is a full-time employee of Burnt Shirt Pty Ltd and has sufficient relevant experience to act as Competent Person.
The Competent Person signing off on the overall Pearse Opencut Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of
www.kingstonresources.com.au I ASX: KSN
Australian Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and
who has sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to
the inclusion in this report of the information pertaining to the Pearse Opencut Ore Reserve in the form and context in which
it appears.
Competent Person’s Statement - Mineral Resource Reported in Accordance with 2012 JORC Code – Misima
The information in this report that relates to the reporting of the Misima Mineral Resource Estimate is based on and fairly
represents, information and supporting documentation compiled by Mr. Stuart Hayward (BAppSc (Geology)) MAIG ,who is a
Member of the Australian Institute of Geoscientists. Mr. Stuart Hayward is a full-time employee of Kingston Resources
Limited. Mr. Hayward has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Hayward confirms that the
information in the market announcement provided is an accurate representation of the available data and studies for the
material mining project and consents to the inclusion in this report of the matters based upon the information in the form
and context in which it appears. The Company confirms that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original report.
Competent Person’s Statement – Ore Reserve Reported in Accordance with 2012 JORC Code – Misima
The Competent Person signing off on the overall Misima Ore Reserves Estimate is Mr John Wyche BE (Min Hon), of Australian
Mine Design and Development Pty Ltd, who is a Fellow of the Australasian Institute of Mining and Metallurgy and who has
sufficient relevant experience in operations and consulting for open pit metalliferous mines. Mr Wyche consents to the
inclusion in this report of the matters based upon the information in the form and context in which it appears.
Kingston confirms that it is not aware of any new information or data that materially affects the information included in all
ASX announcements referenced in this release, and that all material assumptions and technical parameters underpinning
the estimates in these announcements continue to apply and have not materially changed.
Ore Reserve
Deposit
JORC
ASX Announcement
Competent Person
Company
Misima
2012
KSN 06/06/2022
John Wyche
AMDAD
TSF
2012
KSN 18/11/2021
Jeremy Peters
Burnt Shirt
Pearse North
2012
KSN 15/03/2023
John Wyche
AMDAD
Pearse South
2012
KSN 15/03/2023
John Wyche
AMDAD
Company
Mineral Resource
Deposit
JORC
ASX Announcement
Competent Person
Misima
2012
KSN 15/09/2021
Stuart Hayward
KSN
TSF
2012
KSN 18/11/2021
Troy Lowien
Groundwork Plus
Pearse South
2012
KSN 15/03/2023
Stuart Hayward
KSN
Pearse North
2012
KSN 15/03/2023
Stuart Hayward
KSN
KSN
Southern Ore Zone
2012
KSN 24/11/2022
Stuart Hayward
Jack’s Hut
2012
KSN 21/03/2023
Stuart Hayward
KSN
Parkers Hill
2004
KBL 13/09/2011
Anthony Johnston
KBL
Corporate Presentation June 2023
24
Mineral Hill – Resources and Reserves
Attractive commodity base with significant growth potential
Total Probable Reserve Inventory
Measured Resource Inventory
Kt
Au
(g/t)
1,171
1.07
Pearse South
140
4.00
84
18
375
Pearse North
120
3.40
25
13
95
1,431
1.6
57
71
470
Deposit
TSF
TOTAL
Ag
(g/t)
Au
(Koz)
Ag
(Koz)
40
Deposit
Kt
Au
(g/t)
Ag
(g/t)
Cu
%
Pb
%
Zn
%
Au
(Koz)
Ag
(Koz)
Cu
(Kt)
Pb
(Kt)
Zn
(Kt)
Southern Ore Zone
228
2.11
11
1.3%
0.5%
0.3%
15
79.9
3
1
1
TOTAL
228
2.11
11
1.3%
0.5%
0.3%
15
80
3
1
1
24
Indicated Resource Inventory
TSF
Total Mineral Resources
Pearse South
Au
(Koz)
Ag
(Koz)
40
22
450
1,171
1.07
0
40
204
3.77
70
25
Pearse North
239
2.97
25
23
190
Southern Ore Zone
3804
1.29
19
0.9%
1.6%
1.4%
158
2349
34
60
54
Jack's Hut
1640
1.25
20
0.9%
0.8%
0.6%
66
1051
15
14
10
Parkers Hill
1843
0.19
43
1.3%
2.1%
0.9%
11
2520
23
39
17
Pearse South
40
2
5
3
6
TOTAL
8,901
1.13
26
1.0%
1.6%
1.1%
323
6,566
72
113
81
Pearse North
15
2.50
21
1
10
75
1,231
Cu (Kt)
Pb
(Kt)
85
Kt
Pearse South
Zn
%
4.10
Ag
(g/t)
TSF
Pb
%
1.07
164
Au
(g/t)
Deposit
Cu
%
1,171
Zn (Kt)
456
Pearse North
224
3.00
25
22
180
1,622
1.28
20
1.0%
1.8%
1.5%
67
1,038
16
29
Jack's Hut
608
1.53
7
1.3%
0.5%
0.4%
30
134
8
3
2
Parkers Hill
1,793
0.191
42
1.3%
2.1%
0.9%
11
2,443
23
38
16
TOTAL
5,582
1.06
30
1.2%
1.7%
1.1%
191
4,244
47
70
42
14
30
29
Southern Ore Zone
Inferred Resource Inventory
• The Ore Reserve and Mineral Resources estimates were prepared by a Competent person in accordance with the JORC Code 2012
Southern Ore Zone
1,954
1.20
with exception of the Parkers Hill Mineral Resource Estimate, which been prepared by a Competent Person in accordance with the
1,032
1.09
JORC Code 2004 and have not been updated to comply with the JORC Code 2012 on the basis that the information has not materially Jack's Hut
changed since it was last reported. Pearse South, Parkers Hill and th
Share your feedback
Discover